Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7761-7770 of 19515 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212062 | Project ID: 212062 DEA: 040K9504 EFIS: 0416000173 | 04-SCL-17-2.8/7.5 | HM1 - REPLACE ASPHALT CONCRETE SURFACING. | SANTA CLARA COUNTY IN SANTA CLARA AND LOS GATOS FROM 0.1 MILE NORTH OF HEBARD WAY TO 0.16 MILE SOUTH OF BLOSSOM HILL ROAD | 08/22/2018 | 1 (04/20/2017) | Details CEM-3701 Report |
| 1002539 | Project ID: 1002539 DEA: 042X7104 EFIS: 0425000144 | 04-SOL--unknown | HM1 Pavement | SOLANO COUNTY NEAR DIXON ON ROUTE 80 AT PEDRICK ROAD OVERCROSSING AND ON ROUTE 113 FROM ROUTE 12 TO 0.3 MILE SOUTH OF PARKWAY BOULEVARD | 1 (08/11/2026) | Details CEM-3701 Report | |
| 212865 | Project ID: 212865 DEA: 043K6304 EFIS: 0417000188 | 04-SM-35,109-21.0/23.0,1.1/1.8 | HM1 PROJECT - MILL AND REPLACE WITH RHMA OVERLAY | IN SAN MATEO COUNTY ON ROUTE 35 FROM 2.0 MILES JUNCTION ROUTE 92 TO ROUTE 92 AND IN CITY OF MENLO PARK ON ROUTE 109 FROM NOTRE DAME AVENUE TO ROUTE 84 | 10/21/2019 | 1 (08/28/2019) | Details CEM-3701 Report |
| 212864 | Project ID: 212864 DEA: 040P6504 EFIS: 0417000500 | 04-SM-92-3.2/R7.3 | HM1 PROJECT- COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA | IN SAN MATEO COUNTY ON ROUTE 92 NEAR SAN MATEO FROM PILARCITOS CREEK TO ROUTE 28092 | 10/21/2019 | 1 (08/28/2019) | Details CEM-3701 Report |
| 212226 | Project ID: 212226 DEA: 040K9704 EFIS: 0416000175 | 04-SM-101,380-VAR | HM1 Project. COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HMA (TYPE A). | SAN MATEO COUNTY AT VARIOUS LOCATIONS | 08/08/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 212260 | Project ID: 212260 DEA: 040K9604 EFIS: 0416000174 | 04-SM-35-R28.7/30.0 | HM1 Project. REPLACE ASPHALT CONCRETE PAVEMENT. | SAN MATEO COUNTY IN DALY CITY FROM ROUTE 35/1 SEPARATION TO 0.3 MILE NORTH OF WESTMOOR AVENUE | 08/08/2018 | 1 (08/10/2017) | Details CEM-3701 Report |
| 1001089 | Project ID: 1001089 DEA: 010P3604 EFIS: 0124000224 | 01-LAK-175-0.0/R8.2 | HM1 type Maintenance project. REPLACE AC SURFACING, MICRO-SURFACING, AND PAVEMENT DELINEATION. | LAKE COUNTY NEAR LAKEPORT FROM THE MENDOCINO COUNTY LINE TO 1.3 MILES EAST OF MATHEWS ROAD | 12/02/2025 | 1 (05/01/2025) | Details CEM-3701 Report |
| 214854 | Project ID: 214854 DEA: 112N0714 EFIS: 1119000163 | 11-SD-15,52,78-Var | HM1/ Microsurfacing Ramps at Various Locations | 01/31/2022 | 1 (09/01/2020) | Details CEM-3701 Report | |
| 1002538 | Project ID: 1002538 DEA: 010P5404 EFIS: 0125000037 | 01-HUM-101-R22.4/28 | HM12200P540-Miranda Micro-Surfacing | Near Miranda at French Road Undercrossing and from Salmon Creek Bridge to Myers Flat Separation | 1 (08/11/2026) | Details CEM-3701 Report | |
| 1000684 | Project ID: 1000684 DEA: 010M3904 EFIS: 0123000005 MINOR: 01A6418 | 01--- | HM4 type maintenance project | 1 (10/24/2024) | Details CEM-3701 Report |
