Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7961-7970 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210839 | Project ID: 210839 DEA: 051G8404 EFIS: 0515000111 | 05-SLO,SLO/SB-101-VAR | Reconstruct drainage systems , install erosion control measures and clear debris basins and repair slopes | In SB & SLO Counties at various locations | 05/11/2016 | 1 (10/20/2016) | Details CEM-3701 Report |
| 210838 | Project ID: 210838 DEA: 050T4604 EFIS: 0500000852 MINOR: 05A1770 | 05-SLO-46-R13.7 | DOT 800 MHz Radio System | IN SAN LUIS OBISPO COUNTY NEAR ATASCADERO AT VARIOIUS LOCATIONS. | 03/23/2020 | 1 (09/01/2015) | Details CEM-3701 Report |
| 210837 | Project ID: 210837 DEA: 080J0804 EFIS: 0800000283 COOP: 081625 | 08-RIV-15-34.7/51.6 | (Alternative Delivery) DESIGN-BUILD OF THE INTERSTATE 15 EXPRESS LANES PROJECT | Riverside County and SBD-15-0.0/1.3 | 08/01/2024 | 1 (05/08/2017) | Details CEM-3701 Report |
| 210847 | Project ID: 210847 EFIS: 0000001155 Permit Numbers: 04086MC0401 04116RT1042 04156DP1672 | 04-SF-280-6.52/6.52 | Construct offramp widening improvements including traffic signal modificationsConstruct new traffic signal system a 280/Mariposa St. onramp. | n/a, n/a | 08/31/2018 | 1 (10/29/2015) | Details CEM-3701 Report |
| 210858 | Project ID: 210858 DEA: 010F6704 | 01-LAK-29,29-0.0/17.0,16.0/28.0, VAR | Roadway Repair, Drainage /Slope Repair, MBGR and Sign Replacement, Tree and Debris Removal | In Middletown on Rte 29 form Napa/Lake County line to Murphy Springs Road and Rte 175 from Loch Lomond Road to Rte 29 | 12/21/2020 | 1 (11/02/2015) | Details CEM-3701 Report |
| 210859 | Project ID: 210859 DEA: 010B3104 EFIS: 0112000115 | 01-DN-199-8.7,21.7 | CONSTRUCT BUTTRESSES | IN DEL NORTE COUNTY NEAR GASQUET AT1.6 MILES NORTH OF MYRTLE CREEK BRIDGE AND ABOUT 8 MILES NORTH OF GASQUET AT 0.4 MILE SOUTH OF PATRICK CREEK BRIDGE | 02/16/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
| 210860 | Project ID: 210860 DEA: 010B3204 EFIS: 0112000116 | 01-DN-199-24.7 | CONSTRUCT SOLDIER PILE WALL | 10/30/2017 | 1 (09/23/2015) | Details CEM-3701 Report | |
| 210861 | Project ID: 210861 DEA: 020H2104 EFIS: 0214000145 | 02-SHA,SIS,TEH-3,5,44,89,273,299-VAR | INSTALL OVERHEAD SIGN PANELS AND ROADSIDE SIGNS. | IN SHASTA, SISKIYOU AND TEHAMA COUNTIES AT VARIOUS LOCATIONS. | 08/28/2017 | 1 (09/23/2015) | Details CEM-3701 Report |
| 210862 | Project ID: 210862 DEA: 031F4004 EFIS: 0300020420 | 03-PLA-80-35.1/38.3 | WIDEN EASTBOUND ROADWAY | WIDEN EASTBOUND ROADWAY | 06/19/2020 | 1 (10/20/2015) | Details CEM-3701 Report |
| 210863 | Project ID: 210863 DEA: 032F6304 EFIS: 0313000316 | 03-SAC-5-32.2/32.7 | CREATE A LONGER DECELERATION LANE | IN SACRAMENTO COUNTY NEARSACRAMENTO FROM EAST OF POWERLINE ROAD TO WEST OF AIRPORT BOULEVARD. | 10/28/2016 | 1 (10/20/2015) | Details CEM-3701 Report |
