Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8031-8040 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 211836 | Project ID: 211836 DEA: 060P2604 EFIS: 0612000076 MINOR: 06A2199 | 06-FRE-5-5.5 | Fre-5-5.5 @ Jayne Ave | Fresno County | 11/28/2022 | 1 (03/13/2017) | Details CEM-3701 Report |
| 211835 | Project ID: 211835 DEA: 101E3314 EFIS: 1016000011 MINOR: 10A1791 | 10-MER-165- | Install Standard Flashing Beacons | 12/06/2019 | 1 (10/13/2016) | Details CEM-3701 Report | |
| 211834 | Project ID: 211834 DEA: 043K1304 EFIS: 0417000093 | 04-SM-101-11.92 | Replace Joint Seal Assembly | In San Mateo City at the SB Rte 101 to EB Rte 92 connector ramp | 12/27/2017 | 1 (02/17/2017) | Details CEM-3701 Report |
| 211833 | Project ID: 211833 DEA: 041K5204 EFIS: 0416000257 | 04-SM-84-27.9, 27.90 | Repair Pump Station | SM & SCL pump stations: 35-0292W, 37-0259W,37-0267W,37-0318W | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 211832 | Project ID: 211832 DEA: 101G6104 EFIS: 1017000007 | 10-SJ-4- | Garwoods Bridge | 01/05/2023 | 1 (10/12/2016) | Details CEM-3701 Report | |
| 211831 | Project ID: 211831 DEA: 11392604 EFIS: 1114000081 MINOR: 11A2458 | 11--8-9.6 | 1 (10/12/2016) | Details CEM-3701 Report | |||
| 211830 | Project ID: 211830 DEA: 081G3804 EFIS: 0815000227 COOP: 081613 | 08-SBD-215-0.4 | Install Traffic Signal | 08/19/2021 | 2 (10/12/2016) | Details CEM-3701 Report | |
| 211829 | Project ID: 211829 Permit Numbers: 07066SN0583 07096RW1015 07176RT1823 07166RW1895 | 07-VEN-232-1.1 | Install new signal at new intersection with interconnect to Walnut Drive signals. | Forest Park Boulevard, Oxnard | 08/29/2018 | 1 (09/01/2017) | Details CEM-3701 Report |
| 211828 | Project ID: 211828 Permit Numbers: 11156MC0503 11166RW0787 | 11--75-10.97/11.01 | enter upon State Highway right of way in San Diego County, City of Imperial Beach, on Route 75, post mile 10.97-11.01, to perform highway improvements, as shown on the attached plans, in accordance with the attached Standard Plans List, and in accordance with the requirements and conditions contain | ROUTE 75, IMPERIAL BEACH | 08/07/2018 | 1 (10/19/2016) | Details CEM-3701 Report |
| 211827 | Project ID: 211827 DEA: 080E5514 EFIS: 0814000085 | 08-SBD-10,210,L5506-Var | INSTALL RMS, CCT, VDS, CMS, FO BACKBONE, ESU TRAFFIC OPS | SAN BERNARDINO COUNTY AT VARIOUS LOCATIONS | 04/22/2019 | 1 (03/20/2017) | Details CEM-3701 Report |
