Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6991-7000 of 19037 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 1000114 | Project ID: 1000114 DEA: 060W8204 EFIS: 0617000304 | 06-KIN-41-28.4/R40.1 | COLD PLANE WITH HOT MIX ASPHALT (TYPE A) AND RHMA-G. | KINGS COUNTY AT AND NEAR STRATFORD FROM NEVADA AVENUE TO ROUTE 41/198 SEPARATION | 1 (02/26/2024) | Details CEM-3701 Report | |
| 1000063 | Project ID: 1000063 DEA: 061F8804 EFIS: 0623000106 | 06-KIN-41-R39.9/R48.3 | COLD PLANE, HMA PAVING, AND INDIVIDUAL CONCRETE SLAB REPLACEMENT. | KINGS COUNTY AT AND NEAR LEMOORE FROM ROUTE 41/198 SEPARATION TO FRESNO COUNTY LINE | 04/11/2025 | 1 (01/29/2024) | Details CEM-3701 Report |
| 213877 | Project ID: 213877 DEA: 060X8904 EFIS: 0618000179 | 06-KIN-41-0.0/11.5 | COLD PLANE AC PAVEMENT AND PLACE RHMA TYPE G. | KINGS COUNTY ABOUT 6.5 MILES SOUTH OF KETTLEMAN CITY FROM KERN COUNTY LINE TO 0.1 MILE SOUTH OF UTICA AVENUE | 04/16/2021 | 1 (04/11/2019) | Details CEM-3701 Report |
| 7255 | Project ID: 7255 DEA: 060L0504 EFIS: 0600000936 | 06-KIN,TUL-198-R21.5/28.3,0.0/R3.4 | INSTALL IRRIGATION SYSTEM AND HIGHWAY PLANTING. | KINGS AND TULARE COUNTIES NEAR HANFORD FROM 0.5 MILE EAST OF ROUTE 43/198 SEPARATION TO 0.4 MILE WEST OF ROUTE 99/198 SEPARATION | 08/29/2017 | 1 (08/17/2012) | Details CEM-3701 Report |
| 3321 | Project ID: 3321 DEA: 060L1004 | 06-KIN,TUL-43,63,198-VAR | PLACE RUBBERIZED HOT MIX ASPHALT ON EXISTING PAVEMENT. | KINGS AND TULARE COUNTIES AT VARIOUS LOCATIONS | 12/13/2012 | 1 (04/18/2011) | Details CEM-3701 Report |
| 214619 | Project ID: 214619 DEA: 060U3004 EFIS: 0616000027 | 06-KIN,TUL-63,99,137,198,216-Var | REPAIR DAMAGED AND REPLACE STOLEN ELECTRICAL SYSTEMS. | KINGS AND TULARE COUNTIES AT VARIOUS LOCATIONS | 05/10/2023 | 1 (01/31/2020) | Details CEM-3701 Report |
| 6952 | Project ID: 6952 DEA: 060N2804 | 06-KIN,MAD-33,41,145-Var | PLACE POLYMER MODIFIED CHIP SEAL ON EXISTING PAVEMENT. | KINGS AND MADERA COUNTIES AT VARIOUS LOCATIONS | 07/02/2012 | 1 (01/23/2012) | Details CEM-3701 Report |
| 214183 | Project ID: 214183 DEA: 060T2304 EFIS: 0615000040 | 06-KIN,FRE-5-26.4/26.7,0.0/1.7 | UPGRADE WATER AND WASTEWATER SYSTEMS FOR SAFETY ROADSIDE REST AREA. | KINGS AND FRESNO COUNTIES, FROM 0.2 MILE SOUTH OF AVENAL CUT-OFF ROAD OVERCROSSING TO QUIST UNDERCROSSING | 04/14/2021 | 1 (06/13/2019) | Details CEM-3701 Report |
| 3363 | Project ID: 3363 DEA: 060M4904 | 06-KIN,FRE-41,269-R46.1/R48.3,0.5/12.7 | POLYMER MODIFIED CHIP SEAL | KINGS AND FRESNO COUNTIES ON ROUTE 41 FROM 0.2 MILE SOUTH OF FLINT AVENUE TO EXCELSIOR AVENUE UNDERCROSSING AND ON ROUTE 269 FROM ROUTE 5 TO ROUTE 198 | 11/04/2011 | 1 (11/04/2011) | Details CEM-3701 Report |
| 211463 | Project ID: 211463 DEA: 060S3504 EFIS: 0614000115 | 06-KIN,FRE-5-21.6/26.7,0/2.3,10.9/14.9 | CONSTRUCT HIGH TENSION CABLE MEDIAN BARRIER. | KINGS AND FRESNO COUNTIES NEAR KETTLEMAN CITY FROM 2.6 MILES NORTH OF MILHAM AVENUE OVERCROSSING TO 3.2 MILES SOUTH OF JAYNE AVENUE OVERCROSSING AND FROM EL DORADO AVENUE OVERCROSSING TO ROUTE 5/198 SEPARATION | 03/12/2020 | 1 (10/04/2016) | Details CEM-3701 Report |
