Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8171-8180 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211772 | Project ID: 211772 DEA: 043G4624 EFIS: 0412000062 | 04-CC-680-25.0-25.4 | Floor Beam Mitigation at Benicia-Martinez Bridge (28-0153L) | Benicia-Martinez Bridge Floor Beam Mitigation Project | 11/12/2019 | 1 (09/23/2016) | Details CEM-3701 Report |
| 7437 | Project ID: 7437 EFIS: 0000001155 Permit Numbers: 03116DP0753 | 03-NEV-20-13.07/13.12 | Transit Center | Bennett and Bank Street, Grass Valley | 04/27/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 7441 | Project ID: 7441 EFIS: 0000001155 Permit Numbers: 0310NBS0321 | 03-NEV-20-13.07/13.12 | Transit Center | Bennett and Bank Street, Grass Valley | 04/27/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 7716 | Project ID: 7716 EFIS: 0000001155 Permit Numbers: 0312NRT0549 | 03-NEV-20-13.07/13.12 | Transit Center | Bennett and Bank Street, Grass Valley | 04/27/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 209932 | Project ID: 209932 DEA: 081F8004 EFIS: 0815000048 | 08-SBD-95,095-0.0/21.0,21.0/31.0 | Repair roadway | Between 2.3 miles north of Twin Palms Resort and 2.7 mile south of Wilson Road in County of Riverside. and On 95 between County line | 11/19/2014 | 1 (10/14/2014) | Details CEM-3701 Report |
| 214664 | Project ID: 214664 DEA: 081G7404 EFIS: 0816000060 | 08-SBD-15-R110.0 | RECONSTRUCT EARTHEN DIKE, PLACE STRUC. STEEL BRIDGE & TORTOISE FENCE. | BETWEEN BARSTOW AND BAKER AT 1.6 MILES SOUTH OF AFTON ROAD OVERCROSSING | 06/30/2021 | 1 (06/23/2021) | Details CEM-3701 Report |
| 994317 | Project ID: 994317 DEA: 040K0304 EFIS: 0416000016 COOP: 042808 | 04-SCL-680-1.4/2.3 | THIS PROJECT WILL CONSTRUCT SOUNDWALLS ALONG INTERSTATE 680 (I-680) | BETWEEN CAPITOL EXPRESSWAY AND MUELLER AVENUE IN SAN JOSE. | 2 (10/06/2022) | Details CEM-3701 Report | |
| 208713 | Project ID: 208713 DEA: 043A7754 EFIS: 0400002042 COOP: 042301 | 04-ALA-80-1.90/8.00, 0.0/13.5 | Variable speed limit signs, variable/changeable message signs, dynamic message signs and lane use signals | Between Carquinez Bridge to San Francisco-Oakland Bay Bridge. | 07/12/2019 | 1 (03/22/2013) | Details CEM-3701 Report |
| 4365 | Project ID: 4365 DEA: 074L2404 | 07-VEN-150-22.5 | REBUILD ROADBED SLOPE W/ROCK SLOPE PROTECT | BETWEEN CITIES OF OJAI & SANTA PAULA 6 LOCOF FAILED ROADBED SUPPORT AT POST MILES:22.52,22.59,22.62,22.80,23.52 AND 23.71 DIR'S EMERGENCY F.A. CONTRACT | 08/10/2010 | 1 (08/10/2010) | Details CEM-3701 Report |
| 213971 | Project ID: 213971 DEA: 060Y2304 EFIS: 0619000103 COOP: 061697 | 06-FRE-180-R9.0/R23.5 | Alignment of Route 180 | Between I-5 and Route 33 (Mendota) | 1 (06/14/2019) | Details CEM-3701 Report |
