Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7891-7900 of 18867 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
212073Project ID: 212073
DEA: 032H7204
03-NEV-80-R9.2/R9.6remove mudslide 08/06/20191 (09/15/2017)Details CEM-3701 Report
212072Project ID: 212072
DEA: 032H8304
EFIS: 0317000188
03-SIE-49-0.0/23.3remove mudslides, repair roadway & shoulder 08/06/20191 (09/15/2017)Details CEM-3701 Report
212071Project ID: 212071
DEA: 051J0704
05-SCR,SCR-17,129-5.87/12.55, 5.52/8.2, 8.20remove slide material, stablize slope 08/22/2018NOT VERIFIEDDetails CEM-3701 Report
212070Project ID: 212070
DEA: 051J0804
05-SCR,SCR-17-5.87/12.55remove slide material, stablize slope 09/23/20191 (09/23/2019)Details CEM-3701 Report
212069Project ID: 212069
DEA: 060W1004
EFIS: 0617000159
06-FRE-5-5.5/8.8remove/replace failed pavement slabs 08/02/20231 (09/25/2018)Details CEM-3701 Report
212068Project ID: 212068
DEA: 081G3904
08-RIV-10-R20.1/R99.1BRIDGE MAINTENANCE WITH METHACRYLATE AND POLYESTER OVERLAYRIVERSIDE COUNTY ON ROUTE 10 FROM MILLARD CANYON BRIDGE TO TARO DITCH BRIDGE08/16/20231 (01/15/2019)Details CEM-3701 Report
212067Project ID: 212067
DEA: 081G2404
EFIS: 0815000179
08-RIV-15-41.8/51.5BRIDGE DECK REHAB, JOINT SEAL REPLACEMENT, AND SHEAR KEY REPAIRRIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM PARKRIDGE AVENUE UNDERCROSSING TO ROUTE 15/60 SEPARATION08/16/20231 (08/07/2017)Details CEM-3701 Report
212066Project ID: 212066
DEA: 081C1904
08-SBD-60-R2.9/R3.9ROADSIDE SAFETY IMPROVEMENTSSAN BERNARDINO COUNTY IN CHINO FROM BENSON AVENUE OVERCROSSING TO 0.2 MILE WEST OF SAN ANTONIO AVENUE UNDERCROSSING08/16/20231 (10/04/2021)Details CEM-3701 Report
212065Project ID: 212065
DEA: 060V5304
06-KER-58,99-28.2/31.4,R43.9/48.7OVERLAY WITH GAP GRADED RUBBERIZED HOT MIX ASPHALTKERN COUNTY IN BUTTONWILLOW ON ROUTE 58 FROM LESLIE LANE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION AND NEAR MCFARLAND ON ROUTE 99 FROM LERDO CANAL BRIDGE TO 1.3 MILES NORTH OF WHISLER ROAD OVERCROSSING04/24/2018NOT VERIFIEDDetails CEM-3701 Report
212064Project ID: 212064
DEA: 051H2804
05-SLO-46-R0.2/R21.7INSTALL RUMBLE STRIP AND PLACE TRAFFIC STRIPING.SAN LUIS OBISPO COUNTY NEAR PASO ROBLES FROM PERRY CREEK BRIDGE TO THEATRE DRIVE08/22/2018NOT VERIFIEDDetails CEM-3701 Report