Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7381-7390 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000018 | Project ID: 1000018 DEA: 042Q7604 EFIS: 0419000046 | 04-ALA-238,680-0.7/0.8,M0.1 | RECTANGULAR RAPID FLASHING BEACON SYSTEMS, HMA, CURB RAMP AND SW. | ALAMEDA COUNTY IN FREMONT ON ROUTE 680 AT OFF-RAMP TO SCOTT CREEK ROAD AND ON ROUTE 238 AT MISSION BRIDGE COURT | 1 (01/08/2024) | Details CEM-3701 Report | |
| 1000639 | Project ID: 1000639 DEA: 043Q8504 EFIS: 0419000272 | 04-ALA-84-10.8/18.0 | FLASHING BEACON SYSTEMS. | ALAMEDA COUNTY IN FREMONT, UNION CITY AND AT SUNOL FROM ROUTE 238 TO 0.1 MILE WEST OF ROUTE 680 | 1 (10/07/2024) | Details CEM-3701 Report | |
| 1849 | Project ID: 1849 DEA: 04174414 | 04-ALA-84-19.5/19.9,20.5/21.2 | REALIGN AND IMPROVE SIGHT DISTANCE. | ALAMEDA COUNTY IN FREMONT, UNION CITY AND AT SUNOL RIDGE FROM 0.2 KM SOUTH OF ROSEWARNES UNDERPASS TO 0.1 KM NORTH OF PALOMARES ROAD | 12/16/2011 | 1 (04/01/2011) | Details CEM-3701 Report |
| 212789 | Project ID: 212789 DEA: 044H5804 EFIS: 0413000162 | 04-ALA,-880-11.8/27.5.4 | ROADWAY SURFACING, PRECAST JOINT CONCRETE PAVEMENT AND ELECTRICALS | ALAMEDA COUNTY IN FREMONT, UNION CITY, HAYWARD, SAN LEANDRO AND OAKLAND FROM 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO HIGH STREET UNDERCROSSING | 01/13/2023 | 1 (03/26/2018) | Details CEM-3701 Report |
| 993584 | Project ID: 993584 DEA: 040Q4504 EFIS: 0418000101 | 04-ALA-92-6.5 | LANDSCAPE, ROCK SLOPE PROTECTION, CONCRETE BARRIER AND GUARD RAIL. | ALAMEDA COUNTY IN HAYWARD AT ROUTE 92/880 SEPARATION | 11/30/2023 | 1 (04/14/2022) | Details CEM-3701 Report |
| 209791 | Project ID: 209791 DEA: 042G3624 EFIS: 0413000221 | 04-ALA-92-R5.1/R5.8 | REPLACEMENT HIGHWAY PLANTING. | ALAMEDA COUNTY IN HAYWARD FROM 0.1 MILE WEST OF INDUSTRIAL BOULEVARD UNDERCROSSING TO HESPERIAN BOULEVARD OVERCROSSING | 07/06/2018 | 1 (11/26/2014) | Details CEM-3701 Report |
| 213927 | Project ID: 213927 DEA: 040Q9704 EFIS: 0418000177 | 04-ALA-92-R2.8/6.4 | COLD PLANE AC PAVEMENT AND PLACE HMA (A). | ALAMEDA COUNTY IN HAYWARD FROM 0.2 MILE EAST OF TOLL STATION TO 92/880 CONNECTOR | 10/21/2019 | NOT VERIFIED | Details CEM-3701 Report |
| 994570 | Project ID: 994570 DEA: 040Y2404 EFIS: 0422000259 | 04-ALA-92-R2.4/6.8 | COLD PLANE ASPHALT CONCRETE PAVEMENT AND PLACE HOT MIX ASPHALT. | ALAMEDA COUNTY IN HAYWARD FROM 0.2 MILE WEST OF SAN MATEO-HAYWARD TOLL PLAZA TO SANTA CLARA STREET | 01/10/2024 | 1 (04/10/2023) | Details CEM-3701 Report |
| 208614 | Project ID: 208614 DEA: 042G3614 EFIS: 0412000576 | 04-ALA-92,880-6.3/6.8,15.5/16.8 | REPLACEMENT HIGHWAY PLANTING. | ALAMEDA COUNTY IN HAYWARD ON ROUTE 92 FROM 0.2 MILE WEST OF ROUTE 92/880 SEPARATION TO SANTA CLARA STREET AND ON ROUTE 880 FROM 0.1 MILE SOUTH OF TENNYSON ROAD OVERCROSSING TO 0.2 MILE NORTH OF ROUTE 92/880 SEPARATION | 08/20/2018 | 1 (04/10/2013) | Details CEM-3701 Report |
| 2049 | Project ID: 2049 DEA: 042490A4 EFIS: 0400000700 | 04-ALA-238,880-R14.5/16.5,20.3/20.8 | PERFORM HIGHWAY PLANTING AND INSTALL IRRIGATION SYSTEM | ALAMEDA COUNTY IN HAYWARD SAN LEANDRO AND ASHLAND ON ROUTE 880 FROM THE LEWELLING BOULEVARD TO 0.1 MILE EAST OF THE WASHINGTON AVENUE AND ON ROUTE 238 FROM ROUTE 880/238 SEPARATION TO APPLE AVENUE | 07/17/2015 | 1 (10/04/2010) | Details CEM-3701 Report |
