Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7111-7120 of 18878 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 214231 | Project ID: 214231 DEA: 051M1704 EFIS: 0519000077 | 05-SLO-1-71.5/72, 71.5/72.0 | Polar Star Emergency wall and viaduct; NOTE ON FUNDING: This is an emergency project, per PM, METS (unit 3652) is covered for work on this project under WBS 270.44. Any issues with funding please notify METS Rep. | 08/17/2022 | 1 (06/28/2019) | Details CEM-3701 Report | |
| 1000135 | Project ID: 1000135 DEA: 024H7504 EFIS: 0219000058 | 02--299-49/72 | Poker Bar Culverts | TRI 299 PM 49.0-72.0 | NOT VERIFIED | Details CEM-3701 Report | |
| 1000136 | Project ID: 1000136 DEA: 024H7504 EFIS: 0219000058 | 02--299-49/72 | Poker Bar Culverts | TRI 299 PM 49.0-72.0 | NOT VERIFIED | Details CEM-3701 Report | |
| 1000137 | Project ID: 1000137 DEA: 024H7504 EFIS: 0219000058 | 02-TRI-299-49/72 | Poker Bar Culverts | TRI 299 PM 49.0-72.0 | 1 (06/27/2025) | Details CEM-3701 Report | |
| 215757 | Project ID: 215757 DEA: 021J5704 EFIS: 0220000106 | 02-LAS-44-6.5/7.1 | Poison Lake Curve Improvement | 1 (08/23/2021) | Details CEM-3701 Report | ||
| 977 | Project ID: 977 DEA: 032A2724 EFIS: 0300000291 Permit Numbers: 0307NMC0479 | 03-YUB-70-3.0/3.8 | PLUMAS LAKE INTERCHANGE PROJECT | 12/08/2017 | 2 (11/21/2014) | Details CEM-3701 Report | |
| 7608 | Project ID: 7608 DEA: 044G2804 COOP: 42078A1 | 04-ALA-80- | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-----------SFOBB Toll Canopy Renovations | PLEASE SEE EA 04-4G2904 FOR PROJECT INFO-------------SFOBB Toll Crossing | 09/17/2012 | 1 (10/10/2012) | Details CEM-3701 Report |
| 7560 | Project ID: 7560 DEA: 07260304 EFIS: 0700000487 | 07-LA-134,405-.9/2.9,46.3/47.8 | Please Contact SMR (Mohammad Fatemi) prior to performing QA Source Inspection for this projet. Thanks. | Please Contact SMR (Mohammad Fatemi) prior to performing QA Source Inspection for this project. Thanks. | 02/09/2015 | 1 (07/16/2012) | Details CEM-3701 Report |
| 7193 | Project ID: 7193 DEA: 07260204 EFIS: 0700000486 COOP: 074892A | 07-LA-405-00.1/00.3 | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this projet. Thanks, FT CONSTRUCTION OF SOUNDWALL. METS' ROLE: QA | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this project. Thanks, FT IN LONG BEACH FR SAN GABRIEL RIVER/ NO ATHERTON UC, CONSTRUCTION OF SOUNDWALL | 02/14/2014 | 1 (05/01/2012) | Details CEM-3701 Report |
| 7551 | Project ID: 7551 DEA: 07233104 EFIS: 0700000389 | 07-LA-605-R11.4/R13.9 | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this projet. Thanks, FT | Please Contact SMR (Farzad Tasbihgoo) prior to performing QA Source Inspection for this project. Thanks, FT | 02/14/2014 | 1 (05/01/2012) | Details CEM-3701 Report |
