Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7351-7360 of 19348 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 209093 | Project ID: 209093 DEA: 010C1004 EFIS: 0112000215 | 01-HUM-36-40.5/45.7 | PLACE RUBBERIZED SEAL COAT | HUMBOLDT COUNTY NEAR DINSMORE FROM VAN DUZEN RIVER BRIDGE 04-0129 TO TRINITY COUNTY LINE | 01/30/2015 | 1 (10/08/2013) | Details CEM-3701 Report |
| 211705 | Project ID: 211705 DEA: 024G3804 EFIS: 0214000006 | 02-TRI-299-0.0/8.3 | PLACE RUBBERIZED HOT MIX ASPHALT, GUARDRAIL, AND SOME DRAINAGE | TRINITY COUNTY AT AND NEAR SALYER FROM HUMBOLDT COUNTY LINE TO 0.6 MILE EAST OF GRAY CREEK ROAD | 01/02/2019 | 1 (10/25/2017) | Details CEM-3701 Report |
| 212930 | Project ID: 212930 DEA: 051H3804 EFIS: 0516000067 | 05-MON-68-R4.0/10.8 | PLACE RUBBERIZED HOT MIX ASPHALT, BONDED WEARING COURSE. | MONTEREY COUNTY IN AND NEAR MONTEREY FROM ROUTE 1/68 SEPARATION TO 0.1 MILE WEST OF SPCA ROAD | 03/26/2020 | 1 (09/06/2019) | Details CEM-3701 Report |
| 3302 | Project ID: 3302 DEA: 060K6604 | 06-KER-14-37.1,46.2 | PLACE RUBBERIZED HOT MIX ASPHALT SURFACING AND SEAL COAT SURFACING | 04/21/2011 | 1 (05/27/2009) | Details CEM-3701 Report | |
| 3366 | Project ID: 3366 DEA: 060M6404 | 06-KIN-33-12.0/18.9 | PLACE RUBBERIZED HOT MIX ASPHALT ON THE EXISTING PAVEMENT. | KINGS COUNTY IN AND NEAR AVENAL FROM 0.3 MILE NORTH OF UTICA AVENUE TO FRESNO COUNTY LINE | 12/13/2012 | 1 (04/04/2011) | Details CEM-3701 Report |
| 67 | Project ID: 67 DEA: 01398504 | 01-LAK-29-20.4/R34.4 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING SURFACING | 11/10/2010 | 1 (11/13/2008) | Details CEM-3701 Report | |
| 3207 | Project ID: 3207 DEA: 060H2504 | 06-KER-178-13.7/16.0,20.0/27.2 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD | 03/09/2012 | 1 (04/27/2011) | Details CEM-3701 Report |
| 3321 | Project ID: 3321 DEA: 060L1004 | 06-KIN,TUL-43,63,198-VAR | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KINGS AND TULARE COUNTIES AT VARIOUS LOCATIONS | 12/13/2012 | 1 (04/18/2011) | Details CEM-3701 Report |
| 3326 | Project ID: 3326 DEA: 060L1504 | 06-KER-33,58-63.0/68.8,15.4/21.7 | Place rubberized hot mix asphalt on existing pavement. | KERN COUNTY NEAR DEVILS DEN ON ROUTE 33 FROM 2.9 MILES NORTH OF ROUTE 46 TO 0.4 MILE SOUTH OF TWISSELMAN ROAD AND NEAR MCKITTRICK ON ROUTE 58 FROM ROUTE 33 TO 1.3 MILES WEST OF CALIFORNIA AQUEDUCT | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 3450 | Project ID: 3450 DEA: 06446704 | 06-TUL-216-2.9/11.7 | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | TULARE COUNTY IN AND NEAR VISALIA FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 344 | 12/13/2012 | 1 (10/11/2010) | Details CEM-3701 Report |
