Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8121-8130 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211059 | Project ID: 211059 Permit Numbers: 1114NMC0692 11156DP0533 1115NRT0778 11156RT0779 | 11-IMP-115-9.13/9.29 | enter upon the State Highway right of way in Imperial County, City of Holtville, on Route 115, post mile 9.13 to 9.29, to improve pavement, curb & gutter, curb return, traffic signs and install a bus shelter along State Route (SR)-115, as shown on the attached plan, in accordance with the requi | ROUTE 115, HOLTVILLE | 08/07/2018 | 1 (01/25/2016) | Details CEM-3701 Report |
| 211038 | Project ID: 211038 Permit Numbers: 0615AOP0509 | 06-KER-99-25.8/26.2 | Enter upon the State Highway Right-of-way on State Route 99 (SR 99) in Kern County to set up, maintain, and remove temporary traffic control necessary to construct the City of Bakersfield SR 99/Rosedale Hwy Off-Ramp Improvement Project. The Project include, but not limited to, construct an auxilia | SR-99/Rosedale Hwy, Bakersfield | 11/30/00-1 | 1 (05/08/2019) | Details CEM-3701 Report |
| 211081 | Project ID: 211081 DEA: 11426304 | 11-SD-163-8.81 | Repair damaged girders to the Clairemont Mesa Blvd. O/C. on SB Route 163 | 1 (12/17/2015) | Details CEM-3701 Report | ||
| 211043 | Project ID: 211043 DEA: 030G4604 | 03-SAC-12-3.6,5.6 | REPLACE AC SURFACING | IN SACRAMENTO COUNTY NEAR RIO VISTAAT JACKSON SLOUGH ROAD AND ATTERMINOUS ROAD | 11/07/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
| 211045 | Project ID: 211045 DEA: 080G9004 EFIS: 0800020175 | 08-SBD-247-9.6/20.3 | WIDENING SHOULDERS | 08/09/2018 | 1 (09/21/2016) | Details CEM-3701 Report | |
| 211046 | Project ID: 211046 DEA: 080R7104 | 08-SBD-15-R87.3/R91.8 | INSTALL SINGLE & DOUBLE THRIE BEAM BARRIER IN MEDIAN | NEAR BARSTOW FROM AGRICULTURAL INSPECTION STATION TO COYOTE LAKE ROAD OC | 07/13/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 211047 | Project ID: 211047 DEA: 081C0914 EFIS: 0814000223 | 08-RIV-60-R12.2/22.1&26.5/30.4 | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS | MILL AND OVERLAY MAINLINE PAVEMENT, SHOULDERS, RAMPS, INCLUDE DIGOUTS | 08/09/2018 | 1 (06/24/2016) | Details CEM-3701 Report |
| 211048 | Project ID: 211048 DEA: 081E8704 EFIS: 0814000116 | 08-SBD-395-46.0/73.5 | COLD PLANE & OVERLAY MAINLINE & SHOULDERS & INSTALL RUMBLE STRIPS | COLD PLANE & OVERLAY MAINLINE & SHOULDERS & INSTALL RUMBLE STRIPS | 10/16/2017 | 1 (09/12/2016) | Details CEM-3701 Report |
| 211049 | Project ID: 211049 DEA: 100Y1004 EFIS: 1013000268 | 10-STA-99-R11.7/R15.0 | INSTALL DOUBLE LUMINAIRE. | IN STANISLAUS COUNTY IN AND NEARCERES FROM NORTH STREET UNDERCROSSING TO TUOLUMNE RIVER BRIDGE | 04/11/2017 | 1 (03/24/2016) | Details CEM-3701 Report |
| 211050 | Project ID: 211050 DEA: 100Y6404 EFIS: 1013000270 | 10-STA-5-17.3/25.5 | CONSTRUCT CABLE MEDIAN BARRIER. | IN STANISLAUS COUNTY NEAR WESTLEY ON I-5 FROM HANSEN ROAD TO HAMILTONROAD | 11/14/2016 | 1 (10/19/2016) | Details CEM-3701 Report |
