Project IDProject IdentifiersDIST-CO-RTE-PMWork DescriptionLocation DescriptionCaltrans Closeout DateMETS Service LevelActions
     
1100Project ID: 1100
DEA: 033A0104
03-SAC-5-25.0/36.6GRIND PCC, SLAB REPLACEMENT, PLACE RUBBERIZED AC AND MBGR.Sacramento County in Sacramento from Route 5/160 Separation and Overhead to 0.4 KM North of Route 5/50 Separation.12/21/20091 (12/21/2009)Details CEM-3701 Report
6262Project ID: 6262
DEA: 112M0704
11-SD-805-18.2/20.4Grind Portland Cement Concrete and overlay shoulders.SAN DIEGO COUNTY IN SAN DIEGO FROM 0.7 MILE SOUTH OF MURRAY RIDGE ROAD OVERCROSSING TO 0.2 MILE SOUTH OF ROUTE 163/805 SEPARATION02/04/20111 (04/19/2010)Details CEM-3701 Report
7284Project ID: 7284
DEA: 034M3004
03-PLA,NEV-80-68.5/69.8,0.0/R2.5GRIND PORTLAND CEMENT CONCRETE PAVEMENT. COLD PLANE AC PAVEMENT.PLACER AND NEVADA COUNTIES FROM TROY ROAD UNDERCROSSING TO SODA SPRINGS OVERCROSSING01/04/20131 (05/14/2012)Details CEM-3701 Report
209481Project ID: 209481
DEA: 034M8404
EFIS: 0313000074
03-NEV-80-21.2/28.1GRIND WEARING COURSE, PROFILE GRIND PCC, APPLY CONCRETE HARDENERNEVADA COUNTY NEAR TRUCKEE FROM TRUCKEE RIVER BRIDGE 17-0012 TO TRUCKEE RIVER BRIDGE 17-006302/23/20161 (05/20/2014)Details CEM-3701 Report
995064Project ID: 995064
DEA: 112N1424
EFIS: 1121000265
11-SD-52,125-13.8,13.8GRIND, CLEAN AND REPAIR BRIDGE DECK, OVERLAY WITH POLYESTER CONCRETE.SAN DIEGO COUNTY IN SANTEE ON ROUTE 52 AT SAN DIEGO RIVER-HOLLINS LAKE BRIDGE AND IN LA MESA ON ROUTE 125 AT PANORAMA DRIVE UNDERCROSSING.09/17/20241 (01/02/2024)Details CEM-3701 Report
212828Project ID: 212828
DEA: 07309804
EFIS: 0714000304
07-LA-605-R10.1/R15.7,20.9/25.6GRINDING AND PLACING CONCRETE PAVEMENTLOS ANGELES COUNTY IN SANTA FE SPRINGS AND IRWINDALE FROM TELEGRAPH ROAD UNDERCROSSING TO ROSE HILLS ROAD OVERCROSSING AND FROM RAMONA BOULEVARD OVERCROSSING TO ROUTE 605/210 SEPARATION04/30/20191 (05/02/2018)Details CEM-3701 Report
213218Project ID: 213218
DEA: 071W9604
07-LA-47-R0.0/0.8GRINDING AND REPLACING SLABS AND BONDED WEARING COURSELOS ANGELES COUNTY IN LOS ANGELES FROM 0.1 MILE SOUTH OF ROUTE 47/110 SEPARATION TO HARBOR BOULEVARD UNDERCROSSING06/17/20211 (06/17/2021)Details CEM-3701 Report
4130Project ID: 4130
DEA: 072P8804
EFIS: 0700000612
MINOR: 07A2933
07-LA-105-16.4GRINDING THE CROSS GUTTER, GRINDING THE RAMP TERMINUS, COLD PLANNING AND OVERLAYING ASPHALT CONCRETE AT THE CROSS GUTTERON E/B ROUTE 105 OFF RAMP TO BELLFLOWER BLVD, IN THE CITY OF DOWNEY.07/19/20172 (07/09/2021)Details CEM-3701 Report
211302Project ID: 211302
DEA: 071W9804
EFIS: 0713000082
07-LA-91,110-6.1/R11.4,9.6/10.3GRINDING, COLD PLANE OVERLAY, AND PAVINGLOS ANGELES COUNTY ON ROUTE 91 FROM 0.1 MILE EAST OF VERMONT AVENUE TO BUTLER AVENUE UNDERCROSSING AND ON ROUTE 110 FROM 0.3 MILE SOUTH TO 0.4 MILE NORTH OF ROUTE 110/91 SEPARATION03/27/20191 (08/16/2016)Details CEM-3701 Report
208628Project ID: 208628
DEA: 120L6504
EFIS: 1212000154
12-ORA-22-1.1/13.2GRINDING, GROOVING, COLD PLANING AND PAVEMENT DELINEATIONORANGE COUNTY, IN WESTMINSTER, GARDEN GROVE, SANTA ANA AND ORANGE, FROM VALLEY VIEW STREET TO ROUTE 5505/28/2014NOT VERIFIEDDetails CEM-3701 Report