Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7611-7620 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3423 | Project ID: 3423 DEA: 06415904 | 06-KIN-41-11.6/20.0 | PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT AND WIDEN SHOULDERS. | KINGS COUNTY NEAR KETTLEMAN CITY FROM 0.1 MILE SOUTH OF UTICA AVENUE TO 0.1 MILE SOUTH OF QUAIL AVENUE | 07/05/2012 | 1 (05/11/2011) | Details CEM-3701 Report |
| 2596 | Project ID: 2596 DEA: 050K2404 | 05-SCr-9-12.4/39.6 | PLACE HOT MIX ASPHALT DIKES AND INSTALL MBGR AND CRASH CUSHIONS | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report | |
| 2694 | Project ID: 2694 DEA: 050N0604 EFIS: 0500000806 | 05-SLO-101-7.8/16.4 | PLACE HOT MIX ASPHALT CONCRETE ON EXISTING PAVEMENT. | SAN LUIS OBISPO COUNTY IN AND NEAR ARROYO GRANDE AND PISMO BEACH FROM LOS BERROS UNDERCROSSING TO PISMO CREEK BRIDGE | 08/16/2013 | 1 (07/26/2010) | Details CEM-3701 Report |
| 5463 | Project ID: 5463 DEA: 09347704 | 09-INY-136-0.0/10.0,12.5/17.7 | PLACE HOT MIX ASPHALT CONCRETE (OPEN GRADED) ON EXISTING PAVEMENT. | INYO COUNTY NEAR LONE PINE FROM 0.1 MILE EAST TO 10.0 MILES EAST OF ROUTE 395 AND FROM 12.5 MILES EAST OF ROUTE 395 TO ROUTE 190 | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
| 3725 | Project ID: 3725 DEA: 070P7904 | 07-LA-5-16.6 | PLACE HOT MIX ASPHALT AND UPGRADE SAFETY DEVICES | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report | |
| 5609 | Project ID: 5609 DEA: 100L6304 | 10-SJ,STA-99-R24.3/R24.8,0.0/1.7 | PLACE HOT MIX ASPHALT AND UPGRADE MEDIAN BARRIER | 12/27/2012 | 1 (10/05/2009) | Details CEM-3701 Report | |
| 211065 | Project ID: 211065 DEA: 060T5804 EFIS: 0615000154 | 06-FRE,MAD-145-40.2/R41.2,R0.0/2.0,11.0/13.6 | PLACE HOT MIX ASPHALT AND REPAIR FAILED AREAS. | IN FRESNO AND MADERA COUNTIES NEAR MADERA FROM W. SHAW AVENUE TOAVENUE 7 AND FROM TOZER STREET TO RIVER ROAD | 02/21/2017 | 1 (10/04/2016) | Details CEM-3701 Report |
| 214728 | Project ID: 214728 DEA: 033H6404 EFIS: 0318000026 | 03-NEV-49-2.0/2.5 | PLACE HOT MIX ASPHALT AND MODIFYING SIGNAL AND LIGHTING SYSTEM. | NEVADA COUNTY AT HIGGINS CORNER FROM 0.20 MILE SOUTH OF WOLF ROAD/COMBIE ROAD TO 0.30 MILE NORTH OF WOLF ROAD/COMBIE ROAD | 09/28/2021 | 1 (03/24/2020) | Details CEM-3701 Report |
| 212872 | Project ID: 212872 DEA: 07302204 EFIS: 0713000481 | 07-VEN-126-0.0/R13.6 | PLACE HOT MIX ASPHALT AND INDIVIDUAL SLAB REPLACEMENT. | VENTURA COUNTY IN VENTURA AND SANTA PAULA FROM ROUTE 126/101 SEPARATION TO HAUN CREEK BRIDGE | 05/26/2022 | 1 (04/27/2020) | Details CEM-3701 Report |
| 209915 | Project ID: 209915 DEA: 060Q2704 EFIS: 0613000050 | 06-FRE-5-48.8/53.0 | PLACE HOT MIX ASPHALT AND CONTINUOUSLY REINFORCED CONCRETE PAVEMENT. | FRESNO COUNTY ABOUT 38 MILES SOUTH OF SANTA NELLA FROM 0.1 MILE SOUTH OF PANOCHE ROAD OVERCROSSING TO 0.2 MILE NORTH OF RUSSELL AVENUE OVERCROSSING. | 08/24/2018 | 1 (12/29/2014) | Details CEM-3701 Report |
