Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7941-7950 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 210841 | Project ID: 210841 Permit Numbers: 0614NSN0388 0615NRT0134 | 06-FRE-99-20.164/20.164 | Enter upon the State Highway Right-of-way on northbound State Route 99 (FRE/99) in Fresno County at post mile 20.164 (Ventura Street) to set up, maintain, and remove temporary traffic control necessary to install the traffic signals, signs, loops and restriping. Work included, but not limited: ins | Intersection of N/B SR99 offramp & Ventura Ave, Fresno | 04/27/2018 | 1 (10/01/2015) | Details CEM-3701 Report |
| 210820 | Project ID: 210820 DEA: 044G6404 EFIS: 0412000622 | 04-SM-84-21.6 | SOLDIER PILE-SECANT WALL, SURFACING ROADWAY | IN SAN MATEO COUNTY IN WOODSIDE, ATROUTE 84/280 SEPARATION. | 12/27/2017 | 1 (10/16/2015) | Details CEM-3701 Report |
| 210821 | Project ID: 210821 DEA: 050T9804 EFIS: 0500020244 | 05-SCR-17-8.3/9.4 | WIDEN SHOULDERS, CONCRETE MEDIAN BARRIER, SOIL NAIL WALL AND VIADUCTS. | IN SANTA CRUZ COUNTY NEAR SCOTTSVALLEY FROM 0.4 MILE SOUTH OFSUGARLOAF ROAD TO 0.1 MILE SOUTH OFLAUREL ROAD | 04/03/2018 | 1 (12/08/2015) | Details CEM-3701 Report |
| 210822 | Project ID: 210822 DEA: 051C0904 EFIS: 0512000073 | 05-MON-68,101-Var | CONTRAST SURFACE TREATMENTS AND SLOPE PAVING. | IN MONTEREY COUNTY AT VARIOUSLOCATIONS | 01/04/2018 | 1 (01/25/2016) | Details CEM-3701 Report |
| 210823 | Project ID: 210823 DEA: 051C2404 EFIS: 0512000106 | 05-SLO-1-17.7/59.0 | REPAIR SHOULDERS AND INSTALL RUMBLE STRIP. | IN SAN LUIS OBISPO COUNTY IN ANDNEAR SAN LUIS OBISPO AND SAN SIMEONFROM HIGHLAND DRIVE TO 1.2 MILESNORTH OF HEARST CASTLE ROAD. | 01/04/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 210824 | Project ID: 210824 DEA: 051G1904 EFIS: 0514000123 | 05-MON,SBT,SLO,SB,SCR-1,9,17,41,46,etc-various | REMOVE AND REPLACE SIGN PANELS. | IN SANTA BARBARA, MONTEREY, SAN BENITO, SAN LUIS OBISPO, AND SANTA CRUZ COUNTIES AT VARIOUS LOCATIONS | 02/01/2018 | 1 (12/08/2015) | Details CEM-3701 Report |
| 210825 | Project ID: 210825 DEA: 051G2804 EFIS: 0514000134 | 05-MON,SLO,SB,SCR--VAR | MODIFY SIGNALS, INSTALL COUNTDOWN AND ACCESSIBLE PEDESTRIAN SIGNALS. | IN MONTEREY, SAN LUIS OBISPO, SANTAIN MONTEREY, SAN LUIS OBISPO, SANTABARBARA AND SANTA CRUZ COUNTIES AT VARIOUS LOCATIONS | 03/23/2020 | 1 (11/25/2015) | Details CEM-3701 Report |
| 210826 | Project ID: 210826 DEA: 060R0604 EFIS: 0614000003 | 06-KER-5713- | CONSTRUCT CREW ROOM, SITE WORK. | CONSTRUCT CREW ROOM, SITE WORK. | 05/16/2024 | 1 (04/11/2019) | Details CEM-3701 Report |
| 210827 | Project ID: 210827 DEA: 07288024 EFIS: 0713000361 | 07-LA-210-R10.5/R15.7 | CONSTRUCT STORM WATER TREATMENT BMP. | IN LOS ANGELES AND GLENDALE FROM0.2 MILE WEST OF BIG TUJUNGA WASH BRIDGE TO DUNSMORE AVENUEUNDERCROSSING | 06/13/2017 | 1 (02/08/2016) | Details CEM-3701 Report |
| 210828 | Project ID: 210828 DEA: 07290704 EFIS: 0712000076 | 07-LA-47-0.9/2.0 | RESTORE BRIDGE SEISMIC. | 06/25/2019 | 1 (06/03/2016) | Details CEM-3701 Report |
