Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7371-7380 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 4308 | Project ID: 4308 DEA: 073Y8504 | 07-LA-27-17.0/18.6 | Place rubberized hot mix asphalt (Gap Graded). | LOS ANGELES COUNTY IN LOS ANGELES FROM NORDHOFF STREET TO DEVONSHIRE STREET | 04/27/2011 | 1 (04/27/2011) | Details CEM-3701 Report |
| 7122 | Project ID: 7122 DEA: 042E6404 | 04-SON-121-R7.3/11.6 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SONOMA COUNTY FROM SONOMA CREEK TO NAPA COUNTY LINE | 08/15/2013 | 1 (04/02/2012) | Details CEM-3701 Report |
| 208771 | Project ID: 208771 DEA: 043E8204 EFIS: 0413000345 | 04-SON-121-R7.3/11.6 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SONOMA COUNTY NEAR SONOMA FROM SONOMA CREEK TO NAPA COUNTY LINE | 10/21/2014 | 1 (09/13/2013) | Details CEM-3701 Report |
| 210339 | Project ID: 210339 DEA: 043E3404 EFIS: 0412000297 | 04-MRN-1-17.0/19.0 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | MARIN COUNTY NEAR BOLINAS FROM 0.1 MILE SOUTH OF FAIRFAX BOLINAS ROAD TO 1.5 MILES NORTH OF HORSESHOE HILL ROAD | 09/07/2022 | 1 (09/18/2015) | Details CEM-3701 Report |
| 210389 | Project ID: 210389 DEA: 041J1504 EFIS: 0414000149 | 04-SON-121-0.0/R7.3 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SONOMA COUNTY NEAR SCHELLVILLE FROM ROUTE 37 TO SONOMA CREEK BRIDGE | 09/07/2022 | 1 (08/19/2019) | Details CEM-3701 Report |
| 215454 | Project ID: 215454 DEA: 051N0804 EFIS: 0520000123 | 05-SB-144-0.9/2.0 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | SANTA BARBARA COUNTY IN SANTA BARBARA FROM ALAMEDA PADRE SERRA TO ROUTE 192 | 11/15/2021 | 1 (03/12/2021) | Details CEM-3701 Report |
| 995443 | Project ID: 995443 DEA: 024J9104 EFIS: 0223000086 | 02-TRI-299-30.2/36.9 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED). | TRINITY COUNTY NEAR BIG FLAT FROM 0.6 MILE EAST OF SKUNK POINT CAMPGROUND TO NORTH FORK TRINITY RIVER BRIDGE | 11/27/2024 | 1 (11/27/2023) | Details CEM-3701 Report |
| 8223 | Project ID: 8223 DEA: 11275204 EFIS: 1100020349 | 11-IMP-98-21.8/31.3 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED), MBGR AND CURB RAMPS. | IMPERIAL COUNTY IN AND NEAR CALEXICO FROM 0.2 MILE WEST OF WESTSIDE MAIN CANAL BRIDGE TO KLOKE ROAD | 07/24/2014 | NOT VERIFIED | Details CEM-3701 Report |
| 3344 | Project ID: 3344 DEA: 060L7404 | 06-KER,TUL-65-6.1/25.2,0.0/11.8 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED) SURFACING. | KERN AND TULARE COUNTIES FROM 0.6 MILE SOUTH OF MERCED AVENUE TO AVENUE 95 | 12/13/2012 | 1 (01/12/2011) | Details CEM-3701 Report |
| 3319 | Project ID: 3319 DEA: 060L0804 | 06-KER-14,395-59.9/64.6;29.6/36.8 | PLACE RUBBERIZED HOT MIX ASPHALT (GAP GRADED) ON EXISTING PAVEMENT. | KERN COUNTY NEAR BRADYS FROM 0.7 MILE SOUTH OF NORTH JUNCTION ROUTE 178 TO INYO COUNTY LINE | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
