Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7161-7170 of 18878 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214143 | Project ID: 214143 Permit Numbers: 04166UT0590 04176RT1690 | 04---6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 1 (08/28/2019) | Details CEM-3701 Report |
| 214155 | Project ID: 214155 Permit Numbers: 04166UT0590 04176RT1690 | 04---6.9/6.9 | Underground joint trench with power poles at intersection of highway 152 (Hecker Pass Road)and Autumn Road. | 2370 Hecker pass, Gilroy | 11/30/00-1 | 1 (08/28/2019) | Details CEM-3701 Report |
| 993455 | Project ID: 993455 Permit Numbers: 05206MC0796 05216RT0770 | 05---67.93/-1 | Install a Traffic Monitoring Station on the shoulder, including loops in the NB and SB travel way | 24200 Cabrillo Highway , Monterey | 1 (05/09/2024) | Details CEM-3701 Report | |
| 208631 | Project ID: 208631 DEA: 050R3304 EFIS: 0500020277 | 05-SLO-166-39.9/40.3 | Remove Bridge/Realign ( New Bridge) | 25 miles west of New Cuy Ama | 12/23/2024 | 1 (11/11/2019) | Details CEM-3701 Report |
| 8162 | Project ID: 8162 Permit Numbers: 0410NMC1327 | 04-NAP-121- | Widen the highway, install left turn pocket, signing and striping. | 250 Silverado Trail at Soscol in Napa | 09/14/2018 | 1 (12/19/2012) | Details CEM-3701 Report |
| 213130 | Project ID: 213130 Permit Numbers: 12156MC0454 | 12-ORA-90-6.3/6.3 | PERFORM THE FOLLOWING WORK WITHIN THE STATE RIGHT OF WAY ON IMPERIAL HWY. AT KRAEMER BLVD. IN THE CITY OF BREA.1. REMOVE AND REPLACE SIX EXISTING TRAFFIC SIGNAL POLES WITH NEW POLES AND MAST ARMS TO ALLOW A DUAL LEFT TURN FROM SHOPPING CENTER TO WB SR-90.2. SIGNING AND STRIPING IMPROVEMENTS TO NORT | 2500 IMPERIAL HWY, BREA | 08/24/2021 | 1 (02/14/2018) | Details CEM-3701 Report |
| 1000924 | Project ID: 1000924 DEA: 071Q4804 EFIS: 0723000058 | 07-LA-60-29.5 | LA-60 REHABILITATEEXISTING DRAINAGE SYSTEM AND CONNECT | 2533 S Garey Ave. | 1 (01/21/2025) | Details CEM-3701 Report | |
| 212409 | Project ID: 212409 Permit Numbers: 07146CD0591 07176RT2475 | 07-LA-60-7.7/7.7 | modifying traffic signal, installing curb and gutter, a curb ramp, and pavement delineations, and performing associated traffic control activities on Paramount Blvd at Route 60, in the city of Monterey Park | 2550 Greenwood Ave, Monterey Park | 06/16/2021 | 1 (08/01/2017) | Details CEM-3701 Report |
| 208888 | Project ID: 208888 Permit Numbers: 12126MC0365 | 12-ORA-73-11.417/11.417 | Perform the following work at 25600 Rancho Niguel Road in Caltrans R/W on Crown Valley Pkwy at SR-73 in the City of Laguna Niguel: REMOVE EXISTING HEADWALL, APPROX. 11 FEET OF CONCRETE GUTTER AND CONSTRUCT APPROX. 20 LINEAR FEET OF 15" RCP. All performed w | 2600 RANCHO NIGUEL RD, LAGUNA NIGUEL | 09/08/2016 | 1 (05/22/2013) | Details CEM-3701 Report |
| 211185 | Project ID: 211185 Permit Numbers: 04156DP0887 04146CS0327 04156RW2568 04156RT2624 | 04-SCL-82-13.1/13.1 | The off-site improvements include the removal and replacement of the sidewalk,curb,gutter,and driveway. | 2611- 2655 El Camino Real, Santa Clara | 01/18/2019 | 1 (02/01/2016) | Details CEM-3701 Report |
