Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7621-7630 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7804 | Project ID: 7804 Permit Numbers: 0312NMC0377 | 03-ED-50-0.6/1.35 | Reconstruct Westbound on and off-ramps, place signals, lights, and signs | US-50/El Dorado Hills Blvd Interchange, El Dorado Hills CDP | 04/27/2018 | 2 (01/29/2013) | Details CEM-3701 Report |
| 7806 | Project ID: 7806 DEA: 073X8504 EFIS: 0713000207 | 07-LA-10-21.2 | Repair slope and washed out drain | Westbound La 10 to east off ramp | 1 (10/18/2012) | Details CEM-3701 Report | |
| 7807 | Project ID: 7807 DEA: 032E5104 EFIS: 0312000163 | 03-ED-50-0.6/1.35 | El Dorado Blvd Interchange Improvements | Near El Dorado Hills on US-50 from .45 mile west to 0.3 mile east of the Latrobe Undercrossing and from 0.05 mile south of US-50 to .3 mile north of Saratoga Way | 11/30/00-1 | 2 (10/23/2012) | Details CEM-3701 Report |
| 7809 | Project ID: 7809 DEA: 024F8404 EFIS: 0213000042 | 02-PLU-70-12.8/16.54 | Remove Debris, install debris racks, improve sumps to prevent culvert clogs | Near Belden at 0.8 mile west of Chip Creek Bridge to North Fork River Bridge | 01/18/2013 | 1 (10/22/2012) | Details CEM-3701 Report |
| 7816 | Project ID: 7816 DEA: 022E2914 EFIS: 0212000081 | 02-SIS-96-R0.0/77.3 | POLYESTER OVERLAY ON BRIDGE DECKS, CLEAN AND PAINT STRUCTURAL STEEL | SISKIYOU COUNTY AT VARIOUS LOCATIONS FROM HUMBOLDT COUNTY LINE TO 0.2 MILE NORTH OF KLAMATH RIVER BRIDGE NO. 02-0117 | 03/22/2017 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7826 | Project ID: 7826 DEA: 040A1854 EFIS: 0400020652 COOP: 042363 | 04-SON-101-7.1/8.1 | RECONSTRUCT INTERCHANGE | SONOMA COUNTY IN PETALUMA FROM 0.6 MILE SOUTH TO 0.4 MILE NORTH OF OLD REDWOOD HIGHWAY OVERCROSSING | 01/03/2017 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7840 | Project ID: 7840 DEA: 060H1004 EFIS: 0600020366 | 06-FRE-168-T25.5/R32.9 | REPAIR FAILED AREAS, OVERLAY ROADWAY, AND RECONSTRUCT MBGR. | FRESNO COUNTY AT AND NEAR PRATHER FROM 0.1 MILE NORTH OF OAK CREEK ROAD TO 0.1 MILE NORTH OF SJ AND E ROAD | 10/01/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7862 | Project ID: 7862 DEA: 074T3504 EFIS: 0700020019 | 07-LA-5755- | CONSTRUCT SAND-SALT SHED. | KERN COUNTY NEAR LEBEC AT THE FRAZIER SAND-SALT SHED | 07/02/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7870 | Project ID: 7870 DEA: 100S7804 EFIS: 1000020094 | 10-STA-99-R2.3/R20.2 | CONCRETE SLOPE PAVING, CHAIN LINK RAILING, AND BRIDGE PAINTING. | STANISLAUS COUNTY IN AND NEAR TURLOCK, CERES AND MODESTO AT VARIOUS LOCATIONS FROM LINWOOD AVENUE OVERCROSSING TO BECKWITH ROAD OVERCROSSING | 01/02/2015 | 1 (12/10/2012) | Details CEM-3701 Report |
| 7878 | Project ID: 7878 DEA: 073X8404 EFIS: 0712000203 | 07-LA-5-3.6/11.6 | Replaced failed pavement slabs | From Firestone Blvd U/C to Washington Blvd U/C across several cities of southeastern LA County | 12/03/2012 | 1 (12/10/2012) | Details CEM-3701 Report |
