Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7391-7400 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1001541 | Project ID: 1001541 Permit Numbers: 04256CS0667 | 04-SF-101-6.05 | remove, replace curb and gutter | 04-SF-101A from 6.05 Miles to 6.05 Miles | NOT VERIFIED | Details CEM-3701 Report | |
| 210016 | Project ID: 210016 DEA: 05316001 EFIS: 0500000497 | 05-MON-156- | SR 156 West Corridor Project - P3. Convert 2-lane to 4-lane freeway from Castroville to 101/156 interchange on US-101. Replace 101/156 interchange with more extensive interchange. New interchange at Castroville Blvd and Rt 156. | 05-MON-156-PM R1.6/T5.2 ,? 05-MON-101-PM 94.6/96.8 | 1 (09/27/2019) | Details CEM-3701 Report | |
| 994521 | Project ID: 994521 DEA: 051N9204 EFIS: 0521000146 | 05-SB-VAR-var | Polyester concrete overlay, replace joint seals, deck seal. | 05-SB-101, 150, 154, 225-Var | 07/31/2024 | 1 (03/28/2023) | Details CEM-3701 Report |
| 1001741 | Project ID: 1001741 DEA: 061G9804 EFIS: 0624000180 MINOR: 06A3169 | 06-FRE-41,99,152,198-VAR | Repair/Replace Highway Advisory Radios and Roadside Weather Information Systems. | 06-Fre, Mad, Tul-41, 99, 152, 198-Var Fresno, Madera and Tulare Counties At Various Locations. | 1 (10/31/2025) | Details CEM-3701 Report | |
| 1002318 | Project ID: 1002318 DEA: 061H9404 EFIS: 0625000102 | 06-KER-33-0.0/14.5 | COLD PLANE AC PAVEMENT, PLACE RHMA-O AND HMA (TYPE A), ROADSIDE SIGNS AND STRIPING | 06-KER-33, PM 0.0/14.5, IN AND NEAR MARICOPA | 1 (06/19/2026) | Details CEM-3701 Report | |
| 994825 | Project ID: 994825 DEA: 070W3204 EFIS: 0721000258 | 07-LA-164-4.8/6.9 | CONSTRUCTION ON STATE HIGHWAY IN LOS ANGELES COUNTY FROM GARY AVENUE IN SOUTH EL MONTE TO RUDELL UNDERPASS IN TEMPLE CITY | 07-LA-164-4.8/6.9 | 01/11/2024 | 1 (07/24/2023) | Details CEM-3701 Report |
| 1002143 | Project ID: 1002143 DEA: 07363004 | 07-LA-101-17.1/25.5 | Modify and install TMS elements | 07-LA-2,101,105-Var | 1 (04/22/2026) | Details CEM-3701 Report | |
| 209217 | Project ID: 209217 DEA: 080F5404 EFIS: 0800000136 COOP: 081468 | 08-RIV-91,15-0.0/13.04, 35.64/45.14 | SR-91 Corridor Improvement Project: Develop approx. 8 miles of tolled express lanes and related improvements within SR 91 between the Riverside/Orange County line and I-15, including transition areas. | 08-RIV-91-0.0/13.04; 12-ORA-91-R14.43/R18.91; 08-RIV-15-35.64/45.14 | 09/20/2023 | 1 (08/07/2014) | Details CEM-3701 Report |
| 1002036 | Project ID: 1002036 DEA: 081P3704 EFIS: 0824000204 | 08-SBD-58-R0/R33 | Modifying fiber optic cable systems | 08-SBd-58, 395-Var | 1 (03/27/2026) | Details CEM-3701 Report | |
| 214812 | Project ID: 214812 DEA: 09375704 EFIS: 0918000073 | 09-MNO,MNO-,58,108,395- | Place structural concrete and polyester concrete overlay | 09-Ker,Mno-14, 58, 108, 395-VARIOUS | 03/12/2021 | 1 (07/27/2020) | Details CEM-3701 Report |
