Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7821-7830 of 18782 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
208568Project ID: 208568
DEA: 03372804
EFIS: 0300000428
Permit Numbers: 0312NMC0382
03-ED-50-15.6/17Construct Phase 1A - Interchange ImprovementRay Lawyer Dr WB on Ramp to US 50 and Fair Lane Road12/08/20172 (03/01/2013)Details CEM-3701 Report
208570Project ID: 208570
Permit Numbers: 0812NRW0863 0813NDP0060 0812NMC0462
08-RIV-215-16/28.5Enter onto Interstate 215 right-of-way between Scott Road and Neuvo Road, in the Cities of Menifee and Perris, to widen the freeway to six lanes for project EA 0F162 (Prom ID: 0800000116) including but not limited to new roadway pavement, planting & iInterstate 215, Perris Menifee07/31/2018NOT VERIFIEDDetails CEM-3701 Report
208571Project ID: 208571
DEA: 024E9904
EFIS: 0212000116
02-PLU,PLU-36,70-26.0/R26.6,90.5/96.0HMA THIN BLANKET WITH DIGOUTSLASSEN AND PLUMAS COUNTIES ON ROUTE 36 FROM RUSSEL AVENUE TO 0.1 MILE WEST OF SUSAN RIVER BRIDGE AND ON ROUTE 70 FROM 0.7 MILE WEST OF SUMMIT SCHOOL DRIVE TO LASSEN COUNTY LINE01/02/20151 (02/27/2013)Details CEM-3701 Report
208572Project ID: 208572
DEA: 100L3304
EFIS: 1000000100
COOP: 10355
Permit Numbers: 1012NMC0508
10-STA-99-0.0/0.3Reconsteuct SR99/Kiernan InterchangeCity of Salida, in STA County03/09/20201 (03/25/2013)Details CEM-3701 Report
208573Project ID: 208573
Permit Numbers: 0412NRW2131 0411NSN1865 04136DP0031
04-CC-80-1.67/1.67This proposal involves the modification of the traffic signal at the intersection of Potrero Ave/i-80 EB off -ramp/East shore Blvd.i-80 Ramps at Potrero Ave., El Cerrito09/14/20181 (02/13/2013)Details CEM-3701 Report
208574Project ID: 208574
DEA: 03371204
EFIS: 0300000425
COOP: 030419
03-SAC-50-R5.0/R5.9Watt Ave @ Route 50 Interchange Improvements. In the city of Sacramento, on Route 50At Watt Avenue from La Riviera Drive to Kiefer Boulevard. Modify the interchange, widen Watt Avenue, and add bike/pedestrian and public transit facilities.03/09/20201 (02/07/2013)Details CEM-3701 Report
208575Project ID: 208575
DEA: 11056324
EFIS: 1100020519
11-SD-11,77,112,185,880-0.0/1.3CONSTRUCT FREEWAY TO FREEWAY CONNECTORSIN SAN DIEGO COUNTY NEAR SAN DIEGO ON ROUTE 905 FROM 0.1 MILE WEST OF BRITANNIA BOULEVARD OVERCROSSING TO 1.6 MILES EAST OF LA09/12/20231 (02/05/2013)Details CEM-3701 Report
208584Project ID: 208584
DEA: 04041004
EFIS: 0400000044
04-SM,ALA-92-R14.4/R18.8,R0.0/R2.6Polyester Concrete Overlay.San Mateo Bridge 04-SM,Ala-92-R14.4/R18.8,R0.0/R2.612/22/20161 (02/06/2013)Details CEM-3701 Report
208588Project ID: 208588
DEA: 041F7104
EFIS: 0412000311
MINOR: 04A4141
04-SM-82-13.7INSTALL DRAINAGE SYSTEM, DRAINAGE INLETS AND PORTLAND CEMENT CONCRETE SIDEWALK AND CURB & GUTTERIn Burlingame at Oak Grove Ave02/12/20251 (03/01/2013)Details CEM-3701 Report
208589Project ID: 208589
DEA: 033F4104
EFIS: 0312000283
03-PLA-49,80,193-0.0/0.9REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIER RAIL.NEAR AUBURN AND COLFAX, ON ROUTES 49, 80, AND 193 AT VARIOUS LOCATIONS.12/04/20141 (02/11/2013)Details CEM-3701 Report