Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7621-7630 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214326 | Project ID: 214326 DEA: 07310404 EFIS: 0715000001 | 07-LA-138-0.0/36.9 | PLACE HOT MIX ASPHALT AND COLD PLANE ASPHALT CONCRETE PAVEMENT. (EPD Pilot Project) | LOS ANGELES COUNTY FROM ROUTE 5/138 SEPARATION TO ROUTE 138/14 SEPARATION | 03/29/2024 | 1 (10/29/2019) | Details CEM-3701 Report |
| 5443 | Project ID: 5443 DEA: 09343204 EFIS: 0900020026 | 09-MNO-182,395-0.0/6.5,65.1/77.0 | PLACE HOT MIX ASPHALT (WITH WARM MIX ADDITIVE) OVERLAY. | MONO COUNTY AT VARIOUS LOCATIONS | 11/26/2013 | 1 (04/25/2011) | Details CEM-3701 Report |
| 215367 | Project ID: 215367 DEA: 021J4904 EFIS: 0220000084 | 02-TEH-32-14.0/20.0 | PLACE HOT MIX ASPHALT (TYPE A). | TEHAMA COUNTY ABOUT 28 MILES EAST OF FOREST RANCH FROM 1.1 MILES EAST OF DEER CREEK BRIDGE NO. 08-0068 TO 0.4 MILE WEST OF SLATE CREEK BRIDGE NO. 08-0154 | 04/11/2024 | 1 (12/24/2020) | Details CEM-3701 Report |
| 215483 | Project ID: 215483 DEA: 022J0004 EFIS: 0221000017 | 02-PLU-49-0.0/7.5 | PLACE HOT MIX ASPHALT (TYPE A). | PLUMAS COUNTY AT AND NEAR VINTON FROM SIERRA COUNTY LINE TO ROUTE 70 | 11/24/2021 | 1 (03/08/2021) | Details CEM-3701 Report |
| 124 | Project ID: 124 DEA: 01452404 | 01-HUM-96-16.0/18.7 | PLACE HOT MIX ASPHALT (TYPE A), CONSTRUCT RETAINING WALL AND MBGR | 03/11/2011 | 1 (10/27/2008) | Details CEM-3701 Report | |
| 994345 | Project ID: 994345 DEA: 023J7804 EFIS: 0222000083 | 02-TRI-36-15.8/16.9,20.5/24.5 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING. | TRINITY COUNTY NEAR FOREST GLEN FROM 1.1 MILES WEST OF SOUTH FORK TRINITY RIVER BRIDGE TO SOUTH FORK TRINITY RIVER BRIDGE NO. 05-0026 AND FROM UPPER RATTLESNAKE CREEK BRIDGE NO. 05-0073 TO 0.3 MILE WEST OF TRINITY PINES ROAD | 08/22/2023 | 1 (03/28/2023) | Details CEM-3701 Report |
| 995484 | Project ID: 995484 DEA: 024J8504 EFIS: 0223000080 | 02-LAS-395-130.0/133.0 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING. | LASSEN COUNTY NEAR MADELINE FROM 0.8 MILE NORTH TO 3.8 MILES NORTH OF ASH VALLEY ROAD | 01/24/2025 | 1 (11/27/2023) | Details CEM-3701 Report |
| 1000088 | Project ID: 1000088 DEA: 024J8104 EFIS: 0223000076 | 02-TEH-32-20.0/R24.8 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE ASPHALT CONCRETE SURFACING. | TEHAMA COUNTY ABOUT 33 MILES EAST OF FOREST RANCH FROM 0.5 MILE WEST OF SLATE CREEK BRIDGE TO ROUTE 36 | 06/16/2025 | 1 (03/18/2024) | Details CEM-3701 Report |
| 993681 | Project ID: 993681 DEA: 022J4304 EFIS: 0221000077 | 02-TEH-32-R6.2/14.0 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE AC SURFACING. | TEHAMA COUNTY ABOUT 20 MILES EAST OF FOREST RANCH FROM 2.7 MILES EAST OF SODA SPRINGS ROAD TO 1.1 MILES EAST OF DEER CREEK BRIDGE 08-0068 | 04/11/2024 | 1 (04/05/2022) | Details CEM-3701 Report |
| 994319 | Project ID: 994319 DEA: 023J7104 EFIS: 0222000076 | 02-PLU-89-8.7/12.9 | PLACE HOT MIX ASPHALT (TYPE A) AND REPLACE AC SURFACING. | PLUMAS COUNTY NEAR CRESCENT MILLS FROM ROUTE 70 TO 0.7 MILE SOUTH OF DIXIE CANYON ROAD | 04/21/2025 | 1 (10/26/2022) | Details CEM-3701 Report |
