Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7591-7600 of 18781 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993860 | Project ID: 993860 DEA: 101J6504 EFIS: 1021000107 MINOR: 10A2303 | 10-STA-5-VAR | IN STANISLAUS COUNTY AT VARIOUS LOCATIONS | 09/01/2023 | 1 (06/06/2022) | Details CEM-3701 Report | |
| 211489 | Project ID: 211489 EFIS: 1015000058 MINOR: 10A1730 | 10-STA-4-0.0/R8.9,R21.1/28.0 | Pavement Delineation | In Sta and Cal Counties | 12/06/2019 | 1 (10/19/2016) | Details CEM-3701 Report |
| 210089 | Project ID: 210089 DEA: 043J7804 EFIS: 0415000198 | 04-SM-101-22.8/26.1, 22.7 | Reconstruct pavement and repair drainage system | In South San Fran, from Oyster Point Blvd to the SF County Line | 12/27/2017 | 1 (09/17/2015) | Details CEM-3701 Report |
| 2460 | Project ID: 2460 DEA: 042L2104 EFIS: 0400000860 MINOR: 04A3581 | 04-SON--28.5 | Modify Traffic Signals in Sonoma County near Sebastopol at Bloomfield Road/ Bassignini Road | In Sonoma Cty. near Petaluma. | 06/08/2020 | 1 (03/19/2012) | Details CEM-3701 Report |
| 212470 | Project ID: 212470 DEA: 044A1304 EFIS: 0400001106 COOP: 042718 | 04-SON-101-18.5/18.5 | CONSISTS OF MODIFICATION AND RECONSTRUCTION OF THE EXISTING US 101/HEARN AVENUE INTERCHANGE IN SONOMA COUNTY, INCLUDING REPLACING THE EXISTING TWO-LANE HEARN AVENUE OVERCROSSING WITH A NEW OVERCROSSING, AND MODIFYING THE SOUTHBOUND OFF-RAMP IN CITY | IN SONOMA COUNTY. | 1 (09/23/2019) | Details CEM-3701 Report | |
| 212321 | Project ID: 212321 DEA: 044K9604 EFIS: 0417000381 | 04-SON-116-39.9/40.1 | reconstruct embankment with lightweight fill | IN SONOMA COUNTY, ON ROUTE 116, ABOUOT 0.5 MILE NORTH OF ROCHE RD TO 0.25 MILE SOUTH OF KULLBERG RD. REPLACE CULVERT AND REPAIR FAILED AC PAVEMENT | 09/23/2019 | 1 (05/20/2017) | Details CEM-3701 Report |
| 212115 | Project ID: 212115 DEA: 044K4504 EFIS: 0417000311 | 04-SON-101-37.1/37.2 | Construct soldier pile wall. | IN SONOMA COUNTY, ON ROUTE 101, IN HEALDSBURG. REPAIR SLIDE BY CONSTRUCTING SOLDIER PILE TIE-BACK WALL | 12/20/2017 | 1 (05/14/2017) | Details CEM-3701 Report |
| 212155 | Project ID: 212155 DEA: 044K6604 EFIS: 0417000333 | 04-SON-1-31.9, 31.4/31.9, 31.90 | construct sheet pile wall | IN SONOMA COUNTY, ON ROUTE 1, AT FORT ROSS. REPAIR SLIDE BY CONSTRUCTING SHEET PILE WALL AND REPAIR AC PAVEMENT. | 12/18/2017 | 1 (07/17/2017) | Details CEM-3701 Report |
| 209103 | Project ID: 209103 DEA: 042L2504 EFIS: 0400000864 MINOR: 04A4093 | 04-SON-116-27.6 | Install In-Roadway-Warning Lights with Flashing Beacons, Rebuild two Curb Ramps to ADA Standards | In Sonoma County, in the City of Sebatopol at Redwood Ave. | 06/08/2020 | 1 (09/03/2013) | Details CEM-3701 Report |
| 1001009 | Project ID: 1001009 DEA: 043X0504 EFIS: 0425000193 | 04-SON-116-10.4 | Apply traffic control systems, remove dirt and debris from slide, install RSP, drainage, erosion control, and reestablish MGS System. | In Sonoma County on State Route 116 at PM 10.4 near Montesano. | 1 (03/10/2025) | Details CEM-3701 Report |
