Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8051-8060 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2535 | Project ID: 2535 DEA: 050A8004 EFIS: 0500000015 MINOR: 05A1167 | 05-SLO-101-42.3 | PAVING AND DRAINAGE REPAIR | San Luis Obispo County in Atascadero at the Santa Barbara Road Park and Ride Lot | 03/19/2020 | 1 (11/04/2019) | Details CEM-3701 Report |
| 212086 | Project ID: 212086 DEA: 071XC304 EFIS: 0717000223 | 07-LA-210-20.6, 20.60 | Pavement, place CIPP in existing culverts. | 08/23/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 1001684 | Project ID: 1001684 DEA: 051J8304 EFIS: 0518000078 | 05-SCR-129,152-L0.0/0.6,T2.8/1.2 | PAVEMENT, LIGHTING, CURB RAMPS, SIDEWALK, BIKE LANES, TMS, CROSSWALKS. | SANTA CRUZ COUNTY IN AND NEAR WATSONVILLE ON ROUTE 129 FROM ROUTE 1/129 SEPARATION TO SALSIPUEDES CREEK BRIDGE AND ON ROUTE 152 FROM MAIN STREET TO MARTINELLI STREET | 1 (11/03/2025) | Details CEM-3701 Report | |
| 212162 | Project ID: 212162 Permit Numbers: 0415NMC0418 0416NRW1780 0417NRW0288 | 04-ALA-880-31.3/31.3 | Pavement widening /Reconstruction due to lane addition at NB Rt 880 5th Ave off ramp and 5th Ave reconstruction under the existing Rt 880. | Embarcadero Road, Oakland | 08/22/2018 | 2 (03/03/2017) | Details CEM-3701 Report |
| 994010 | Project ID: 994010 DEA: 043Q8804 EFIS: 0419000277 | 04-MRN-101-1.0/2.5 | Pavement surface treatment & modify drainage systems | 05/22/2023 | 1 (08/23/2022) | Details CEM-3701 Report | |
| 214692 | Project ID: 214692 DEA: 060Y4504 EFIS: 0618000222 | 06-MAD-152-R0.0/15.6 | PAVEMENT STRIPING AND MODIFY TRAFFIC MONITORING STATIONS. | MADERA COUNTY NEAR CHOWCHILLA FROM ROUTE 152/59 SEPARATION TO 0.1 MILE EAST OF ROUTE 152/99 SEPARATION | 04/16/2021 | 1 (02/11/2020) | Details CEM-3701 Report |
| 213157 | Project ID: 213157 DEA: 074W2104 EFIS: 0718000054 | 07-LA-10-17.0/33.2,42.4/48.3 | PAVEMENT STRIPING | LOS ANGELES COUNTY IN LOS ANGELES AND POMONA FROM 0.2 MILE WEST OF LOS ANGELES RIVER BRIDGE AND OVERHEAD TO PUENTE AVENUE UNDERCROSSING AND FROM ROUTE 57/10 SEPARATION TO MILLS AVENUE UNDERCROSSING | 01/25/2019 | 1 (05/17/2018) | Details CEM-3701 Report |
| 213158 | Project ID: 213158 DEA: 074W2304 EFIS: 0718000056 | 07-LA,VEN-101-0.0/38.2,0.0/43.6 | PAVEMENT STRIPING | LOS ANGELES AND VENTURA COUNTIES AND IN LOS ANGELES AND VENTURA FROM ROUTE 10/101 SEPARATION TO VENTURA COUNTY LINE | 01/28/2021 | 1 (01/25/2021) | Details CEM-3701 Report |
| 1001396 | Project ID: 1001396 DEA: 043X4604 EFIS: 0425000258 COOP: 04A7271 | 04-SON-1-19.68 | Pavement settlement and pavement cracking on highway 1. Repair pavement cracking and depression. | Sonoma County highway 1 PM 19.68 south of Jenner. | 1 (08/04/2025) | Details CEM-3701 Report | |
| 209704 | Project ID: 209704 DEA: 100W1904 EFIS: 1000020456 | 10-SJ-99-22.9/38.8 | PAVEMENT RESURFACING | SAN JOAQUIN COUNTY IN AND NEAR LODI FROM HAMMER LANE OVERCROSSING TO SACRAMENTO COUNTY LINE | 01/23/2017 | 1 (08/07/2014) | Details CEM-3701 Report |
