Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7851-7860 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7284 | Project ID: 7284 DEA: 034M3004 | 03-PLA,NEV-80-68.5/69.8,0.0/R2.5 | GRIND PORTLAND CEMENT CONCRETE PAVEMENT. COLD PLANE AC PAVEMENT. | PLACER AND NEVADA COUNTIES FROM TROY ROAD UNDERCROSSING TO SODA SPRINGS OVERCROSSING | 01/04/2013 | 1 (05/14/2012) | Details CEM-3701 Report |
| 7285 | Project ID: 7285 DEA: 040120T4 EFIS: 0400000027 | 04-SF-80-12.6/13.9 | CONSTRUCT BRIDGE, ROADWAYS, ELECTRICAL, BUILDINGS AND REMOVE BRIDGES | THE CITY AND COUNTY OF SAN FRANCISCO FROM THE YERBA BUENA TUNNEL TO 1.3 KM EAST OF THE YERBA BUENA TUNNEL | 02/12/2025 | 1 (10/29/2012) | Details CEM-3701 Report |
| 7286 | Project ID: 7286 DEA: 042E6504 | 04-NAP-121-9.4/22.0 | COLD PLANE AND OVERLAY WITH RUBBERIZED HOT MIX (GAP GRADED). | NAPA COUNTY IN NAPA FROM TRANCAS STREET TO ROUTE 128 | 12/20/2012 | 1 (05/07/2012) | Details CEM-3701 Report |
| 7287 | Project ID: 7287 DEA: 050K2304 EFIS: 0500000108 | 05-SCR-9-8.4/8.6 | CONSTRUCT CONCRETE VIADUCT SUPPORTED ON CONCRETE PILINGS AND PAVE HMA | SANTA CRUZ COUNTY NEAR BEN LOMAND FROM 0.2 MILE NORTH OF GLEN ARBOR ROAD TO HIGHLAND COUNTY PARK | 08/13/2018 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7288 | Project ID: 7288 DEA: 080J1404 EFIS: 0800000289 | 08-RIV-74-29.6/29.9 | WIDENING, SIGNAL, CURBRAMP, SIDEWALK, CURB, GUTTER AND BUS STOP | RIVERSIDE COUNTY NEAR PERRIS AT STATE ROUTE 74 / MENIFEE ROAD INTERSECTION | 04/04/2014 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7289 | Project ID: 7289 DEA: 080L9304 EFIS: 0800000446 | 08-RIV-10-R15.8 | CONSTRUCT NEW ADMINISTRATION BLDG, SEPTIC TANK AND LEACH FIELD | RIVERSIDE COUNTY IN BANNING AT THE DESERT HILLS TRUCK INSPECTION FACILITY | 07/24/2014 | 1 (10/15/2012) | Details CEM-3701 Report |
| 7290 | Project ID: 7290 DEA: 080Q2104 EFIS: 0800020297 | 08-RIV-15-9.5/30.4 | REHAB BR DECKS WITH METHACRYLATE,CONST APPROACH SLABS, SLOPE PAVING | RIVERSIDE COUNTY IN AND NEAR MURRIETA ON ROUTE 15 AT VARIOUS LOCATIONS FROM 0.3 MILE NORTH OF ROUTE 15/215 SEPARATION TO 10.5 MILES SOUTH OF ROUTE 15/91 SEPARATION | 11/07/2012 | 1 (08/22/2012) | Details CEM-3701 Report |
| 7291 | Project ID: 7291 DEA: 08334884 EFIS: 0800000605 | 08-RIV-215-38.6/39.7 | PLANTING AND IRRIGATION | RIVERSIDE COUNTY IN RIVERSIDE FROM 0.3 MILE WEST OF CENTRAL AVENUE UNDERCROSSING TO 0.3 MILE EAST OF FAIR ISLE DRIVE UNDERCROSSING | 06/13/2016 | 1 (05/07/2012) | Details CEM-3701 Report |
| 7292 | Project ID: 7292 DEA: 08438904 | 08-SBD-178-5.0/14.3 | REPLACE AND IMPROVE DRAINAGE FACILITIES | SAN BERNARDINO COUNTY EAST OF RIDGECREST FROM 5.0 MILES EAST TO 14.3 MILES EAST OF KERN COUNTY LINE | 02/06/2013 | 1 (05/07/2012) | Details CEM-3701 Report |
| 7293 | Project ID: 7293 DEA: 112M2104 EFIS: 1100020406 | 11-IMP-78-62.9/80.7 | APPLY ASPHALT-RUBBER SEAL COAT. | IMPERIAL COUNTY AT AND NEAR PALO VERDE FROM 0.4 MILE NORTH OF MIDWAY WELL ROAD TO RIVERSIDE COUNTY LINE | 09/24/2012 | 1 (10/02/2012) | Details CEM-3701 Report |
