Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7581-7590 of 18867 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213483 | Project ID: 213483 DEA: 07303104 EFIS: 0713000498 Permit Numbers: 0716AOP1258 0717ART0155 0717ART0246 0716ADP2179 0717ART0246 | 07---21.5/21.5 | improvements including, but not limited to, widen roadway, remove median, add and upgrade signals, relocate sidewalk, utility work, and associated miscellaneous improvements DP is 716-ADP-2179 | 150 ft south of E. Walnut Drive N., Industry | 06/17/2021 | 1 (07/12/2018) | Details CEM-3701 Report |
| 4580 | Project ID: 4580 Permit Numbers: 0804NMC0380 | 08-RIV-15-19.11 | IMPROVEMENTS OF THE INTERCHANDE ON I-15 | 07/28/2010 | NOT VERIFIED | Details CEM-3701 Report | |
| 209304 | Project ID: 209304 DEA: 041A4214 EFIS: 0400000487 COOP: 2250A1 | 04-SON-116-19.4 | Improvements on State Rt. 116 at Mirabel Road | Rt. 116 in Forestville | 1 (01/27/2014) | Details CEM-3701 Report | |
| 4710 | Project ID: 4710 EFIS: 0000001155 Permit Numbers: 08076MC0090 | 08-RIV-15-48.2 | Improvements to the southerly side of Limonite Avenue including new curb and gutter, signs, striping, and relocation of an existing street light | in Riverside County at Limonite Avenue Interchange. | 12/28/2007 | 2 (12/28/2007) | Details CEM-3701 Report |
| 215738 | Project ID: 215738 DEA: 042Q8304 EFIS: 0419000056 COOP: 042803 | 04-ALA-680-4.8/5.0 | Improvements to the State Highway System | Sabercat Bridge and Trail connecting Ohlone College on the east side to future BART Station at Washington/Osgood and Blacow Road on the west, with a bicycle and pedestrian bridge over I-680 | 2 (09/07/2021) | Details CEM-3701 Report | |
| 209708 | Project ID: 209708 DEA: 04235524 EFIS: 0412000496 COOP: 042536,042616 | 04-SM-92,82-R11.2/10.5 | IMPROVEMENTS TO THE STATE ROUTE (SR) 92/EL CAMINO REAL (SR82) INTERCHANGE | IN THE CITY OF SAN MATEO | 02/14/2018 | 1 (10/24/2016) | Details CEM-3701 Report |
| 210439 | Project ID: 210439 DEA: 041G6204 EFIS: 0415000236 COOP: 042578 | 04-SM-101-8.1/8.6 | Improvements to US 101/Holly Street Interchange | US 101/Holly Street Interchange in San Mateo County | 2 (10/26/2015) | Details CEM-3701 Report | |
| 213522 | Project ID: 213522 Permit Numbers: 04156MC1779 04186RW1578 04186DP2478 | 04-NAP--4.6/4.6 | Improvements will include roadway excavation. | Unlisted, Unlisted | 02/05/2020 | 1 (09/26/2018) | Details CEM-3701 Report |
| 214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
| 6645 | Project ID: 6645 DEA: 120H5504 | 12-ORA-5,57-33.2/34.0,10.9/11.2 | IMPROVING SIGNING AND STRIPING | ORANGE COUNTY IN SANTA ANA AND ORANGE ON ROUTE 5 FROM MAIN STREET OVERCROSSING TO ROUTE 57 SEPARATION AND ON ROUTE 57 FROM ROUTE 5 SEPARATION TO 0.7 MILE SOUTH OF CHAPMAN AVENUE UNDERCROSSING | 10/29/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
