Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7651-7660 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 966 | Project ID: 966 DEA: 031F6104 EFIS: 0300020030 | 03-PLA-80-6.1 | Replace a Type 15 light/signal pole with one Type 15 pole and one Type 1B pole | At the intersection of Rocklin Road and WB I-80 Off ramp/Onramp | 12/04/2017 | 1 (10/21/2010) | Details CEM-3701 Report |
| 1001332 | Project ID: 1001332 Permit Numbers: 0424NCS0875 | 04-ALA-238-15.03 | Construct street Improvements to enhance bicycle and pedestrian safety within State right-of-way, on State Highway 04-ALA-238, Post Mile 15.03, in Alameda County. | At the Intersection of SR238 Eastbound On- and Off Ramps and E. Lewelling Blvd | 1 (06/24/2025) | Details CEM-3701 Report | |
| 6960 | Project ID: 6960 DEA: 042L3604 EFIS: 0400000873 MINOR: 04A3710 | 04-SON-116-31.1/31.6 | Install safety street lighting | At the intersection of State Route 116 and Llano Road in Sonoma County. | 06/08/2020 | 1 (10/30/2019) | Details CEM-3701 Report |
| 208894 | Project ID: 208894 DEA: 041G5404 EFIS: 0400020033 COOP: 042431 | 04-SM-82-17.08 | INSTALLATION OF TRAFFIC SIGNALS | AT THE INTERSECTION OF STATE ROUTE 82 AND MILLWOOD DRIVE IN THE CITY OF MILLBRAE | 08/22/2018 | 1 (06/17/2015) | Details CEM-3701 Report |
| 209565 | Project ID: 209565 DEA: 060P6704 EFIS: 0612000201 COOP: 061589 | 06-TUL-245-7.1/7.24 | Construction of roundabout | At the intersection of State Rte. 245 and 216 , in the City of Woodlake | 08/06/2015 | 2 (12/26/2014) | Details CEM-3701 Report |
| 210292 | Project ID: 210292 DEA: 044G5404 COOP: 042549 | 04-NAP-29- | Install two (2) separate roundabouts at the intersections | At the intersections of 1st Street/California Boulevard and 2nd Street/California Boulevard (City Roundabouts) and another roundabout at the State Route 29 northbound on and off-ramps and 1st Street intersection (Caltrans Roundabout). | 09/26/2022 | 2 (08/19/2019) | Details CEM-3701 Report |
| 210617 | Project ID: 210617 DEA: 042J1004 EFIS: 0414000426 COOP: 042549 | 04-NAP-29-11.3/11.6 | CONSTRUCT TWO SEPARATE ROUNDABOUT PROJECTS TOGETHER INTO ONE SINGLE PROJECT AND CONSTRUCTION CONTRACT. | AT THE INTERSECTIONS OF FIRST STREET/ CALIFORNIA BLVD AND SECOND STREET/CALIFORNIA BLVD (CITY) AND AT HE STATE ROUTE 29 NORTHBOUND ON AND OFF RAMPS AND FIRST STREET ( CALTRANS) | 09/28/2021 | 1 (08/19/2019) | Details CEM-3701 Report |
| 994441 | Project ID: 994441 DEA: 081A8304 EFIS: 0800000579 COOP: 081746 | 08--- | Widening the existing Cedar Avenue overcrossing (OC) from 6 to 10 lanes, replacing the Union Pacific Railroad overhead (OH), widening Cedar Avenue from 4 to 6 through lanes, and realigning and/or widening the interchange entrance and exit ramps | At the Interstate 10 (I-10) Cedar Avenue Interchange from PM 17.8 to 19.3 in the County of San Bernardino (County) | 2 (12/13/2022) | Details CEM-3701 Report | |
| 7493 | Project ID: 7493 DEA: 03371504 EFIS: 0300000426 COOP: 030375 Permit Numbers: 0312NMC0111 | 03-SAC--34.7/25.9 | Construct a new interchange, including an eight lane wide overcrossing | At the location of Elverta Road and Highway 99 | 03/09/2020 | 1 (12/13/2012) | Details CEM-3701 Report |
| 2115 | Project ID: 2115 DEA: 04294924 | 04-ALA-24-7.6/8.8 | REALIGN WESTBOUND RTE 24 TO NB RTE 13 OFF RAMP | At the Route 13/Route 14 connector in Alameda County | 05/11/2011 | 1 (05/11/2011) | Details CEM-3701 Report |
