Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7331-7340 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 208643 | Project ID: 208643 DEA: 09354704 EFIS: 0912000048 | 09-INY-190-40.0/57.9 | PLACE HOT MIX ASPHALT OVERLAY ON EXISTING PAVEMENT. | INYO COUNTY AT AND NEAR PANAMINT SPRINGS FROM 1.6 MILES WEST OF SALINE VALLEY ROAD TO PANAMINT VALLEY ROAD | 11/15/2013 | 1 (07/24/2013) | Details CEM-3701 Report |
| 213609 | Project ID: 213609 DEA: 09365904 EFIS: 0915000042 | 09-INY-136,395-0.0/0.1,54.6/57.4 | COLD PLANE AND PLACE HOT MIX ASPHALT AND INSTALL ROADSIDE SIGNS. | INYO COUNTY AT AND NEAR LONE PINE ON ROUTE 136 AT ROUTE 395 AND ON ROUTE 395 FROM 1.2 MILES SOUTH OF ROUTE 136 TO EAST INYO STREET | 12/02/2019 | 1 (01/03/2019) | Details CEM-3701 Report |
| 1001372 | Project ID: 1001372 DEA: 09374504 EFIS: 0918000017 | 09-INY-395-56.8/57.4,57.9/R58.3 | CONSTRUCT SIDEWALK, CURB RAMPS, AND DRAINAGE. | INYO COUNTY AT AND NEAR LONE PINE FROM TEYA ROAD TO EAST INYO STREET AND FROM BEGOLE STREET TO EAST LUBKEN AVENUE | 1 (08/06/2025) | Details CEM-3701 Report | |
| 215637 | Project ID: 215637 DEA: 09387804 EFIS: 0921000002 | 09-INY-395-R6.4/R15.0,115.2/116.1 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | INYO COUNTY AT AND NEAR LITTLE LAKE FROM 6.6 MILES SOUTH TO 2.0 MILES NORTH OF CINDER ROAD AND IN BISHOP FROM SOUTH STREET TO MACIVER STREET | 08/30/2022 | 1 (06/23/2021) | Details CEM-3701 Report |
| 214694 | Project ID: 214694 DEA: 09380604 EFIS: 0919000055 | 09-INY-136,190-7.0/17.7,24.6/24.8 | COLD IN-PLACE RECYCLING AND HOT MIX ASPHALT OVERLAY. | INYO COUNTY AT AND NEAR KEELER ON ROUTE 136 FROM 0.8 MILE WEST OF DOLOMITE LOOP ROAD EAST TO ROUTE 190 AND ON ROUTE 190 FROM ROUTE 136 TO 0.3 MILE EAST OF ROUTE 136 | 12/04/2020 | 1 (12/04/2020) | Details CEM-3701 Report |
| 1001669 | Project ID: 1001669 DEA: 09379004 | 09-INY-395-R65.0/76.0 | FULL DEPTH RECYCLING, COLD PLANE, HMA AND CURB RAMPS. | INYO COUNTY AT AND NEAR INDEPENDENCE FROM 3 MILES SOUTH OF MANZANAR REWARD ROAD TO 0.3 MILE NORTH OF SHABBELL LANE | 1 (10/13/2025) | Details CEM-3701 Report | |
| 1000682 | Project ID: 1000682 DEA: 09379104 EFIS: 0919000005 | 09-INY-395-91.6/100.8 | CONSTRUCT HMA, CURB RAMPS, AND ELECTRICAL SYSTEMS. | INYO COUNTY AT AND NEAR BIG PINE FROM 0.1 MILE SOUTH OF ELNA ROAD TO SOUTH JUNCTION ROUTE 168 | 1 (01/13/2025) | Details CEM-3701 Report | |
| 1000182 | Project ID: 1000182 DEA: 09396404 EFIS: 0923000025 | 09-INY-168-34.2/36.6 | CONSTRUCT MINOR CONCRETE SLOPE PROTECTION. | INYO COUNTY ABOUT 9 MILES WEST OF DEEP SPRINGS AT VARIOUS LOCATIONS FROM 2.7 MILES EAST TO 5.1 MILES EAST OF WHITE MOUNTAIN ROAD | 08/29/2024 | 1 (03/20/2024) | Details CEM-3701 Report |
| 1000165 | Project ID: 1000165 DEA: 09392504 EFIS: 0923000029 | 09-INY-395-R17.2/25.8 | HOT MIX ASPHALT (TYPE A), SHOULDER BACKING, & STRIPING. | INYO COUNTY ABOUT 9 MILES SOUTH OF OLANCHA FROM 0.8 MILE SOUTH OF SYKES ROAD TO 0.3 MILE NORTH OF HAIWEE CANYON ROAD | 12/02/2024 | 1 (03/18/2024) | Details CEM-3701 Report |
| 211264 | Project ID: 211264 DEA: 09361304 EFIS: 0915000050 | 09-INY-395-R122.3/R129.5 | CONSTRUCT RUBBERIZED HOT MIX ASPHALT OVERLAY. | INYO COUNTY ABOUT 9 MILES NORTH OF BISHOP FROM 0.3 MILE SOUTH OF PLEASANT VALLEY DAM ROAD TO MONO COUNTY LINE | 08/08/2018 | 1 (09/21/2016) | Details CEM-3701 Report |
