Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7401-7410 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7556 | Project ID: 7556 EFIS: 0000001155 Permit Numbers: 0712NSN0812 | 07-LA-2-3.351/3.351 | Install conduits,pullboxes & general traffic signal equipment Install stub-out & Advance Loops on Santa Monica Blvd Install new APS devices Replace all existing 8\\"³vehicle heads to 12\\"³ vehicle heads per LADOT design stdsInstall 17-3-100 standards with | Butler Avenue, Los Angeles | 07/31/2018 | 1 (12/12/2012) | Details CEM-3701 Report |
| 7557 | Project ID: 7557 EFIS: 0000001155 Permit Numbers: 0712NSN0813 | 07-LA-10-4.503/4.503 | Install conduits,pullboxes and general traffic signal equipment Install advanced loops Removal and Installation of striping | Centinela Avenue, Los Angeles | 08/01/2018 | 1 (01/25/2013) | Details CEM-3701 Report |
| 7558 | Project ID: 7558 EFIS: 0000001155 Permit Numbers: 0612NDP0384 | 06-KER-99-54.48/54.48 | Enter upon the State Highway Right-of-way on State Route 99 (SR-99) in Kern County in Delano at and near the Woollomes Avenue Overcrossing Interchange (PM 54.48) to set up, maintain, and remove temporary traffic control necessary in order to construct the | Woollomes Ave. Interchange, Delano | 07/30/2018 | 2 (12/29/2014) | Details CEM-3701 Report |
| 7559 | Project ID: 7559 DEA: 07224604 EFIS: 0700000360 | 07-LA-405-46.3/47.8 | Please Contact SMR (Bahjat Dagher) prior to performing QA Source Inspection for this projet. Thanks, BD | Please Contact SMR (Bahjat Dagher) prior to performing QA Source Inspection for this project. Thanks, BD | 09/18/2014 | 1 (05/01/2012) | Details CEM-3701 Report |
| 7560 | Project ID: 7560 DEA: 07260304 EFIS: 0700000487 | 07-LA-134,405-.9/2.9,46.3/47.8 | Please Contact SMR (Mohammad Fatemi) prior to performing QA Source Inspection for this projet. Thanks. | Please Contact SMR (Mohammad Fatemi) prior to performing QA Source Inspection for this project. Thanks. | 02/09/2015 | 1 (07/16/2012) | Details CEM-3701 Report |
| 7561 | Project ID: 7561 DEA: 010A3804 EFIS: 0100020313 | 01-HUM-255-0.2/1.8 | REHABILITATE BRIDGE | HUMBOLDT COUNTY IN AND NEAR EUREKA AT VARIOUS LOCATIONS FROM EUREKA CHANNEL BRIDGE TO SAMOA CHANNEL BRIDGE | 01/02/2015 | 1 (08/30/2012) | Details CEM-3701 Report |
| 7562 | Project ID: 7562 DEA: 010A5904 EFIS: 0100020320 | 01-MEN-1-42.5/44.4 | CLEAN AND PAINT BRIDGES | MENDOCINO COUNTY NEAR ALBION AT SALMON CREEK BRIDGE AND AT ALBION RIVER BRIDGE | 01/02/2015 | 1 (08/20/2012) | Details CEM-3701 Report |
| 7563 | Project ID: 7563 DEA: 013633U4 EFIS: 0112000238 | 01-HUM-101-79.9/87.8 | HMA OVERLAY AND RECONSTRUCT MBGR | IN AND NEAR EUREKA AND ARCATA FROM THE EUREKA SLOUGH BRIDGE TO ARCATA OVERHEAD | 01/02/2015 | 1 (09/17/2012) | Details CEM-3701 Report |
| 7564 | Project ID: 7564 DEA: 024E8204 | 02-LAS-395-T5.3/56.5 | INSTALL CENTERLINE RUMBLE STRIP AND STRIPING | LASSEN COUNTY AT AND NEAR DOYLE FROM 0.6 MILE NORTH OF ROUTE 70 TO 0.2 MILE NORTH OF SUNNYSIDE ROAD | 06/27/2013 | 1 (08/20/2012) | Details CEM-3701 Report |
| 7565 | Project ID: 7565 DEA: 040G1304 EFIS: 0400000311 | 04-SCL-82-20.9 | INSTALL SIGNAL AND LIGHTING, UPGRADE CURB RAMPS. | SANTA CLARA COUNTY IN MOUNTAIN VIEW AT CLARK AVENUE | 05/09/2014 | 1 (09/17/2012) | Details CEM-3701 Report |
