Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7361-7370 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209534 | Project ID: 209534 DEA: 044G4004 EFIS: 0412000449 | 04-ALA-13-13.2/13.7 | COLD PLANE ASPHALT CONCRETE AND PLACE HOT MIX ASPHALT. | ALAMEDA COUNTY IN BERKELEY FROM SAN PABLO AVENUE TO 0.1 MILE EAST OF BAY STREET OVERCROSSING | 03/04/2015 | 1 (04/17/2014) | Details CEM-3701 Report |
| 214224 | Project ID: 214224 DEA: 042G4824 EFIS: 0415000362 | 04-ALA-13-12.1/13.4 | MODIFY SIGNAL AND LIGHTING. | ALAMEDA COUNTY IN BERKELEY FROM SHATTUCK AVENUE TO 7TH STREET | 08/10/2021 | 1 (09/16/2019) | Details CEM-3701 Report |
| 211825 | Project ID: 211825 DEA: 042G4814 EFIS: 0415000361 | 04-ALA-13-12.1/13.4 | TO IMPROVE ADA/PEDESTRIAN RELATED FEATURES AND ACCESS BARRIERS | ALAMEDA COUNTY IN BERKELEY FROM SHATTUCK AVENUE TO 7TH STREET | 12/21/2017 | 1 (12/28/2016) | Details CEM-3701 Report |
| 214930 | Project ID: 214930 DEA: 043Q4304 EFIS: 0419000211 | 04-ALA-84-R0.7/R6.0 | COLD PLANE AC PAVEMENT AND PLACE RHMA-G. | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM DUMBARTON BRIDGE TO DECOTO ROAD SEPARATION | 11/18/2020 | 1 (07/07/2020) | Details CEM-3701 Report |
| 994226 | Project ID: 994226 DEA: 042K7004 EFIS: 0417000010 COOP: 042895 | 04-ALA-880-R0.0/11.8 | Cold plane pavement and overlay with RHMA-G/RHMA-O (CAPITAL PREVENTIVE MAINTENANCE) | ALAMEDA COUNTY IN FREMONT AND NEWARK FROM SANTA CLARA COUNTY LINE TO 0.4 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING | 1 (09/13/2022) | Details CEM-3701 Report | |
| 2336 | Project ID: 2336 DEA: 04447904 | 04-ALA-238-0.0/3.3,3.5/7.8 | ROADWAY TO BE REHABILITATED AND SIGNAL AND LIGHTING TO BE INSTALLED. | ALAMEDA COUNTY IN FREMONT AND UNION CITY FROM NORTH OF ROUTE 238/680 SEPARATION TO SOUTH JUNCTION ROUTE 84 AND FROM ALAMEDA CREEK BRIDGE TO BLANCHE STREET | 03/05/2012 | 1 (03/22/2012) | Details CEM-3701 Report |
| 213595 | Project ID: 213595 DEA: 044G8804 EFIS: 0413000058 | 04-ALA-880-10.7 | SEISMIC RETROFIT , REPLACE APPROACH SLABS AND EROSION CONTROL | ALAMEDA COUNTY IN FREMONT AT CRANDALL CREEK BRIDGE. | 05/08/2020 | 1 (01/28/2019) | Details CEM-3701 Report |
| 1738 | Project ID: 1738 DEA: 040G9604 | 04-ALA-238-5.2 | INSTALL TRAFFIC SIGNAL AND CONSTRUCT BUS CONCRETE PADS | ALAMEDA COUNTY IN FREMONT AT GURDWAR ROAD | 05/03/2012 | 1 (06/24/2011) | Details CEM-3701 Report |
| 994323 | Project ID: 994323 DEA: 040Q6804 EFIS: 0418000132 | 04-ALA-680-M2.1 | REPLACE EMBANKMENT SLOPE WITH ROCK SLOPE PROTECTION. | ALAMEDA COUNTY IN FREMONT AT MISSION BOULEVARD (680/262) SEPARATION | 10/09/2024 | 1 (10/14/2022) | Details CEM-3701 Report |
| 214462 | Project ID: 214462 DEA: 042J8104 EFIS: 0415000008 | 04-ALA-880-4.8/11.3 | PLACE LEAN CONCRETE BASE, HMA & RHMA AND ELECTRONIC TOLL SYSTEM. | ALAMEDA COUNTY IN FREMONT AT VARIOUS LOCATION FROM 0.1 MILE NORTH OF AUTO MALL PARKWAY OVERCROSSING TO 0.1 MILE SOUTH OF FREMONT BOULEVARD OVERCROSSING. | 01/21/2021 | 1 (10/21/2019) | Details CEM-3701 Report |
