Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7291-7300 of 18875 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
67Project ID: 67
DEA: 01398504
01-LAK-29-20.4/R34.4PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING SURFACING 11/10/20101 (11/13/2008)Details CEM-3701 Report
3207Project ID: 3207
DEA: 060H2504
06-KER-178-13.7/16.0,20.0/27.2PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT.KERN COUNTY NEAR BAKERSFIELD FROM SIDEHILL VIADUCT TO 0.8 MILE EAST OF EDISON POWERHOUSE AND FROM 0.1 MILE WEST OF UPPER RICHBAR CAMPGROUND TO 0.5 MILE EAST OF DEMOCRAT SPRINGS ROAD03/09/20121 (04/27/2011)Details CEM-3701 Report
3321Project ID: 3321
DEA: 060L1004
06-KIN,TUL-43,63,198-VARPLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT.KINGS AND TULARE COUNTIES AT VARIOUS LOCATIONS12/13/20121 (04/18/2011)Details CEM-3701 Report
3326Project ID: 3326
DEA: 060L1504
06-KER-33,58-63.0/68.8,15.4/21.7Place rubberized hot mix asphalt on existing pavement.KERN COUNTY NEAR DEVILS DEN ON ROUTE 33 FROM 2.9 MILES NORTH OF ROUTE 46 TO 0.4 MILE SOUTH OF TWISSELMAN ROAD AND NEAR MCKITTRICK ON ROUTE 58 FROM ROUTE 33 TO 1.3 MILES WEST OF CALIFORNIA AQUEDUCT11/04/20111 (11/04/2011)Details CEM-3701 Report
3450Project ID: 3450
DEA: 06446704
06-TUL-216-2.9/11.7PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT.TULARE COUNTY IN AND NEAR VISALIA FROM 0.4 MILE EAST OF MCAULIFF STREET TO AVENUE 34412/13/20121 (10/11/2010)Details CEM-3701 Report
3322Project ID: 3322
DEA: 060L1104
06-KER-46,49-43.0/49.0, R31.1/33.0Place Rubberized Hot Mix Asphalt Concrete On Existing Pavement. 07/28/20111 (11/04/2011)Details CEM-3701 Report
214080Project ID: 214080
DEA: 031G2904
EFIS: 0318000111
03-SIE,YUB-49-0.0/4.6,6.4/9.4PLACE RUBBERIZED HOT MIX ASPHALT BONDED WEARING COURSE OVERLAY.YUBA AND SIERRA COUNTIES FROM 1.0 MILE NORTH OF CAMPTOWNVILLE ROAD TO FIDDLE CREEK BRIDGE05/05/20201 (04/29/2019)Details CEM-3701 Report
213198Project ID: 213198
DEA: 101G8004
EFIS: 1017000087
10-TUO-49-0.0/R6.4,18.8/R27.5PLACE RUBBERIZED HOT MIX ASPHALT AND REPAIR FAILED AREAS.TUOLUMNE COUNTY AT AND NEAR MOCCASIN FROM MARIPOSA COUNTY LINE TO ROUTE 120 AND IN AND NEAR SONORA FROM 0.1 MILE NORTH OF PESCE WAY TO CALVAERAS COUNTY LINE01/10/20191 (12/20/2018)Details CEM-3701 Report
5006Project ID: 5006
DEA: 080K6504
08-RIV-86-0.0/2.4PLACE RUBBERIZED HOT MIX ASPHALT AND GRIND EXISTING CONCRETE PAVEMENT 07/29/20101 (07/29/2010)Details CEM-3701 Report
5402Project ID: 5402
DEA: 09336704
09-MNO-120,158,395-50.7PLACE RUBBERIZED HOT MIX ASPHALT @ VARIOUS LOCATIONSIN MONO COUNTY IN AND NEAR JUNE LAKE AT VARIOUS LOCATIONS07/29/20101 (07/29/2010)Details CEM-3701 Report