Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7841-7850 of 18782 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7272Project ID: 7272
EFIS: 0000001155
Permit Numbers: 08126RW0102
08-RIV-111-52.88/53.38Enter onto Vista Chino Parkway (SR-111) right of way at Cerritos Road in the City of Palm Springs to install new traffic signal and related signing and striping as per plans date stamped May 11,2011, Special Provisions and Water Pollution Control ProgramVista Chino, Palm Springs02/23/20121 (02/23/2012)Details CEM-3701 Report
7273Project ID: 7273
EFIS: 0000001155
Permit Numbers: 08126RT0181
08-RIV-79-18.47/18.472Enter onto State Route 79 right-of-way at Stetson Avenue, in Winchester area, Riverside County, to perform roadway improvements including pavement widening, AC overlay, sidewalk, curb gutter, street lights, pedestrian access ramps, traffic signal.State Route 79 (Winchester Road), Winchester01/07/20071 (01/07/2007)Details CEM-3701 Report
7276Project ID: 7276
DEA: 08468104
EFIS: 0800000745
08-SBD-10-14.8/15.5Route 10 Citrus Avenue Interchange Reconstruction, Replace existing interchange at Citrus Avenue.In Fontana, on Route 10 at Citrus Avenue interchange08/19/20211 (09/10/2012)Details CEM-3701 Report
7277Project ID: 7277
DEA: 010A3904
EFIS: 0100020279
01-DN,HUM-101,199-VARREHABILITATE BRIDGEDEL NORTE AND HUMBOLDT COUNTIES AT VARIOUS LOCATIONS03/12/20131 (07/11/2012)Details CEM-3701 Report
7278Project ID: 7278
DEA: 010A7304
EFIS: 0100020334
01-MEN-20-7.0/17.3HMA OVERLAYMENDOCINO COUNTY NEAR FORT BRAGG FROM 10.3 MILES WEST OF CHAMBERLAIN CREEK BRIDGE TO CHAMBERLAIN CREEK BRIDGE07/03/20131 (05/07/2012)Details CEM-3701 Report
7279Project ID: 7279
DEA: 023C3004
EFIS: 0200000317
02-PLU-70-0.6/35.2CONSTRUCT METAL BEAM GUARDRAIL, CONCRETE BARRIER AND RETAINING WALLS.PLUMAS COUNTY AT VARIOUS LOCATIONS FROM GRIZZLY CREEK BRIDGE TO 0.1 MILE WEST OF SPANISH CREEK BRIDGE12/05/20141 (08/01/2012)Details CEM-3701 Report
7280Project ID: 7280
DEA: 025E2104
EFIS: 0212000094
02-PLU-36-6.5/9.2COLD IN-PLACE RECYCLE WITH HMA OVERLAYPLUMAS COUNTY AT CHESTER FROM 0.2 MILE EAST OF ROUTE 89 TO MELISSA AVENUE07/22/20131 (10/11/2012)Details CEM-3701 Report
7281Project ID: 7281
DEA: 031E0004
EFIS: 0300020255
03-PLA-89-13.7/21.7AC PAVEMENT COLD FOAM IN-PLACE RECYCLING AND HMA OVERLAY.PLACER COUNTY NEAR TRUCKEE FROM SQUAW VALLEY ROAD TO THE NEVADA COUNTY LINE01/23/20131 (06/19/2012)Details CEM-3701 Report
7282Project ID: 7282
DEA: 033E6304
EFIS: 0300000510
03-ED-49-9.6/10.1PLACE HMA, REPLACE ASPHALT CONCRETE AND REPLACE CULVERTSEL DORADO COUNTY IN EL DORADO FROM MISSOURI STREET NORTH TO 4.8 MILES SOUTH OF JUNCTION ROUTE 49/50 SEPARATION10/01/20141 (06/26/2012)Details CEM-3701 Report
7283Project ID: 7283
DEA: 033E9104
EFIS: 0300020571
03-BUT-32-R9.5Signal Modification and Install ADA RampsBUTTE COUNTY IN CHICO AT MAIN STREET AND OROVILLE AVENUE04/29/20131 (10/12/2012)Details CEM-3701 Report