Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 7101-7110 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 8019 | Project ID: 8019 DEA: 060N1504 EFIS: 0600020439 | 06-KER-58-R59.6/R64.4,67.0/77.3 | OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD | 10/08/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 213445 | Project ID: 213445 DEA: 060T2004 EFIS: 0615000035 | 06-KER-99-0.0/11.2 | PAVEMENT REHABILITATION (2R) | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING | 05/16/2024 | 1 (01/09/2019) | Details CEM-3701 Report |
| 208641 | Project ID: 208641 DEA: 060Q3604 | 06-KER-119-19.7/30.4 | COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD | 10/08/2014 | 1 (08/22/2013) | Details CEM-3701 Report |
| 1001616 | Project ID: 1001616 DEA: 061C0604 EFIS: 0621000014 | 06-KER-223-1.8/10.4 | FULL DEPTH RECYCLE AND V-DITCHES. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION | 1 (10/06/2025) | Details CEM-3701 Report | |
| 7777 | Project ID: 7777 DEA: 060G8404 EFIS: 0600020166 COOP: 061474A1 | 06-KER-99-27.0/R28.4 | CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL | 12/19/2014 | 1 (12/10/2012) | Details CEM-3701 Report |
| 212953 | Project ID: 212953 DEA: 060U9904 EFIS: 0616000084 | 06-KER-65-1.6/25.2 | INSTALL CENTERLINE AND SHOULDER RUMBLE STRIPS. | KERN COUNTY NEAR BAKERSFIELD FROM IMPERIAL STREET TO TULARE COUNTY LINE | 12/07/2018 | 1 (06/05/2018) | Details CEM-3701 Report |
| 211297 | Project ID: 211297 DEA: 060S6504 EFIS: 0614000207 | 06-KER-5-36.1/41.2 | CONSTRUCT HIGH TENSION CABLE BARRIER. | KERN COUNTY NEAR BAKERSFIELD FROM BUENA VISTA CANAL ROAD OVERCROSSING TO ROUTE 5/43 SEPARATION | 04/16/2021 | 1 (10/04/2016) | Details CEM-3701 Report |
| 209098 | Project ID: 209098 DEA: 060Q9704 EFIS: 0614000042 | 06-KER-178-15.2/16.7 | Repair Roadway/Slope | Kern County near Bakersfield from 5.6 miles east of the 178/184 Jct to 7.1 miles east of the 178/184 at Ker 15.2/16.7 | 12/14/2020 | 1 (09/06/2013) | Details CEM-3701 Report |
| 1000024 | Project ID: 1000024 DEA: 061G1204 EFIS: 0623000149 | 06-KER-178-13.6/24.6 | HOT MIX ASPHALT, PRECOATED AGGREGATE AND ASPHALT-RUBBER BINDER. | KERN COUNTY NEAR BAKERSFIELD FROM 1.9 MILES EAST OF COTTONWOOD CREEK BRIDGE TO 2.0 MILES WEST OF DEMOCRAT ROAD | 01/31/2025 | 1 (01/08/2024) | Details CEM-3701 Report |
| 214809 | Project ID: 214809 DEA: 060Y0504 EFIS: 0619000153 | 06-KER-5-30.8/40.0 | COLD PLANE AC PAVEMENT AND PLACE RHMA-O. | KERN COUNTY NEAR BAKERSFIELD FROM 1.7 MILES NORTH OF OLD RIVER ROAD OVERCROSSING TO 1.2 MILES NORTH OF ROUTE 119/5 SEPARATION | 10/14/2020 | 1 (03/19/2020) | Details CEM-3701 Report |
