Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 7101-7110 of 19037 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
8019Project ID: 8019
DEA: 060N1504
EFIS: 0600020439
06-KER-58-R59.6/R64.4,67.0/77.3OVERLAY WITH HOT MIX ASPHALT (BONDED WEARING COURSE)KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 58/184 SEPARATION TO 0.2 MILE WEST OF TEJON HIGHWAY OVERCROSSING AND FROM 0.3 MILE WEST OF CALIENTE CREEK BRIDGE TO 0.2 MILE EAST OF BEALVILLE ROAD10/08/20141 (12/10/2012)Details CEM-3701 Report
213445Project ID: 213445
DEA: 060T2004
EFIS: 0615000035
06-KER-99-0.0/11.2PAVEMENT REHABILITATION (2R)KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/99 SEPARATION TO 0.3 MILE NORTH OF OLD US 99 OVERCROSSING05/16/20241 (01/09/2019)Details CEM-3701 Report
208641Project ID: 208641
DEA: 060Q3604
06-KER-119-19.7/30.4COLD IN-PLACE RECYCLING AND PAVEMENT RESURFACING.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 5/119 SEPARATION TO WIBLE ROAD10/08/20141 (08/22/2013)Details CEM-3701 Report
1001616Project ID: 1001616
DEA: 061C0604
EFIS: 0621000014
06-KER-223-1.8/10.4FULL DEPTH RECYCLE AND V-DITCHES.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 223/5 SEPARATION TO 0.1 MILE WEST OF ROUTE 223/99 SEPARATION 1 (10/06/2025)Details CEM-3701 Report
7777Project ID: 7777
DEA: 060G8404
EFIS: 0600020166
COOP: 061474A1
06-KER-99-27.0/R28.4CONSTRUCT INSIDE LANES, SHOULDERS, AND CONCRETE BARRIER.KERN COUNTY NEAR BAKERSFIELD FROM ROUTE 204/99 SEPARATION TO BEARDSLEY CANAL12/19/20141 (12/10/2012)Details CEM-3701 Report
212953Project ID: 212953
DEA: 060U9904
EFIS: 0616000084
06-KER-65-1.6/25.2INSTALL CENTERLINE AND SHOULDER RUMBLE STRIPS.KERN COUNTY NEAR BAKERSFIELD FROM IMPERIAL STREET TO TULARE COUNTY LINE12/07/20181 (06/05/2018)Details CEM-3701 Report
211297Project ID: 211297
DEA: 060S6504
EFIS: 0614000207
06-KER-5-36.1/41.2CONSTRUCT HIGH TENSION CABLE BARRIER.KERN COUNTY NEAR BAKERSFIELD FROM BUENA VISTA CANAL ROAD OVERCROSSING TO ROUTE 5/43 SEPARATION04/16/20211 (10/04/2016)Details CEM-3701 Report
209098Project ID: 209098
DEA: 060Q9704
EFIS: 0614000042
06-KER-178-15.2/16.7Repair Roadway/SlopeKern County near Bakersfield from 5.6 miles east of the 178/184 Jct to 7.1 miles east of the 178/184 at Ker 15.2/16.712/14/20201 (09/06/2013)Details CEM-3701 Report
1000024Project ID: 1000024
DEA: 061G1204
EFIS: 0623000149
06-KER-178-13.6/24.6HOT MIX ASPHALT, PRECOATED AGGREGATE AND ASPHALT-RUBBER BINDER.KERN COUNTY NEAR BAKERSFIELD FROM 1.9 MILES EAST OF COTTONWOOD CREEK BRIDGE TO 2.0 MILES WEST OF DEMOCRAT ROAD01/31/20251 (01/08/2024)Details CEM-3701 Report
214809Project ID: 214809
DEA: 060Y0504
EFIS: 0619000153
06-KER-5-30.8/40.0COLD PLANE AC PAVEMENT AND PLACE RHMA-O.KERN COUNTY NEAR BAKERSFIELD FROM 1.7 MILES NORTH OF OLD RIVER ROAD OVERCROSSING TO 1.2 MILES NORTH OF ROUTE 119/5 SEPARATION10/14/20201 (03/19/2020)Details CEM-3701 Report