Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 8021-8030 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 994481 | Project ID: 994481 DEA: 101N9504 EFIS: 1022000053 MINOR: 10A2465 | 10--5-R0.5/R5.6 | Replace cabinets and controllers | In San Joaquin County on I-5 and SR 120 | 1 (02/08/2023) | Details CEM-3701 Report | |
| 994089 | Project ID: 994089 DEA: 101Q2004 EFIS: 1022000252 | 10-SJ-5-49.2 | Repair Damage Pavement | In San Joaquin County near Thornton at Barber Rd Undercrossing | 1 (07/05/2022) | Details CEM-3701 Report | |
| 5903 | Project ID: 5903 DEA: 10401314 | 10-SJ-99-11.2 | RECONSTRUCT RAMPS AND SHOULDERS | IN SAN JOAQUIN COUNTY NEAR STOCKTON AT VARIOUS LOCATIONS | 01/06/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 5913 | Project ID: 5913 DEA: 10499004 | 10-SJ-26-26 | REALIGN EXISTING CURVE | IN SAN JOAQUIN COUNTY NEAR BELLOTAFROM CALAVERAS RIVER BRIDGE TO1.5 KM WEST OF DUCK CREEK BRIDGE | 04/08/2011 | 1 (06/16/2006) | Details CEM-3701 Report |
| 210879 | Project ID: 210879 DEA: 100X9704 EFIS: 1013000114 | 10-SJ-4,99-16.0/19.4,18.5 | INSTALL AUTOMATED WARNING SYSTEM | IN SAN JOAQUIN COUNTY IN STOCKTON ON ROUTE 4 FROM UNION STREETUNDERCROSSING TO ROUTE 99 AND ONROUTE 99 AT ROUTE 4/99 SEPARATION | 08/03/2018 | 1 (09/23/2015) | Details CEM-3701 Report |
| 5641 | Project ID: 5641 DEA: 100M8204 | 10-SJ-5-45.5/47.5 | IRRIGATION SYSTEM | IN SAN JOAQUIN COUNTY IN STOCKTON FROM SMITH CANAL BRIDGE TO RIVERDRIVE | 04/08/2011 | 1 (12/15/2006) | Details CEM-3701 Report |
| 5896 | Project ID: 5896 DEA: 103A4304 COOP: 2161A1CS | 10-SJ-99-17.1 | CONSTRUCT MEDIAN BARRIER | IN SAN JOAQUIN COUNTY IN STOCKTON AT VARIOUS LOCATIONS | 04/08/2011 | 1 (05/25/2006) | Details CEM-3701 Report |
| 209759 | Project ID: 209759 EFIS: 1013000175 MINOR: 10A1638 | 10-SJ-99-30.9 | BECKMAN & VICTOR ROAD INTERCHANGE LIGHTING | IN SAN JOAQUIN COUNTY IN LODI AT NORTHBOUND ON-RAMP FROM ROUTE 12. | 12/06/2019 | 1 (07/24/2014) | Details CEM-3701 Report |
| 5893 | Project ID: 5893 DEA: 103A1204 | 10-SJ-5-13.9 | WIDEN ROADWAY AND BRIDGES | IN SAN JOAQUIN COUNTY IN LATHROPFROM 0.1 KM NORTH OF PARADISE CUT OVERFLOW BRIDGE TO 0.7 KM NORTH OFROUTE 5 AND 120 SEPERATION OVERHEAD | 05/16/2011 | 1 (05/16/2011) | Details CEM-3701 Report |
| 211024 | Project ID: 211024 DEA: 101E4504 EFIS: 1015000100 | 10-SJ-5-R23.6/25.3 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA RESURFACEING. | IN SAN JOAQUIN COUNTY IN AND NEAR STOCKTON FROM DOWNING AVENUEUNDERCROSSING TO CHARTER WAYUNDERCROSSING | 01/23/2017 | 1 (03/10/2016) | Details CEM-3701 Report |
