Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7431-7440 of 18875 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001156 | Project ID: 1001156 DEA: 081L9104 EFIS: 0821000038 COOP: 081734 | 08-SBD-38-51.9 | State Highway 38 at Stanfield Cutoff Roundabout | Intersection of Stanfield Cutoff and State Highway 38 in the Big Bear area | 2 (04/07/2025) | Details CEM-3701 Report | |
| 1001356 | Project ID: 1001356 DEA: 07300204 EFIS: 0713000426 COOP: 074986 Permit Numbers: 0723NOP1845 | 07-VEN-126-13.25 | Widening improvements, additional lanes, curb ramps, curb and gutter, drainage, HMA overlay, restriping, signage, and traffic signal upgrades. | Intersection of SR126 and Hallock Drive, Santa Paula | 2 (06/25/2025) | Details CEM-3701 Report | |
| 209166 | Project ID: 209166 DEA: 041G4014 | 04-SCL-9-11.55 | Reconstruct Intersection; Upgrade Signal Poles | Intersection Of Sr 9 And University Ave. | 05/07/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 1011 | Project ID: 1011 DEA: 032E5204 EFIS: 0300000349 | 03-COL-20-30.09 | New signal, turn lanes, curb, gutter and sidewalk improvements, landcape and drainage improvement. | Intersection of Rte 20 and 45 ( 10th & Market Street) in the City of Colusa | 12/08/2017 | 1 (04/21/2010) | Details CEM-3701 Report |
| 3901 | Project ID: 3901 DEA: 071P8104 | 07-LA-5-5.405 | INSTALL WASH RACK | Intersection of routes 5 & 405 - maintenance yard. | 07/29/2010 | 1 (07/29/2010) | Details CEM-3701 Report |
| 211458 | Project ID: 211458 Permit Numbers: 04146MC2025 04166RT1715 | 04-SON-12-23.1/23.1 | Traffic signal and striping modifications for the intersection of State route 12 (SR 12)and Oakmont drive the City of Santa Rosa. | Intersection of Oakmont Dr. , Santa Rosa | 01/18/2019 | 1 (08/11/2016) | Details CEM-3701 Report |
| 210841 | Project ID: 210841 Permit Numbers: 0614NSN0388 0615NRT0134 | 06-FRE-99-20.164/20.164 | Enter upon the State Highway Right-of-way on northbound State Route 99 (FRE/99) in Fresno County at post mile 20.164 (Ventura Street) to set up, maintain, and remove temporary traffic control necessary to install the traffic signals, signs, loops and restriping. Work included, but not limited: ins | Intersection of N/B SR99 offramp & Ventura Ave, Fresno | 04/27/2018 | 1 (10/01/2015) | Details CEM-3701 Report |
| 209901 | Project ID: 209901 DEA: 050H7304 EFIS: 0500000082 COOP: 050274 | 05-SLO-101-25.5 - 26.3 | Construct Los Osos Valley Road Overcrossing, Widen San Luis Obispo Creek Bridge, Improve South Higuera Street/LOVR intersection, and Improve pedestrian and bicycle access | Intersection of Los Osos Valley Road and US Highway 101 | 04/06/2016 | 2 (09/11/2014) | Details CEM-3701 Report |
| 1001304 | Project ID: 1001304 Permit Numbers: 0424NCS0673 0425NRT1434 | 04-SCL-82-25.01 | Pedestrian and cycling safety improvements: Remove existing curb island and turn lane; Extend curb line; Create extended bulb-out; Create dedicated bike facilities; Install new traffic signal equipment; Create right turn lane. | Intersection of Churchill Ave at El Camino Real (Route 82) within Caltrans right-of-way; adjacent to Palo Alto High School as students cross El Camino Real to and from the adjacent Stanford campus. | NOT VERIFIED | Details CEM-3701 Report | |
| 5151 | Project ID: 5151 DEA: 080P7004 EFIS: 0800020021 | 08-RIV-215-42.63 | EMERGENCY REPAIR OF FAILING CLOSURE POUR | INTERSECTION OF 60, 91, AND 215 | 07/02/2012 | 1 (07/02/2012) | Details CEM-3701 Report |
