Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7331-7340 of 18775 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
7475Project ID: 7475
DEA: 04445604
EFIS: 0400001081
COOP: 042434
Permit Numbers: 0412NMC0872 0412NDP1643
04-SCL-280-5.1/5.2,0.0/0.8The work to be performed within STATE highway right-of-way includes the following:-Modify the existing I-880/Stevens creek blvd interchange from full clover to partial clover and diamond configuration, removing existing loop ramps and re-aligning, wideningIn San Jose on Rte 280 from west of Patton Ave to 0.1 mile east of Rte 280/880 Separation on Rte 880 from, Rte 280/880 Separation to Forest Ave Undercrossing05/07/20192 (12/11/2012)Details CEM-3701 Report
7477Project ID: 7477
DEA: 071W0404
EFIS: 0700020905
MINOR: 07A3180
07-LA-60-11.5/20.1Plant EstablishmentIN LOS ANGELES COUNTY AND IN THE CITY OF INDUSTRY ON ROUTE 60 FROM 0.2 MILES EAST OF THE 605/60 SEPARATION TO 0.2 MILES WEST OF NOGALES St ESTABLISH EXISTING PLANTING08/17/20212 (07/09/2021)Details CEM-3701 Report
7478Project ID: 7478
DEA: 04246584
04-CC-4-State route 4 bypass in cities of Antioch and Brentwood from 0.5 N of lone tree way to 0.3 mile north of sand creek 08/18/20222 (12/01/2012)Details CEM-3701 Report
7479Project ID: 7479
DEA: 051C5804
EFIS: 0512000178
05---  08/27/2019NOT VERIFIEDDetails CEM-3701 Report
7480Project ID: 7480
DEA: 024F5004
EFIS: 0212000171
02-SIS-5-44.31Reconstruct 2 span ( NB traffic lanes) , place polyester concrete overlay on bridge deck, remove crossoverNear Yreka at Walters Road Overcrossing08/17/20121 (06/06/2012)Details CEM-3701 Report
7481Project ID: 7481
DEA: 120M2004
EFIS: 1200020329
12-ORA-57-  09/09/2016NOT VERIFIEDDetails CEM-3701 Report
7483Project ID: 7483
DEA: 11383504
EFIS: 1100020379
MINOR: 11A2004
11-SD-163-1.2/2.4Plant Trees and Modify IrrigationIN SAN DIEGO COUNTY, IN SAN DIEGO, FROM ABOUT 0.2 MILE WEST OF LAUREL STREET TO ABOUT 0.1 MILE WEST OF ROBINSON AVE OC 1 (11/01/2010)Details CEM-3701 Report
7484Project ID: 7484
DEA: 073P4904
EFIS: 0700021209
07-LA-1-20.7/21.7Installation of Countdown Pedestrian SignalsLA County 1 (12/14/2012)Details CEM-3701 Report
7486Project ID: 7486
DEA: 010C3004
EFIS: 0112000247
01-HUN-96-27.0Repair Slip out1.1 miles west of Aiken Creek Bridge #4-5912/05/20141 (07/02/2012)Details CEM-3701 Report
7487Project ID: 7487
DEA: 01492304
EFIS: 0100000469
MINOR: 01A1317
01-HUM-255-Install Speed Radar DisplayAt Two Locations near the community of Manila01/02/20151 (01/23/2013)Details CEM-3701 Report