Projects

To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.
Displaying 6971-6980 of 18878 results.
Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
211326Project ID: 211326
Permit Numbers: 04126DP1682 0413NMC0300 04156RT2328 0415NRD2331 04126MC1682
04-SCL-280-1.62/1.62Proposed sidewalk,curb and gutter to be installed along north side of E. Virginia with new roadway and curb inlet installed along northern half of E. Virginia Street section.280 Off-Ramp & E. Virginia St., San Jose01/18/20191 (03/21/2016)Details CEM-3701 Report
994150Project ID: 994150
DEA: 033J7704
EFIS: 0323000001
03-NEV-49-1.66/1.66Proposed scope of work includes site preparation, traffice control, sawcut, excavation, remove and replace 170' 24" CMP, backfill. Minor HMA, striping, and incidental work 07/26/20231 (08/05/2022)Details CEM-3701 Report
209753Project ID: 209753
Permit Numbers: 0411NMC0671 0414NRW0590 04146DP1400
04-ALA-680-16.561/16.561Proposed project will include widening of the existing ramps at the rte 680/Bernal Avenue interchange in Pleasanton. Traffic signal modifications will be performed at two locations and widening will also be performed on Bernal Avenue.Hwy 680 and Ramps, Pleasanton08/21/20182 (07/21/2014)Details CEM-3701 Report
209371Project ID: 209371
DEA: 041J2904
EFIS: 0414000180
Permit Numbers: 0414NDP1478 0414NSN0920
04-ALA--0.82/1.02Proposed project will include intersection modification. Work will include traffic signal modifications, roadway widening, striping, and construction of new utility lines.IN ALAMEDA COUNTY IN OAKLAND AT I-80, I-880 CONNECTOR/MARITIME STREET03/14/20192 (02/01/2016)Details CEM-3701 Report
208563Project ID: 208563
Permit Numbers: 04106RC1942 04126DP1266
04-SM-82-16.44/16.44Proposed improvements within the State right-of-way include removal and replacement of concrete curb,gutter,and sidewalk.525 El Camino Real, Millbrae09/14/20181 (01/29/2013)Details CEM-3701 Report
210975Project ID: 210975
Permit Numbers: 04156DP2177 0414NMC0989
04-SF-114-5.15/5.32Proposed improvements include reconstruction of Willow Road and Newbridge Street intersection,roadway widening for an additional westbound through/right-turn lane,curb reconstruction,utility relocations,traffic signal modifications,and signing and striping improvements.Willow Road, Menlo Park08/22/20181 (10/27/2015)Details CEM-3701 Report
213311Project ID: 213311
DEA: 120Q4604
EFIS: 1217000047
12-ORA-55-17.0PROPOSE PARK AND RIDE LOT FOR TOTAL OF 182 SPACES INCLUDING HC.ORANGE COUNTY IN ORANGE AT LINCOLN AVENUE UNDERCROSSING01/04/20211 (01/28/2019)Details CEM-3701 Report
212345Project ID: 212345
DEA: 044G2204
EFIS: 0412000314
04-SON-12-17.75-18.20PROJECT: SONOMA 12 FARMERS LANE MEDIAN BARRIER MICROPILESIN SONOMA COUNTY ON ROUTE 12, IN SANTA ROSA FROM FARMERS LANE TO BRUSH CREEK RD.03/12/20211 (10/18/2017)Details CEM-3701 Report
1554Project ID: 1554
COOP: 042096
Permit Numbers: 0408NMC0004 0408NDP0223 0409NRT0935 0409NRT1698 0409NRT1323
04-SCL-280-10.3/10.3Project will construct a cable-stayed bridge over I-280 for use by cyclists and peds. Length will be 503'-4" with a 325' center span and 89'-2" back spans. The two bridge towers and superstructure will be steel. The 13'10300 Torre Ave, Cupertino08/20/2018NOT VERIFIEDDetails CEM-3701 Report
209852Project ID: 209852
Permit Numbers: 0414NMC0919 0414NRW1770
04-ALA-880-8/9Project replaces an existing RR spur track under West Grand Avenue with a new double track rail spur as part of the Oakland Army Base Redevelopment project.West Grand Ave, Oakland08/21/2018NOT VERIFIEDDetails CEM-3701 Report