Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7971-7980 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208734 | Project ID: 208734 DEA: 100W7004 EFIS: 1012000028 | 10-ALP,AMA,CAL,MPA,MER,STA,TUO-4,12,33,49,99,108,165-var | TREAT BRIDGE DECKS, REPLACE JOINT SEALS. | ALPINE, AMADOR, CALAVERAS, MARIPOSA, MERCED, STANISLAUS, AND TUOLUMNE COUNTIES AT VARIOUS LOCATIONS | 10/28/2014 | 1 (04/02/2013) | Details CEM-3701 Report |
| 208735 | Project ID: 208735 DEA: 100W7104 EFIS: 1012000029 | 10-SJ-205-L0.0,0.2 | REPLACE APPROACH SLABS, TREAT BRIDGE DECKS, AND REPLACE JOINT SEALS. | SAN JOAQUIN COUNTY NEAR TRACY AT AQUEDUCT SERVICE ROAD UNDERCROSSING AND AT DELTA-MENDOTA CANAL BRIDGE | 10/27/2014 | 1 (04/02/2013) | Details CEM-3701 Report |
| 208736 | Project ID: 208736 DEA: 11264114 EFIS: 1100000225 | 11-SD-163-1.4 | BRIDGE SEISMIC RETROFIT. | SAN DIEGO COUNTY IN SAN DIEGO AT LAUREL STREET BRIDGE OVERCROSSING. | 07/07/2015 | 1 (01/08/2014) | Details CEM-3701 Report |
| 208737 | Project ID: 208737 DEA: 112M1504 EFIS: 1112000123 | 11-SD-5,8,67,94,163-Var | CLEAN AND TREAT BRIDGE DECKS WITH METHACRYLATE AND REPAIR JOINT SEALS. | SAN DIEGO COUNTY AT VARIOUS LOCATIONS | 03/24/2014 | 1 (09/30/2013) | Details CEM-3701 Report |
| 208738 | Project ID: 208738 DEA: 11410004 EFIS: 1112000058 | 11-IMP-8-R73.1/R73.9 | REMOVE AC STRUCTURAL SECTION AND OVERLAY WITH HMA (TYPE C) AND MBGR. | IMPERIAL COUNTY AT GORDON'S WELL FROM 0.4 MILE WEST TO 0.4 MILE EAST OF GORDON'S WELL OVERCROSSING | 08/01/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 208739 | Project ID: 208739 Permit Numbers: 1013NRW0096 10126RC0285 | 10-MER-152-18.61/19.06 | Construct improvements necessary for the development of the northwest corner of State Highway 152 and Badger Flat Road. Work within the highway right of way includes extending the edge of the pavement to accommodate a westbound right hand turn lane, lane | SR 152, Los Banos | 01/16/2014 | 1 (03/25/2013) | Details CEM-3701 Report |
| 208740 | Project ID: 208740 DEA: 09355105 EFIS: 0912000038 MINOR: 09A0521 | 09-MNO-395-34.1 | Trenching, backfilling,excavation, asphalt remove and install of underground conduit | Rte 395 in MNO County | 01/01/2014 | 1 (05/15/2013) | Details CEM-3701 Report |
| 208741 | Project ID: 208741 DEA: 044H7904 EFIS: 0413000278 | 04-SM-1-16.4 | Repair Drainage System and Reconstruct Embankment | IN SM County, at 1.7 miles south of Rte 84 | 08/22/2018 | 1 (01/28/2015) | Details CEM-3701 Report |
| 208742 | Project ID: 208742 DEA: 060P9104 EFIS: 0612000307 COOP: 061526A2;061742 | 06-MAD-99,233,Ave26-26.2,26.92/3.58,3.887/3.887,4.31 | Construct Roundabout at Robertson Blvd, at AVE 26 and Widen Overcrossing with bike lane from 2 to 4 lanes | County of Madera | 2 (10/09/2013) | Details CEM-3701 Report | |
| 208743 | Project ID: 208743 DEA: 022E3504 EFIS: 0200000211 | 02-TRI-299-0.4/0.9 | CURVE IMPROVEMENT WITH HMA OVER AB AND CONSTRUCT RETAINING WALLS. | TRINITY COUNTY NEAR SALYER FROM 0.7 MILE TO 0.2 MILE WEST OF CAMPBELL RIDGE ROAD | 12/06/2016 | 1 (06/27/2013) | Details CEM-3701 Report |
