Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7781-7790 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7205 | Project ID: 7205 DEA: 060M4404 EFIS: 0600020023 | 06-KER-33-34.3/40.3 | COLD IN-PLACE RECYCLING AND HMA OVERLAY | KERN COUNTY NEAR MCKITTRICK FROM ROUTE 58 TO 0.7 MILE NORTH OF CYMRIC ROAD NORTH | 08/28/2012 | 1 (08/13/2012) | Details CEM-3701 Report |
| 7206 | Project ID: 7206 DEA: 060N2104 EFIS: 0600020450 | 06-FRE-168-52.0/60.0 | COLD PLANE AND OVERLAY WITH HMA (TYPE A, PG-TR) | FRESNO COUNTY NEAR SHAVER LAKE FROM 2.3 MILES EAST OF HUNTINGTON LAKE ROAD TO 1.0 MILE EAST OF FLINTRIDGE ROAD | 10/23/2012 | 1 (08/27/2012) | Details CEM-3701 Report |
| 7207 | Project ID: 7207 DEA: 060N6604 EFIS: 0600020632 | 06-TUL-198-23.5/43.0 | REPAIR CULVERTS , INSTALL LINER AND PAVE INVERTS. | TULARE COUNTY IN AND NEAR LEMON COVE AT VARIOUS LOCATIONS FROM 0.3 MILE WEST OF MEHRTEN AVENUE TO 0.5 MILE EAST OF MINERAL KING ROAD | 09/27/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
| 7208 | Project ID: 7208 DEA: 080P8504 EFIS: 0800020037 | 08-SBD,RIV-60,215-Var | REHABILITATE PAVEMENT | SAN BERNARDINO AND RIVERSIDE COUNTIES ON ROUTE 60 FROM LOS ANGELES COUNTY LINE TO ROUTE 60/91/215 SEPARATION AND ON ROUTE 215 FROM MARTIN LUTHER KING BOULEVARD UNDERCROSSING TO ROUTE 60/91/215 SEPARATION | 10/30/2012 | 1 (06/27/2012) | Details CEM-3701 Report |
| 7209 | Project ID: 7209 DEA: 100U6204 | 10-MER-5-16.7 | BRIDGE COLUMN TO BE REPAIRED. | MERCED COUNTY NEAR SANTA NELLA AT BILLY WRIGHT ROAD UNDERCROSSING | 01/04/2013 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7210 | Project ID: 7210 DEA: 100V9804 | 10-MPA-49-R34.6/48.8 | REPAIR FAILED AREAS AND APPLY RUBBERIZED HMA (GAP GRADED). | MARIPOSA COUNTY AT AND NEAR COULTERVILLE FROM MERCED RIVER BRIDGE TO TUOLUMNE COUNTY LINE | 01/04/2013 | 1 (04/16/2012) | Details CEM-3701 Report |
| 7211 | Project ID: 7211 DEA: 112M3904 EFIS: 1100020411 | 11-SD-76-L0.0/M2.9 | COLD PLANE AND OVERLAY WITH RHMA, SIGNAL AND LIGHTING WORK. | SAN DIEGO COUNTY IN OCEANSIDE FROM 0.1 WEST OF ROUTE 5/76 SEPARATION TO MISSION AVENUE UNDERCROSSING | 10/04/2012 | 1 (10/30/2012) | Details CEM-3701 Report |
| 7214 | Project ID: 7214 DEA: 08464624 EFIS: 0800001042 Permit Numbers: 0812NMC0088 | 08-RIV-79-R13.5/R19.2,R24.0/R24.4 | Enter onto State right-of-way to widen State Route 79/Winchester Road from Abelia Street (PM 10.40) to 250 m north of Scott Road (PM 12.24) and widening from 355 m south of Newport Road to Newport Road (PM 15.15). Modified signal and lighting plans for Ab | State Route 79/Winchester Road, Riverside County | 08/25/2021 | 1 (03/26/2013) | Details CEM-3701 Report |
| 7216 | Project ID: 7216 DEA: 073P3304 EFIS: 0700020180 MINOR: 07A3286 | 07-LA-213-6.75/6.88 | Construct and improve sidewalk | City of Torrance form 234st and GX-ATSF Railroad Crossing | 1 (01/14/2013) | Details CEM-3701 Report | |
| 7217 | Project ID: 7217 EFIS: 1200000372 MINOR: 12A1379 | 12-ORA-39- | Upgrade Lighting | 09/30/2014 | 1 (03/26/2013) | Details CEM-3701 Report |
