Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7811-7820 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212068 | Project ID: 212068 DEA: 081G3904 | 08-RIV-10-R20.1/R99.1 | BRIDGE MAINTENANCE WITH METHACRYLATE AND POLYESTER OVERLAY | RIVERSIDE COUNTY ON ROUTE 10 FROM MILLARD CANYON BRIDGE TO TARO DITCH BRIDGE | 08/16/2023 | 1 (01/15/2019) | Details CEM-3701 Report |
| 212067 | Project ID: 212067 DEA: 081G2404 EFIS: 0815000179 | 08-RIV-15-41.8/51.5 | BRIDGE DECK REHAB, JOINT SEAL REPLACEMENT, AND SHEAR KEY REPAIR | RIVERSIDE COUNTY AT VARIOUS LOCATIONS FROM PARKRIDGE AVENUE UNDERCROSSING TO ROUTE 15/60 SEPARATION | 08/16/2023 | 1 (08/07/2017) | Details CEM-3701 Report |
| 212066 | Project ID: 212066 DEA: 081C1904 | 08-SBD-60-R2.9/R3.9 | ROADSIDE SAFETY IMPROVEMENTS | SAN BERNARDINO COUNTY IN CHINO FROM BENSON AVENUE OVERCROSSING TO 0.2 MILE WEST OF SAN ANTONIO AVENUE UNDERCROSSING | 08/16/2023 | 1 (10/04/2021) | Details CEM-3701 Report |
| 212065 | Project ID: 212065 DEA: 060V5304 | 06-KER-58,99-28.2/31.4,R43.9/48.7 | OVERLAY WITH GAP GRADED RUBBERIZED HOT MIX ASPHALT | KERN COUNTY IN BUTTONWILLOW ON ROUTE 58 FROM LESLIE LANE TO 0.2 MILE WEST OF ROUTE 5/58 SEPARATION AND NEAR MCFARLAND ON ROUTE 99 FROM LERDO CANAL BRIDGE TO 1.3 MILES NORTH OF WHISLER ROAD OVERCROSSING | 04/24/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212064 | Project ID: 212064 DEA: 051H2804 | 05-SLO-46-R0.2/R21.7 | INSTALL RUMBLE STRIP AND PLACE TRAFFIC STRIPING. | SAN LUIS OBISPO COUNTY NEAR PASO ROBLES FROM PERRY CREEK BRIDGE TO THEATRE DRIVE | 08/22/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212063 | Project ID: 212063 DEA: 044G9504 EFIS: 0413000235 | 04-SCL,SF,SM-84,85,92,101,237,etc-VAR | PUMP HOUSE SAFETY AND ACCESS IMPROVEMENTS AND IRRIGATION REMOVAL | THE CITY AND COUNTY OF SAN FRANCISCO, SAN MATEO, AND SANTA CLARA COUNTIES AT VARIOUS LOCATIONS. | 12/21/2017 | 1 (03/02/2017) | Details CEM-3701 Report |
| 212062 | Project ID: 212062 DEA: 040K9504 EFIS: 0416000173 | 04-SCL-17-2.8/7.5 | HM1 - REPLACE ASPHALT CONCRETE SURFACING. | SANTA CLARA COUNTY IN SANTA CLARA AND LOS GATOS FROM 0.1 MILE NORTH OF HEBARD WAY TO 0.16 MILE SOUTH OF BLOSSOM HILL ROAD | 08/22/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 212061 | Project ID: 212061 DEA: 034F0504 EFIS: 0314000018 | 03-BUT-70-22.1/28.2 | COLD PLANE AC PAVEMENT AND RHMA OVERLAY | BUTTE COUNTY ABOUT 6 MILES NORTH OF OROVILLE FROM 0.2 MILE EAST OF ROUTE 191 TO WEST BRANCH FEATHER RIVER BRIDGE | 06/29/2018 | 1 (04/19/2017) | Details CEM-3701 Report |
| 212060 | Project ID: 212060 DEA: 010F5204 EFIS: 0116000016 | 01-HUM-101-R8.5/R22.4 | RUBBERIZED HMA OVERLAY | HUMBOLDT COUNTY AT VARIOUS LOCATIONS FROM 0.1 MILE SOUTH OF BENBOW OVERCROSSING TO FRENCH ROAD UNDERCROSSING | 11/27/2018 | 1 (10/03/2017) | Details CEM-3701 Report |
| 212059 | Project ID: 212059 DEA: 010F1904 EFIS: 0115000078 | 01-DN-199-7.5/27.5 | COLD PLANE, PLACE HMA AND HIGH FRICTION SURFACE TREATMENT | DEL NORTE COUNTY AT VARIOUS LOCATIONS FROM 0.4 MILE NORTH OF SOUTH FORK ROAD TO 0.6 MILE SOUTH OF IDLEWILD MAINTENANCE STATION ROAD | 08/27/2018 | 1 (06/07/2017) | Details CEM-3701 Report |
