Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7311-7320 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 7454 | Project ID: 7454 EFIS: 0000001155 Permit Numbers: 08126DP0403 | 08-RIV-10-54.52/54.93 | Enter onto Interstate 10 right-of-way at Monroe Street Interchange in the City of Indio, to widen all four ramps, widen Monroe Street, construct a drainage system, install new traffic signals and pavement markings , remove/relocate signs and street light | Monroe Street, Indio | 01/21/2013 | 2 (01/21/2013) | Details CEM-3701 Report |
| 7455 | Project ID: 7455 DEA: 01296124 EFIS: 0100020394 | 01-HUM-299-R4.2 | FISH PASSAGE MITIGATION. | HUMBOLDT COUNTY NEAR BLUE LAKE AT MILL CREEK BRIDGE | 01/02/2015 | 1 (07/09/2012) | Details CEM-3701 Report |
| 7456 | Project ID: 7456 DEA: 022C1124 EFIS: 0200000163 | 02-TEH-99-14.1 | REPLACE BRIDGE AND INSTALL ROCK SLOPE PROTECTION. | TEHAMA COUNTY NEAR LOS MOLINOS AT NORTH FORK MILL CREEK BRIDGE | 12/19/2014 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7457 | Project ID: 7457 DEA: 022E5104 EFIS: 0200000216 | 02-SHA-299-4.3/5.5 | CURVE IMPROVEMENT WITH HMA OVER AB. | SHASTA COUNTY ABOUT 17.3 MILES WEST OF REDDING FROM 4.3 TO 5.5 MILES EAST OF TRINITY COUNTY LINE | 12/21/2020 | 1 (10/01/2012) | Details CEM-3701 Report |
| 7458 | Project ID: 7458 DEA: 023C9204 EFIS: 0200000345 | 02-SIS-5-R50.6/R52.1 | REPLACE BRIDGE DECK | SISKIYOU COUNTY NEAR YREKA FROM 0.6 MILE SOUTH OF SHASTA RIVER BRIDGES TO 0.2 MILE SOUTH OF VISTA POINT | 04/06/2016 | 1 (08/06/2012) | Details CEM-3701 Report |
| 7459 | Project ID: 7459 DEA: 034E9904 EFIS: 0300000732 | 03-BUT-99-25.9/26.2 | INSTALL TRAFFIC SIGNAL, COLD PLANE AC PAVEMENT, PLACE HMA. | BUTTE COUNTY NEAR CHICO FROM 0.1 MILE SOUTH OF NEAL ROAD TO 0.2 MILE NORTH OF NEAL ROAD | 12/17/2012 | 1 (08/28/2012) | Details CEM-3701 Report |
| 7460 | Project ID: 7460 DEA: 04153004 EFIS: 0400020302 | 04-ALA-92,880-Var | WIDEN RAMPS, CONSTRUCT RETAINING WALLS, AND INSTALL RAMP METERING. | ALAMEDA COUNTY AT VARIOUS LOCATIONS | 08/20/2018 | 1 (07/30/2012) | Details CEM-3701 Report |
| 7461 | Project ID: 7461 DEA: 04153504 EFIS: 0400020739 COOP: 042533A1 | 04-SOL-80-0.0/R28.4 | INSTALL RAMP METERING, TOS, MBGR, SIGN STRUCTURES, WIDEN RAMP... | SOLANO COUNTY IN VALLEJO, FAIRFIELD AND VACAVILLE FROM THE CONTRA COSTA COUNTY LINE TO ROUTE 505 | 06/29/2015 | 1 (11/29/2012) | Details CEM-3701 Report |
| 7462 | Project ID: 7462 DEA: 041G2004 EFIS: 0400002017 | 04-ALA-880-4.5/4.9 | RESURFACING WITH HOT MIX ASPHALT (OPEN-GRADED) | ALAMEDA COUNTY IN FREMONT FROM 0.5 MILE NORTH OF FREMONT BOULEVARD OVERCROSSING TO 0.3 MILE NORTH OF AUTO MALL PARKWAY OVERCROSSING | 08/16/2013 | 1 (09/06/2012) | Details CEM-3701 Report |
| 7463 | Project ID: 7463 DEA: 042640U4 EFIS: 0412000195 | 04-SON-101-0.9/3.6 | CONSTRUCT PETALUMA BLVD SOUTH INTERCHANGE, REPLACE PETALUMA RIVER BR | SONOMA COUNTY IN AND NEAR PETALUMA FROM GUNN DRIVE TO ROUTE 101/116 SEPARATION AND OVERHEAD | 06/03/2020 | 1 (09/11/2012) | Details CEM-3701 Report |
