Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7561-7570 of 18867 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7891 | Project ID: 7891 DEA: 08341604 EFIS: 0800000613 | 08-SBD-15-29.5/30.9 | New Construction on I-15 at Ranchero Road | In the City of Hesperia | 08/25/2021 | 2 (02/04/2013) | Details CEM-3701 Report |
| 210750 | Project ID: 210750 DEA: 051G8104 | 05-SB-101-18.9/25.8, 18.9.25.8 | Expand recycled water sysltem along Route 101 | In the City of Goleta and Coutny of Santa Barbara from El Sueno Road to Stroke /Glenn Annie Road OC | 08/28/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 208848 | Project ID: 208848 DEA: 060Q6804 EFIS: 0613000195 COOP: 061548 | 06-TUL-198-R11.6 | Construction of Roundabout at Noble Ave and State Route 198 Eastbound Ramps | In the City of Farmersville | 08/25/2021 | 2 (10/07/2013) | Details CEM-3701 Report |
| 213015 | Project ID: 213015 DEA: 120N98A4 EFIS: 1218000007 MINOR: 12A1715 | 12-ORA-55-R5.8 | 55/405 SEPARATION Improvements | IN THE CITY OF COSTA MESA, AT 0.2 MILES SOUTH OF 55/405 SEPARATION | 07/15/2021 | 1 (03/22/2018) | Details CEM-3701 Report |
| 210661 | Project ID: 210661 DEA: 074X6404 | 07-LA-5-9.5, 9.5 | Repair fire damage bridges. | In the city of Commerce | 10/26/2016 | 1 (09/16/2015) | Details CEM-3701 Report |
| 5121 | Project ID: 5121 DEA: 080N3104 | 08-SBD-10-20.5 | REPAIR DAMAGE DRAINAGE SYSTEM | IN THE CITY OF COLTON E/B I-10 EAST OFPEPPER ON-RAMP | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 7782 | Project ID: 7782 DEA: 031E4904 EFIS: 0300000264 Permit Numbers: 0311NMC1011 | 03-BUT-32-10.3/11.3 | Add lanes in each direction, including 8-foot shoulders, paved landscape median, timber guardrail and signal modification. | In the city of Chico, from State Route 99 to Forest Avenue. From Park and Ride Lot to El Monte Avenue, Chico | 12/07/2017 | 1 (03/27/2013) | Details CEM-3701 Report |
| 2468 | Project ID: 2468 EFIS: 0000001155 Permit Numbers: 0504NSN0248 | 05-SLO-101-14.61 | Revise the intersection and install signals along the northbound Highway 101 on and off ramps in Camino Mercado/West Branch Street in the City of Arroyo Grande | In the City of Arroyo Grande | 05/05/2011 | NOT VERIFIED | Details CEM-3701 Report |
| 215232 | Project ID: 215232 DEA: 101J4204 EFIS: 1018000163 | 10-CAL-49-7.7/8.7 | Install Angels Camp Sidewalks and Bike Lane | In the City of ANgels Camp at Various Locaitons | 07/13/2021 | 2 (11/06/2020) | Details CEM-3701 Report |
| 1375 | Project ID: 1375 DEA: 040435V4 | 04-SF-80- 4.9 | SEISMIC RETROFIT- BAY BRIDGE APPROACH | IN THE CITY AND COUNTY OFSAN FRANCISCO FROM FIFTH STREET TO SAN FRANCISCO OAKLAND BAY BRIDGE | 04/20/2011 | 1 (04/20/2011) | Details CEM-3701 Report |
