Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7891-7900 of 18867 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212073 | Project ID: 212073 DEA: 032H7204 | 03-NEV-80-R9.2/R9.6 | remove mudslide | 08/06/2019 | 1 (09/15/2017) | Details CEM-3701 Report | |
| 212072 | Project ID: 212072 DEA: 032H8304 EFIS: 0317000188 | 03-SIE-49-0.0/23.3 | remove mudslides, repair roadway & shoulder | 08/06/2019 | 1 (09/15/2017) | Details CEM-3701 Report | |
| 212071 | Project ID: 212071 DEA: 051J0704 | 05-SCR,SCR-17,129-5.87/12.55, 5.52/8.2, 8.20 | remove slide material, stablize slope | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report | |
| 212070 | Project ID: 212070 DEA: 051J0804 | 05-SCR,SCR-17-5.87/12.55 | remove slide material, stablize slope | 09/23/2019 | 1 (09/23/2019) | Details CEM-3701 Report | |
| 212069 | Project ID: 212069 DEA: 060W1004 EFIS: 0617000159 | 06-FRE-5-5.5/8.8 | remove/replace failed pavement slabs | 08/02/2023 | 1 (09/25/2018) | Details CEM-3701 Report | |
| 212068 | Project ID: 212068 DEA: 081G3904 | 08-RIV-10-R20.1/R99.1 | BRIDGE MAINTENANCE WITH METHACRYLATE AND POLYESTER OVERLAY | RIVERSIDE COUNTY ON ROUTE 10 FROM MILLARD CANYON BRIDGE TO TARO DITCH BRIDGE | 08/16/2023 | 1 (01/15/2019) | Details CEM-3701 Report |
| 212067 | Project ID: 212067 DEA: 081G2404 EFIS: 0815000179 | 08-RIV-15-41.8/51.5 | BRIDGE DECK REHAB, JOINT SEAL REPLACEMENT, AND SHEAR KEY REPAIR | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM PARKRIDGE AVENUE UNDERCROSSING TO ROUTE 15/60 SEPARATION | 08/16/2023 | 1 (08/07/2017) | Details CEM-3701 Report |
| 212066 | Project ID: 212066 DEA: 081C1904 | 08-SBD-60-R2.9/R3.9 | ROADSIDE SAFETY IMPROVEMENTS | SAN BERNARDINO COUNTY IN CHINO FROM BENSON AVENUE OVERCROSSING TO 0.2 MILE WEST OF SAN ANTONIO AVENUE UNDERCROSSING | 08/16/2023 | 1 (10/04/2021) | Details CEM-3701 Report |
| 212065 | Project ID: 212065 DEA: 060V5304 | 06-KER-58,99-28.2/31.4,R43.9/48.7 | OVERLAY WITH GAP GRADED RUBBERIZED HOT MIX ASPHALT | KERN COUNTY IN BUTTONWILLOW ON ROUTE 58 FROM LESLIE LANE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION AND NEAR MCFARLAND ON ROUTE 99 FROM LERDO CANAL BRIDGE TO 1.3 MILES NORTH OF WHISLER ROAD OVERCROSSING | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212064 | Project ID: 212064 DEA: 051H2804 | 05-SLO-46-R0.2/R21.7 | INSTALL RUMBLE STRIP AND PLACE TRAFFIC STRIPING. | SAN LUIS OBISPO COUNTY NEAR PASO ROBLES FROM PERRY CREEK BRIDGE TO THEATRE DRIVE | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
