Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8051-8060 of 19515 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2399 | Project ID: 2399 DEA: 044M5404 EFIS: 0400001193 MINOR: 04A2416 | 04-SCL-9-10.9 | IMPROVE STREAM CHANNEL AND RESTORE SLOPE PROTECTION | 03/18/2025 | 2 (08/22/2019) | Details CEM-3701 Report | |
| 6474 | Project ID: 6474 DEA: 120164M4 EFIS: 1200000017 COOP: 120531 Permit Numbers: 1209NMC0354 | 12-ORA-90-.4/2.7 | Improve the intersection capacities at the Beach Blvd. (SR-39), Idaho Street, Euclid Street, and Harbor Blvd. intersections as part of the Imperial Highway (SR-90) Smart Street Project - from L.A./ Orange County line to east of Harbor Blvd, (Segment A) | 07/31/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 6475 | Project ID: 6475 EFIS: 0000001155 Permit Numbers: 1209NMC0357 | 12-ORA-90-5.625/5.8125 | improve the intersection capacity at the Associated Road intersection as part of the Imperial Highway (SR-90) Smart Street Project (Segment D).Improvements within the State right of way will include but not limited to: drainage and traffic signal modification | imperial highway, Brea | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 212357 | Project ID: 212357 DEA: 044K0904 EFIS: 0417000164 Permit Numbers: 0417NOP0443 04176DP0541 0417NRD0562 0415NMC2719 | 04-SM-84-25.8/26.5 | Improve the intersection of Bayfront Expressway at Chrysler Drive by widening to accommodate additional left turn-lanes and bike lanes; and install signing, striping, curb ramps, and sidewalk per approved Project 0417000256 (EA No. 4K0904), on State Highway 04-SM-84, Post Miles 25.8/26.5, in the Ci | Bayfront Expressway, Menlo Park | 08/22/2018 | 1 (05/05/2017) | Details CEM-3701 Report |
| 5529 | Project ID: 5529 Permit Numbers: 1008NMC0389 | 10-STA-219-2.2/4.2 | Improve the intersection of Dale Road/SR 219 intersection | 08/24/2018 | 2 (08/07/2014) | Details CEM-3701 Report | |
| 1249 | Project ID: 1249 DEA: 03401804 | 03-YUB-65-65 | IMPROVE TRAFFIC OPERATIONS | IN YUBA COUNTY IN WHEATLAND FROMMAIN STREET TO HOOPER STREET | 03/22/2011 | 1 (03/22/2011) | Details CEM-3701 Report |
| 1001904 | Project ID: 1001904 DEA: 042Q20U4 EFIS: 0422000181 | 04-SON-37-3.78/4.3 | Improve traffic operations at intersection. | Near Novato from Route 121 to 0.3 miles of Route 121, Tolay Creek Bridge (widen) | 1 (01/08/2026) | Details CEM-3701 Report | |
| 214962 | Project ID: 214962 DEA: 044G6804 EFIS: 0413000086 Permit Numbers: 04206DP0812 0420NOP0653 | 04-SCL-280,85-11.2/11.5 | Improve traffic operations by widening existing off-ramp from one land to two lanes; remove curb-and-gutter; remove and replace existing OH sign and street lighting, install concrete barrier, retaining wall, pavement overlay, and new signing and strping | I-280 between I-280/Foothill Expressway NB off-ramp and SR-85 branch connector | 1 (05/12/2020) | Details CEM-3701 Report | |
| 994523 | Project ID: 994523 DEA: 041K3004 EFIS: 0416000226 COOP: 042856 | 04-SCL-280-7.1/9.5 | Improve Traffic Operations, Wolfe Road | SCL 280/Wolfe Rd. Interchange | 2 (05/07/2026) | Details CEM-3701 Report | |
| 212195 | Project ID: 212195 DEA: 07309904 EFIS: 0714000310 | 07-LA-1,107,213-Var | IMPROVE TRAFFIC SIGNAL AND ITS MANAGEMENT SYSTEM. | LOS ANGELES COUNTY AT VARIOUS LOCATIONS | 04/30/2019 | NOT VERIFIED | Details CEM-3701 Report |
