Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7221-7230 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 212681 | Project ID: 212681 DEA: 024G2404 EFIS: 0213000095 | 02-SIS-5-R25.2 | STRENGTHEN AND UPGRADE BRIDGES. | SISKIYOU COUNTY ABOUT 5 MILES NORTH OF WEED AT THE NORTH EDGEWOOD OVERHEAD | 10/05/2021 | 1 (03/21/2018) | Details CEM-3701 Report |
| 212680 | Project ID: 212680 DEA: 024F5504 EFIS: 0213000005 | 02-SIS-89-20.9 - 21.2 | BRIDGE REPLACEMENT WITH PRE-CAST I-GIRDER AND RECONSTRUCT HIGHWAY | SISKIYOU COUNTY NEAR MCCLOUD FROM 0.2 MILE SOUTH TO 0.2 MILE NORTH OF MUD CREEK BRIDGE | 05/15/2019 | 1 (02/12/2018) | Details CEM-3701 Report |
| 212679 | Project ID: 212679 DEA: 023E7204 EFIS: 0200020154 | 02-TEH-36-42.1/46.0 | COLD PLANING, PAVING, MINOR CONCRETE, ELECTRICAL AND STRIPING WORK. | TEHAMA COUNTY IN AND NEAR RED BLUFF FROM EAST SAND SLOUGH BRIDGE TO 0.6 MILE EAST OF STICE ROAD | 08/07/2019 | 1 (05/24/2018) | Details CEM-3701 Report |
| 212678 | Project ID: 212678 DEA: 010E8404 EFIS: 0115000036 | 01-HUM-283-0.12 | CLEAN & PAINT STEEL BRIDGE AND REHAB BRIDGE DECK. | HUMBOLDT COUNTY IN AND NEAR SCOTIA AND RIO DELL AT EEL RIVER BRIDGE AND OVERHEAD | 11/27/2018 | 1 (10/03/2017) | Details CEM-3701 Report |
| 212677 | Project ID: 212677 DEA: 010C4304 EFIS: 0112000293 | 01-MEN-101,20,128-45.8, R41.8, 38.8 | BRIDGE SCOUR MITIGATION. | MENDOCINO COUNTY AT VARIOUS LOCATIONS | 12/04/2018 | 1 (10/03/2017) | Details CEM-3701 Report |
| 212675 | Project ID: 212675 Permit Numbers: 0516NRW0350 | 05--- | 09/06/2019 | NOT VERIFIED | Details CEM-3701 Report | ||
| 212674 | Project ID: 212674 DEA: 044H3104 EFIS: 0413000207 Permit Numbers: 0417NOP1833 0417NDP2004 | 04-SM-101-0.47/0.47 | Overcrossing Structure with pier in median, reconfigured median barrier, and relocated overhead sign structure. | route 101, East Palo Alto | 07/19/2019 | 2 (12/11/2017) | Details CEM-3701 Report |
| 212673 | Project ID: 212673 DEA: 024E5704 EFIS: 0200020325 | 02--- | Roadway Rehab | 03/26/2021 | 1 (08/30/2017) | Details CEM-3701 Report | |
| 212672 | Project ID: 212672 DEA: 074T8104 Permit Numbers: 0717AMC0734 0717ADP2152 0717ARW1362 0718ART0004 | 07---49.5 | Remove and replace curb ramps, widen existing PCC sidewalk, replace and match full depth AC. Thermoplastic striping, pavement markings, install roadside signs, install traffic signal equipment, install pedestrian countdown, audible, ad blank-out signals, install & re-route conduits & condu | Towne Ave/Route 210, Claremont | 11/30/00-1 | 1 (09/19/2017) | Details CEM-3701 Report |
| 212671 | Project ID: 212671 MINOR: 01A1757 | 01-DN-101,169-0.00-R3.77,R125.73,R137.14 | 08/12/2021 | 1 (08/24/2018) | Details CEM-3701 Report |
