Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7751-7760 of 18782 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7172 | Project ID: 7172 DEA: 080C7434 EFIS: 0800020305 | 08-SBD,RIV-60,71-Var | INSTALL EXIT NUMBER I10G SIGNS AND PANELS | SAN BERNARDINO AND RIVERSIDE COUNTIES AT VARIOUS LOCATIONS | 05/07/2013 | 1 (11/28/2012) | Details CEM-3701 Report |
| 7173 | Project ID: 7173 DEA: 080K2004 | 08-SBD-18-75.3/75.7 | CONSTRUCT LEFT TURN LANE | SAN BERNARDINO COUNTY AT LUCERNE VALLEY FROM 0.2 MILE WEST OF CUSTER AVENUE TO 0.1 MILE WEST OF CHRISTENSON ROAD | 11/13/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 7174 | Project ID: 7174 DEA: 080P9404 | 08-RIV-111-0.0/6.0,56.2/R63.3 | COLD PLANE AND OVERLAY WITH RHMA-G AND LOCAL DIG-OUTS | RIVERSIDE COUNTY AT SALTON AND IN PALM SPRINGS FROM RIVERSIDE-IMPERIAL COUNTY LINE TO MECCA BEACH CAMP ROAD AND FROM CHINO CREEK BRIDGE TO ROUTE 111/10 SEPARATION | 11/13/2012 | NOT VERIFIED | Details CEM-3701 Report |
| 7175 | Project ID: 7175 DEA: 080P9504 | 08-RIV-74-47.9/63.067.5/71.8 | COLD PLANE, REPLACE AC SURFACING AND RHMA-G AND HMA-A OVERLAY | RIVERSIDE COUNTY IN HEMET AND NEAR ANZA FROM MARSHALL AVENUE TO HURKEY CREEK BRIDGE AND FROM 0.4 MILE WEST OF MORRIS RANCH ROAD TO ROUTE 74/371 SEPARATION | 08/26/2013 | 1 (04/02/2012) | Details CEM-3701 Report |
| 7176 | Project ID: 7176 DEA: 09344204 | 09-MNO-120-R3.7 | REHABILITATE BRIDGE DECK. | MONO COUNTY ABOUT 9 MILES WEST OF LEE VINING AT DODGE POINT SIDEHILL VIADUCT BRIDGE | 02/07/2013 | 1 (04/09/2012) | Details CEM-3701 Report |
| 7177 | Project ID: 7177 DEA: 09348104 EFIS: 0900020098 | 09-INY,MNO-395,6-var | BONDED WEARING COURSE OVERLAY. | INYO AND MONO COUNTIES AT VARIOUS LOCATIONS | 10/10/2013 | 1 (09/24/2012) | Details CEM-3701 Report |
| 7178 | Project ID: 7178 DEA: 09348304 EFIS: 0900020096 | 09-INY-127-0.1/16.2 | REMOVE AND PLACE CULVERTS. | INYO COUNTY AT AND NEAR SHOSHONE AT VARIOUS LOCATIONS FROM 0.1 MILE NORTH OF SAN BERNARDINO COUNTY LINE TO 0.2 MILE SOUTH OF NORTH JUNCTION 178 | 08/22/2012 | 1 (06/11/2012) | Details CEM-3701 Report |
| 7179 | Project ID: 7179 DEA: 09349204 EFIS: 0900020066 | 09-MNO-108,182,395-Var | BRIDGE DECK POLYESTER CONCRETE OVERLAY AND CABLE RAILING. | MONO COUNTY AT VARIOUS LOCATIONS | 08/27/2012 | 1 (06/21/2012) | Details CEM-3701 Report |
| 7180 | Project ID: 7180 DEA: 09350104 EFIS: 0900000227 | 09-MNO-158-2.5/2.9 | CONSTRUCT SIDEWALKS AND ADA RAMPS. | MONO COUNTY AT JUNE LAKE FROM WEST BIG ROCK ROAD TO GULL LAKE ROAD | 08/22/2013 | 1 (09/11/2012) | Details CEM-3701 Report |
| 7181 | Project ID: 7181 DEA: 100V5904 EFIS: 1000020471 | 10-SJ-4-14.2 | CLEAN AND PAINT STRUCTURAL STEEL EXISTING BRIDGE. | SAN JOAQUIN COUNTY NEAR STOCKTON AT SAN JOAQUIN RIVER BRIDGE | 10/27/2014 | 1 (04/16/2012) | Details CEM-3701 Report |
