Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7871-7880 of 18782 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
208631Project ID: 208631
DEA: 050R3304
EFIS: 0500020277
05-SLO-166-39.9/40.3Remove Bridge/Realign ( New Bridge)25 miles west of New Cuy Ama12/23/20241 (11/11/2019)Details CEM-3701 Report
208632Project ID: 208632
DEA: 050T9204
EFIS: 0500020194
COOP: 05CA0254
Permit Numbers: 0512NSN0241
05-SB-246-8.78/9.15Install traffic signal, safety lighting, signal interconnect, and reconstruct four curb ramps at the intersection of State Route 246 and R Street as shown on the attached plans, as directed by cooperative agreement 05-CA-0254 and as directed by the permiSR 246, Lompoc09/17/20182 (03/14/2013)Details CEM-3701 Report
208633Project ID: 208633
Permit Numbers: 0811NRW1041 0811NMC0027 0811NUM0028 08126DP0175 0811NRW1042 0812NRT1145 0812NRT1144 08126RT1146
08-RIV-79-13.8/13.8Enter onto State Route 79 right-of-way at Craig Road to extend the existing 16\" diameter steel casing and the 10\" diameter water pipeline beyond the State\'s Right-of-Way using open trench method as per plans date stamped February 15, 2011 by the DepartState Route 79, County06/11/20131 (02/26/2013)Details CEM-3701 Report
208634Project ID: 208634
DEA: 060P4004
EFIS: 0612000153
MINOR: 06A1820
06-KER-184-L0.0Construct Jointed Plani Concrete Pavement ( Rapid Strength Concrete)In Kern County Near Weed patch at Rte 22310/19/20201 (02/26/2013)Details CEM-3701 Report
208635Project ID: 208635
DEA: 022E6204
EFIS: 0200000588
02-TEH-5,36-30.2,39.7/40.3RECONSTRUCT AND WIDEN ROADWAY WITH HMA, REPLACE DRAINAGE AND FENCING.TEHAMA COUNTY ON ROUTE 5 AT HESS ROAD MAINTENANCE STATION AND ON ROUTE 36 FROM BAKER ROAD TO 0.6 MILE EAST OF BAKER ROAD01/30/20151 (04/05/2013)Details CEM-3701 Report
208636Project ID: 208636
DEA: 022E7304
EFIS: 0200000599
02-TEH-32-22.3/22.8CURVE IMPROVEMENT AND SHOULDER WIDENINGTEHAMA COUNTY ABOUT 35 MILES EAST OF FOREST RANCH FROM 0.6 MILE WEST TO 0.1 MILE WEST OF DEER CREEK BRIDGE 08-007205/29/20141 (04/05/2013)Details CEM-3701 Report
208637Project ID: 208637
DEA: 024E3404
EFIS: 0200020273
02-LAS-147-0.5/1.2ROADWAY REHABILITATIONLASSEN COUNTY NEAR WESTWOOD FROM 0.3 MILE NORTH TO 0.5 MILE SOUTH OF SPRING CREEK DRIVE01/30/20151 (04/05/2013)Details CEM-3701 Report
208638Project ID: 208638
DEA: 060P6304
EFIS: 0612000190
06-KER-155-R14.0/41.0INSTALL CURED-IN-PLACE PIPE LINERS AND REPLACE CULVERTS.KERN COUNTY NEAR GLENNVILLE AT VARIOUS LOCATIONS FROM 3.1 MILES EAST OF ROUTE 65 TO 0.6 MILE EAST OF PASCOE ROAD10/08/20141 (04/30/2013)Details CEM-3701 Report
208639Project ID: 208639
DEA: 060Q0704
06-KER-33-19.6/27.0COLD IN-PLACE RECYCLING AND OVERLAY WITH HMA (TYPE A).KERN COUNTY IN AND NEAR TAFT FROM 0.5 MILE NORTH OF 10TH STREET TO 0.2 MILE SOUTH OF SHALE ROAD10/08/20141 (10/08/2014)Details CEM-3701 Report
208640Project ID: 208640
DEA: 060Q3504
EFIS: 0613000055
06-FRE,KER,TUL-99,180,198-VarINSTALL SMART AND COMPRESSOR ATTENUATOR CRASH CUSHIONS.FRESNO, KERN AND TULARE COUNTIES AT VARIOUS LOCATIONS10/08/2014NOT VERIFIEDDetails CEM-3701 Report