Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7641-7650 of 18867 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214179 | Project ID: 214179 DEA: 042J7504 EFIS: 0415000338 | 04-SCL-280-R2.78/R17.8 | Seismic Restoration | Arasteradero RD, UC and Bird Ave. OC | 01/21/2021 | 1 (04/01/2020) | Details CEM-3701 Report |
| 209578 | Project ID: 209578 DEA: 042285G4 EFIS: 0400021065 COOP: 042519 | 04-CC-680-R4.2/R6.6 | Landscaping Improvement | Area of the I-680 Auxiliary Lanes (between Crow Canyon Rd in San Ramon and Sycamore Valley Rd in Danville) | 2 (05/20/2014) | Details CEM-3701 Report | |
| 6995 | Project ID: 6995 DEA: 033F2704 | 03-SAC-99-6.01 | Replace Girder | Arno Rd OC (Br No. 24-0151) | 04/06/2012 | 1 (01/09/2012) | Details CEM-3701 Report |
| 1589 | Project ID: 1589 EFIS: 0000001155 Permit Numbers: 0409NSN1475 | 04-CC-4-0/13.8 | At Arnold Industrial Way/Peralta Road, installation of traffic signal poles, conduit, pull-boxes and detector loops for signal. | Arnold Industrial Way / Peralta Road, Concord | 09/14/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 1794 | Project ID: 1794 EFIS: 0000001155 Permit Numbers: 0411NRD0762 | 04-CC-4-13.8 | At Arnold Industrial Way/Peralta Road, installation of traffic signal poles, conduit, pull-boxes and detector loops for signal. | Arnold Industrial Way / Peralta Road, Concord | 08/20/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 209224 | Project ID: 209224 Permit Numbers: 04136DP2233 0411NSN0807 0413NRD1546 | 04-CC-4-13.8/13.8 | Install traffic signal system on Arnold Industrial Way Route-4 Westbound Ramps. | Arnold Industrial Way / Westbound Ramps, Concord | 08/21/2018 | 1 (12/10/2013) | Details CEM-3701 Report |
| 215189 | Project ID: 215189 COOP: CML5131(020) | --20- | ARCADIA GOLD LINE STATION PEDESTRIAN LINKAGE PROJECT | AROUND THE GOLD LINE ARCADIA STATION | NOT VERIFIED | Details CEM-3701 Report | |
| 213205 | Project ID: 213205 DEA: 051J6704 | 05-SB-192-15.4/15.6 | Replace bridge and restore roadway | Arroyo Paredon Bridge | 05/08/2019 | 1 (09/27/2018) | Details CEM-3701 Report |
| 6859 | Project ID: 6859 EFIS: 0000001155 Permit Numbers: 1209NMC0151 | 12-ORA-39-15.573/15.573 | Perform street improvements along Artesia Blvd including pavement rehabilitation at the Artesia Blvd/Knott Avenue intersection; pavement rehabilitation and modification to the east leg of the intersection at Artesia Blvd/Firestone Blvd/I-5 Northbound Ramp | ARTESIA BLVD, BUENA PARK | 09/08/2016 | NOT VERIFIED | Details CEM-3701 Report |
| 212813 | Project ID: 212813 Permit Numbers: 0414NSN1915 0417NRT1880 0415NSN0962 0417NRT1881 0417NRT0135 04176DP2579 | 04-ALA-13-11.4/11.4 | Install pedestrian hybrid beacon (HAWK) at Ashby and Hillegass for bike and pedestrian activated crossing along City Bicycle Boulevard. | Ashby Ave, Berkeley | 01/18/2019 | 1 (11/01/2017) | Details CEM-3701 Report |
