Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7521-7530 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 213522 | Project ID: 213522 Permit Numbers: 04156MC1779 04186RW1578 04186DP2478 | 04-NAP--4.6/4.6 | Improvements will include roadway excavation. | Unlisted, Unlisted | 02/05/2020 | 1 (09/26/2018) | Details CEM-3701 Report |
| 214131 | Project ID: 214131 DEA: 080N69U4 EFIS: 0812000307 COOP: 081635 | 08-RIV-60-22.1/22.6 | Improving Operation efficiency and traffic flow in the SR-60 Truck Corridor in Moreno Valley. Widening inside and outside shoulders in 6 stages. | R-60 Truck Climbing Lane . Construction of new east and west bound truck lanes from Gilman Springs road to 1.37 miles west if Jack Rabbit trail. Existing shoulders will be widened to standard 10 ft inside and 12 ft outside respectively. | 2 (04/30/2019) | Details CEM-3701 Report | |
| 6645 | Project ID: 6645 DEA: 120H5504 | 12-ORA-5,57-33.2/34.0,10.9/11.2 | IMPROVING SIGNING AND STRIPING | ORANGE COUNTY IN SANTA ANA AND ORANGE ON ROUTE 5 FROM MAIN STREET OVERCROSSING TO ROUTE 57 SEPARATION AND ON ROUTE 57 FROM ROUTE 5 SEPARATION TO 0.7 MILE SOUTH OF CHAPMAN AVENUE UNDERCROSSING | 10/29/2010 | 1 (03/15/2011) | Details CEM-3701 Report |
| 209059 | Project ID: 209059 DEA: 033E1004 EFIS: 0300000473 | 03-PLA-80-8.1/37.8 | IMPROVING VERTICAL CLEARANCE | PLACER COUNTY IN AND NEAR LOOMIS, PENRYN, NEWCASTLE, WEIMAR, AND MAGRA FROM 0.1 MILE WEST OF BRACE ROAD OVERCROSSING TO 0.1 MILE EAST OF MAGRA OVERCROSSING | 01/23/2017 | 1 (01/15/2014) | Details CEM-3701 Report |
| 210130 | Project ID: 210130 Permit Numbers: 05146SI0482 | 05-SLO-41-11.29/11.93 | In accordance with the City of Atascadero Municipal Code Section 9-3.656 (C) (3) (Viii)(Ord No.580 5/13/2014)new advisory and warning signage is to be installed along the Highway 41 corridor to advise drivers of the approaching intersection with Los Altos Road. The scope of work shall include:1.Ins | Morro Rd., Arascadero | 09/17/2018 | NOT VERIFIED | Details CEM-3701 Report |
| 5879 | Project ID: 5879 DEA: 102A9804 | 10-TUO-4,108-35.4 | IN CAL & TUL COUNTIES CONSTRUCT TWO NEW SAND STORAGE BUILDINGS | 04/08/2011 | 1 (08/02/2006) | Details CEM-3701 Report | |
| 213907 | Project ID: 213907 DEA: 034H1704 EFIS: 0318000199 COOP: 030650 | 03-PLA-80,174-33.0/33.1 | In Colfax, at the I-80 westbound onramps and offramps to SR 174 (PM 33.0/33.1) - Install roundabout. Two Type 15 pole and luminaires in Caltrans Right of Way. | City of Colfax S. Auburn Street and WB I-80 On-Off-Ramp Roundabout Project | 02/10/2021 | 2 (02/19/2019) | Details CEM-3701 Report |
| 2996 | Project ID: 2996 DEA: 06025724 MINOR: 06A1148 | 06-FRE-80- | IN FRESNO AT 224 NORTH FULTON STREET, LANDSCAPE HISTORIC HOUSE | 04/21/2011 | NOT VERIFIED | Details CEM-3701 Report | |
| 3213 | Project ID: 3213 DEA: 060H3504 EFIS: 0600000124 MINOR: 06A1259 | 06-FRE-99-30.2 | IN FRESNO AT SB-OFF RAMP TO JENSEN AVENUE COLD PLANE AND OVERLAY EXISTING PAVEMENT | 06/04/2020 | 2 (11/25/2014) | Details CEM-3701 Report | |
| 3838 | Project ID: 3838 DEA: 07168004 EFIS: 0700000157 | 07-LA-5-R71.2/R74.0, R40.3/R42.3 | IN GENERAL CONSTRUCTING ON BRIDGE STRUCTURE, A SOIL NAIL WALL AND RETAINING WALL, WIDENING FIVE STRUCTURES, AND DEMOLISHING THE EXISTING BRIDGE STRUCTURE: Rte 5/14 HOV Lanes and Connectors: Rte 5/14 HOV Lanes and Connectors | CONSTRUCT HOV LANES AND CONNECTORS AT RT. 5/14 CONNECTOR IN SYLMAR, CA | 09/03/2015 | 1 (11/27/2012) | Details CEM-3701 Report |
