Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7661-7670 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 2342 | Project ID: 2342 DEA: 04449604 | 04-SOL-80-R9.8 | STABILIIZE LANDSLIDE | IN SOLANO COUNTY IN AND NEARFAIRFIELD AT 0.3 KM EAST OF LYNCH ROAD UNDERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 2067 | Project ID: 2067 DEA: 04258714 | 04-SOL-680-R1.4 | WIDEN SHOULDERS | IN SOLANO COUNTY IN AND NEARBENICIA AND FAIRFIELD FROM BENICIAVIADUCT TO ROUTE 680 AND 80 SEPARATION | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1599 | Project ID: 1599 DEA: 040A2104 | 04-SOL-12-20.6 | INSTALL BARRIER AND RUMBLE STRIPE | IN SOLANO COUNTY IN AND NEAR RIOVISTA FROM CURRIE ROAD TO DRUIN DRIVE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 2089 | Project ID: 2089 DEA: 04271004 | 04-SOL-80-13 | INSTALL OVERHEAD EXIT GUIDE SIGNS | IN SOLANO COUNTY AT VARIOUS LOCATIONS | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 2323 | Project ID: 2323 DEA: 04443604 | 04-SOL-80- 7.9 | INSTALL OR UPGRADE RAMP LIGHTING | IN SOLANO COUNTY AT VARIOUS LOCATIONS | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1695 | Project ID: 1695 DEA: 040E9004 | 04-SOL-12,29,VAR-VAR | TREAT BRIDGE DECK WITH METHACRYLATE AND RE[LACE JOINT SEALS | In Solano and Napa Counties. At various locations | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 209893 | Project ID: 209893 DEA: 043J0204 EFIS: 0415000071 | 04-SOL-37,037-9.8/10.6,2.37 | Repair Earthquake damage to Bridges . Includes Bridge at Nap 29 PM 2.37 | In Solano and Napa Counties, in and near American Canyon, from Broadway to Fairground Drive and Lombard OH | 01/14/2016 | 1 (12/01/2014) | Details CEM-3701 Report |
| 1825 | Project ID: 1825 DEA: 04152904 | 04-SOL-80-5.6 | INSTALL MANAGEMENT SYSTEM ELEMENTS | IN SOLANO AND NAPA COUNTIES ONROUTE 80 AT AMERICAN CANYON ROADOVERCROSSING AND WEST TEXAS UNDERCROSSING | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1331 | Project ID: 1331 DEA: 04006064 | 04-SOL-680-L.3 | CONSTRUCT BRIDGE INTERCHANGE | IN SOLANO AND CONTRA COSTA COUNTIES IN BENICIA AND MARTINEZ ON ROUTES 680 AND 780 INTERCHANGE | 07/29/2011 | 1 (07/29/2011) | Details CEM-3701 Report |
| 1329 | Project ID: 1329 DEA: 04006034 EFIS: 0400000003 COOP: 042389 | 04-CC-680-24.9 | CONSTRUCT NEW BRIDGE | IN SOLANO AND CONTRA COSTA COUNTIES IN BENICIA AND MARTINEZ AT BENICIA-MARTINEZ BRIDGE | 11/11/2010 | 1 (11/11/2010) | Details CEM-3701 Report |
