Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7491-7500 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000052 | Project ID: 1000052 DEA: 040Y8304 EFIS: 0422000344 | 04-SM-84,92,101,280-var | PLACE POLYESTER CONCRETE OVERLAY AND CONSTRUCT APPROACH SLAB. | SAN MATEO COUNTY AT VARIOUS LOCATIONS | 11/26/2024 | 1 (04/15/2024) | Details CEM-3701 Report |
| 2373 | Project ID: 2373 DEA: 044A5404 | 04-ALA-880-31.4/R32.6 | PLACE POLYESTER CONCRETE OVERLAY . | ALAMEDA COUNTY IN OAKLAND FROM BROADWAY UNDERCROSSING TO ADELINE STREET UNDERCROSSING | 09/20/2012 | 1 (09/20/2012) | Details CEM-3701 Report |
| 213210 | Project ID: 213210 DEA: 010G3604 EFIS: 0116000174 | 01-MEN,HUM-101-VAR | PLACE POLYESTER CONCRETE OVERLAY & METHACRYLATE DECK. | HUMBOLDT AND MENDOCINO COUNTIES AT VARIOUS LOCATIONS | 12/04/2019 | 1 (04/27/2018) | Details CEM-3701 Report |
| 211084 | Project ID: 211084 DEA: 030G0204 EFIS: 0314000026 | 03-BUT,COL,YUB-5,20,45,70,149-VAR | PLACE POLYESTER CONCRETE OVERLAY | IN BUTTE, COLUSA AND YUBA COUNTIES AT VARIOUS LOCATIONS | 10/28/2016 | 1 (01/20/2016) | Details CEM-3701 Report |
| 5133 | Project ID: 5133 DEA: 080P1304 | 08-SBD-15-142.2/171.5 | PLACE POLYESTER CONCRETE ON BRIDGES, REPAIR JOINT SEALS AND HMA PAVING | SAN BERNARDINO COUNTY NEAR BAKER AT VARIOUS LOCATIONS FROM HACK WASH BRIDGE TO BAILEY ROAD OVERCROSSING | 06/08/2012 | 1 (06/08/2012) | Details CEM-3701 Report |
| 213031 | Project ID: 213031 DEA: 101F9504 EFIS: 1017000049 | 10-SJ-5-Var | PLACE POLYESTER CONCRETE ON BRIDGE DECK, AND REPLACE JOINT SLABS. | SAN JOAQUIN COUNTY IN STOCKTON AT SMITH CANAL BRIDGE AND IN LATHROP AT ROUTE 5/120 SEPARATION OVERHEAD | 11/28/2018 | 1 (04/24/2018) | Details CEM-3701 Report |
| 215029 | Project ID: 215029 DEA: 120Q8504 EFIS: 1217000116 | 12-ORA-5-34.5/37.4 | PLACE POLYESTER CONCRETE ON 3 BRIDGES & REPLACE CONCRETE BARRIERS. | ORANGE COUNTY IN ORANGE AND ANAHEIM FROM 0.1 MILE NORTH OF SANTA ANA RIVER BRIDGE TO HARBOR BOULEVARD OVERCROSSING | 07/08/2022 | 1 (09/01/2020) | Details CEM-3701 Report |
| 1918 | Project ID: 1918 DEA: 041E4004 | 04-NAP,SOL-29,128-Var | PLACE POLYESTER CONCRETE AND TREAT BRIDGE DECK WITH METHACRYLATE. | NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS | 04/30/2012 | 1 (05/18/2012) | Details CEM-3701 Report |
| 1948 | Project ID: 1948 DEA: 041E7904 | 04-CC-680-Var | PLACE POLYESTER CONCRETE AND TREAT BRIDGE DECK WITH METHACRYLATE. | CONTRA COSTA COUNTY AT VARIOUS LOCATIONS | 06/18/2012 | 1 (05/09/2011) | Details CEM-3701 Report |
| 7439 | Project ID: 7439 DEA: 041E40A4 | 04-NAP-29- | PLACE POLYESTER CONCRETE AND TREAT BRIDGE DECK WITH METHACRYLATE. | NAPA AND SOLANO COUNTIES AT VARIOUS LOCATIONS | 02/01/2016 | 1 (05/18/2012) | Details CEM-3701 Report |
