Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7301-7310 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 993303 | Project ID: 993303 DEA: 09381504 EFIS: 0919000063 | 09-INY-168-32.7/36.5 | PLACE GABIONS, ROADWAY EXCAVATION, AND MINOR CONCRETE. | INYO COUNTY NEAR BIG PINE FROM 1.3 MILES EAST OF WHITE MOUNTAIN ROAD TO 5.1 MILES EAST OF WHITE MOUNTAIN ROAD. | 07/27/2022 | 1 (10/27/2021) | Details CEM-3701 Report |
| 993650 | Project ID: 993650 DEA: 09388604 EFIS: 0921000036 | 09-INY-395-102.4/113.0 | COLD PLANE AC PAVEMENT AND PLACE HMA (TYPE A). | INYO COUNTY NEAR BIG PINE FROM 0.2 MILE NORTH OF REYNOLDS ROAD TO 0.1 MILE NORTH OF WARM SPRINGS ROAD | 01/30/2023 | 1 (03/28/2022) | Details CEM-3701 Report |
| 5461 | Project ID: 5461 DEA: 09347504 | 09-INY-190-57.9/R63.7,R66.5/68.5 | PLACE HOT MIX ASPHALT (OPEN GRADED) ON EXISTING PAVEMENT. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK FROM PANAMINT VALLEY ROAD TO 5.8 MILES EAST OF PANAMINT VALLEY ROAD AND FROM 8.4 MILES EAST OF PANAMINT VALLEY ROAD TO 10.6 MILES EAST OF PANAMINT VALLEY ROAD | 09/06/2011 | 1 (01/05/2012) | Details CEM-3701 Report |
| 5409 | Project ID: 5409 DEA: 09338404 | 09-INY-190-68.9 | Shoulder widening for brake check area. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK AT TOWNE PASS | 12/20/2010 | 1 (12/20/2010) | Details CEM-3701 Report |
| 5392 | Project ID: 5392 DEA: 09333804 COOP: 090510 | 09-INY-190-47.4 | Pave and improve an intersection, access road and parking area. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK AT PADRE POINT ROAD | 06/13/2011 | 1 (03/22/2010) | Details CEM-3701 Report |
| 6848 | Project ID: 6848 DEA: 09348004 EFIS: 0900020095 | 09-INY-190-96.8/111.6 | HOT MIX ASPHALT OVERLAY. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK AT AND NEAR FURNACE CREEK FROM 3.6 MILES EAST OF NORTH HIGHWAY TO 0.1 MILE WEST OF BADWATER ROAD | 03/21/2013 | 1 (03/15/2012) | Details CEM-3701 Report |
| 7397 | Project ID: 7397 DEA: 09287504 EFIS: 0900000045 | 09-INY-190-R65.9/R66.5 | CONSTRUCT ROADWAY REALIGNMENT. | INYO COUNTY IN DEATH VALLEY NATIONAL PARK ABOUT 11 MILES EAST OF PANAMINT SPRINGS FROM 8.0 TO 8.6 MILES EAST OF PANAMINT VALLEY ROAD | 11/21/2013 | 1 (07/16/2012) | Details CEM-3701 Report |
| 212692 | Project ID: 212692 DEA: 09352104 EFIS: 0900020090 | 09-INY-168,395-17.5/18.3,114.9/116.4 | CONSTRUCT CONCRETE SIDEWALKS, CURB RAMPS AND DRIVEWAYS. | INYO COUNTY IN BISHOP ON ROUTE 168 FROM 0.1 MILE WEST OF PIONEER LANE TO ROUTE 395 AND ON ROUTE 395 FROM 0.1 MILE SOUTH OF JAY STREET TO 0.4 MILE NORTH OF MAC IVER STREET | 06/23/2021 | 1 (05/03/2018) | Details CEM-3701 Report |
| 1001360 | Project ID: 1001360 DEA: 09374804 EFIS: 0918000020 | 09-INY-395-115.0 | BUILDING WORK AND PLACE HMA (TYPE A). | INYO COUNTY IN BISHOP AT THE DISTRICT OFFICE AT 500 SOUTH MAIN STREET | 1 (07/09/2025) | Details CEM-3701 Report | |
| 1001441 | Project ID: 1001441 DEA: 09398604 EFIS: 0923000036 | 09-INY-395-115.0 | REPLACE WATER LINE. | INYO COUNTY IN BISHOP AT THE DISTRICT OFFICE AT 500 SOUTH MAIN STREET | 1 (08/06/2025) | Details CEM-3701 Report |
