Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7151-7160 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3369 | Project ID: 3369 DEA: 060M6804 | 06-KER-5-R15.9/42.8,52.8/62.6 | PLACING HOT MIX ASPHALT (BWC-GAP GRADED) ON EXISTING PAVEMENT | KERN COUNTY IN AND NEAR BUTTONWILLOW FROM ROUTE 5/99 SEPARATION TO 0.1 MILE SOUTH OF KERN RIVER UTILITY ROAD OVERCROSSING AND FROM 0.6 MILE NORTH OF ROUTE 5/58 SEPARATION TO LERDO AVENUE OVERCROSSING | 07/19/2012 | 1 (05/02/2011) | Details CEM-3701 Report |
| 1000012 | Project ID: 1000012 DEA: 061G4004 EFIS: 0623000194 | 06-KER-58-23.7/31.7 | TRAFFIC CONTROL SYSTEM, THERMOPLASTIC STRIPE, AND RUMBLE STRIP. | KERN COUNTY IN AND NEAR BUTTONWILLOW FROM LOKERN ROAD TO ROUTE 5/58 SEPARATION OVERHEAD BRIDGE. | 12/10/2024 | 1 (01/08/2024) | Details CEM-3701 Report |
| 209353 | Project ID: 209353 DEA: 060Q8304 EFIS: 0613000247 | 06-KER-178-R2.0/R7.5 | REPAIR FAILED PAVEMENT AND OVERLAY WITH RHMA (BWC-G). | KERN COUNTY IN AND NEAR BAKERSFIELD FROM WEILL PARK OVERHEAD TO 0.5 MILE WEST OF MORNING DRIVE | 03/24/2020 | 1 (12/24/2014) | Details CEM-3701 Report |
| 3098 | Project ID: 3098 DEA: 060E0604 | 06-KER-65-R0.0/0.3,0.8/6.1 | REMOVE AND REPLACE HOT MIX ASPHALT PAVEMENT. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM ROUTE 65/99 SEPARATION TO 0.1 MILE SOUTH OF 7TH STANDARD ROAD AND FROM 0.1 MILE NORTH OF 7TH STANDARD ROAD TO 1.4 MILES NORTH OF LARDO HIGHWAY | 04/02/2012 | 1 (07/07/2011) | Details CEM-3701 Report |
| 214185 | Project ID: 214185 DEA: 060T2804 | 06-KER-99-21.6/22.1,23.6/24.7 | UPGRADE IRRIGATION SYSTEM AND PLANTING. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM PLANZ ROAD OVERCROSSING TO WILSON ROAD AND FROM STOCKDALE HIGHWAY TO 0.1 MILE NORTH OF CALIFORNIA AVENUE UNDERCROSSING | 10/15/2020 | 1 (06/13/2019) | Details CEM-3701 Report |
| 212586 | Project ID: 212586 DEA: 060S4704 EFIS: 0615000048 | 06-KER-58-R55.4/R59.7 | CONSTRUCT CONTINUOUSLY REINFORCED CONCRETE AND HMA PAVEMENT. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM COTTONWOOD ROAD UNDERCROSSING TO 0.3 MILE EAST OF ROUTE 58/184 SEPARATION. | 10/14/2020 | 1 (05/15/2018) | Details CEM-3701 Report |
| 3254 | Project ID: 3254 DEA: 060J4204 | 06-KER-99-L0.0/19.5 | Grind Existing Concrete Roadway Profile. | Kern County in and near Bakersfield from 0.8 mile South of Route 5/99 Separation to Panama Lane Overcrossing. | 01/21/2010 | 1 (01/21/2010) | Details CEM-3701 Report |
| 215180 | Project ID: 215180 DEA: 060Q9204 EFIS: 0614000010 COOP: 061764 | 06-KER-99-10.4/21.2 | CONSTRUCT CRCP AND HMA (TYPE A) PAVEMENT. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.4 MILE SOUTH OF OLD US 99 OVERCROSSING TO 0.1 MILE NORTH OF WHITE LANE OVERCROSSING | 11/03/2025 | 1 (09/14/2020) | Details CEM-3701 Report |
| 1001613 | Project ID: 1001613 DEA: 060V6104 EFIS: 0616000222 | 06-KER-119-28.2/31.3 | HMA (TYPE A), RCP, CLASS 2 AB, ROADWAY EXC, AND MODIFYING SIGNAL. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.1 MILE WEST OF ASHE ROAD TO ROUTE 119/99 SEPARATION | 1 (09/15/2025) | Details CEM-3701 Report | |
| 994819 | Project ID: 994819 DEA: 060U4304 EFIS: 0616000033 | 06-KER-184-8.5/11.6 | RESURFACE LANES AND SHOULDERS. | KERN COUNTY IN AND NEAR BAKERSFIELD FROM 0.1 MILE NORTH OF EDISON HIGHWAY TO 0.1 MILE NORTH OF CHASE AVENUE | 1 (05/22/2023) | Details CEM-3701 Report |
