Projects
To search for a project, enter filter criteria in the appropriate input field below. If a project is not listed, please contact a METS Representative for assistance.Displaying 6931-6940 of 18775 results.
| Project ID | Project Identifiers | DIST-CO-RTE-PM | Work Description | Location Description | Caltrans Closeout Date | METS Service Level | Actions |
|---|---|---|---|---|---|---|---|
| 3423 | Project ID: 3423 DEA: 06415904 | 06-KIN-41-11.6/20.0 | PLACE HOT MIX ASPHALT ON EXISTING PAVEMENT AND WIDEN SHOULDERS. | KINGS COUNTY NEAR KETTLEMAN CITY FROM 0.1 MILE SOUTH OF UTICA AVENUE TO 0.1 MILE SOUTH OF QUAIL AVENUE | 07/05/2012 | 1 (05/11/2011) | Details CEM-3701 Report |
| 993855 | Project ID: 993855 DEA: 060U4604 EFIS: 0615000309 | 06-KIN-41-20.0-28.4 | COLD CENTRAL PLANT RECYCLING, HMA AND HMA-OGFC. | KINGS COUNTY NEAR KETTLEMAN CITY FROM 0.1 MILE SOUTH OF QUAIL AVENUE TO NEVADA AVENUE | 05/09/2025 | 1 (05/20/2022) | Details CEM-3701 Report |
| 7254 | Project ID: 7254 DEA: 060J0504 EFIS: 0600000157 | 06-KIN-43-24.2/24.7 | INSTALL SIGNAL AND LENGTHEN LEFT TURN CHANNELIZATION | KINGS COUNTY NEAR HANFORD FROM 0.8 MILE NORTH OF ELDER AVENUE TO 0.8 MILE SOUTH OF DOVER AVENUE | 01/18/2013 | 1 (07/24/2012) | Details CEM-3701 Report |
| 212790 | Project ID: 212790 DEA: 060T9504 EFIS: 0615000119 | 06-KIN-33,43-0.0/7.8,3.7/27.3 | REPAIR FAILED AREA, PLACE RUMBLE STRIPS AND TRAFFIC STRIPES. | KINGS COUNTY NEAR AVENAL ON ROUTE 33 FROM KERN COUNTY LINE TO ROUTE 41 AND IN AND NEAR HANFORD ON ROUTE 43 FROM 1.4 MILES SOUTH OF NEVADA AVENUE TO FRESNO COUNTY LINE | 08/24/2018 | 1 (04/04/2018) | Details CEM-3701 Report |
| 210559 | Project ID: 210559 DEA: 060N1804 EFIS: 0600020552 | 06-KIN-8,15,163-R8.8/R10.6 | CONSTRUCT CONCRETE BARRIER AND INSTALL NEW DRAINAGE SYSTEM. | KINGS COUNTY IN LEMOORE FROM ROUTE 41/198 SEPARATION TO 18TH AVENUE OVERCROSSING | 02/21/2017 | 1 (07/21/2015) | Details CEM-3701 Report |
| 212309 | Project ID: 212309 DEA: 06416014 EFIS: 0612000198 | 06-KIN-41-R40.6/R41.1 | INSTALL PLANTS AND IRRIGATION SYSTEM. | KINGS COUNTY IN LEMOORE FROM 0.3 MILE SOUTH OF BUSH STREET UNDERCROSSING TO 0.2 MILE NORTH OF BUSH STREET UNDERCROSSING | 04/14/2021 | 1 (10/27/2017) | Details CEM-3701 Report |
| 209261 | Project ID: 209261 DEA: 06487504 EFIS: 0600000488 | 06-KIN-198-R16.5/R17.2 | RE-CONSTRUCT INTERCHANGE | KINGS COUNTY IN HANFORD FROM 0.4 MILE WEST OF 12TH AVENUE OVERCROSSING TO 0.3 MILE EAST OF 12TH AVENUE OVERCROSSING | 02/21/2017 | 1 (08/11/2014) | Details CEM-3701 Report |
| 212476 | Project ID: 212476 DEA: 06487514 EFIS: 0614000073 | 06-KIN-198-R16.5/R17.2 | HIGHWAY PLANTING. | KINGS COUNTY IN HANFORD FROM 0.4 MILE WEST OF 12TH AVENUE OVERCROSSING TO 0.3 MILE EAST OF 12TH AVENUE OVERCROSSING | 10/22/2020 | 1 (12/28/2017) | Details CEM-3701 Report |
| 212425 | Project ID: 212425 DEA: 060T5104 EFIS: 0615000096 | 06-KIN-198-R18.4 | INSTALL SIGNALS AND MODIFY CURB RAMPS. | KINGS COUNTY IN HANFORD AT REDINGTON STREET AND 4TH STREET INTERSECTION | 11/23/2021 | 1 (09/20/2017) | Details CEM-3701 Report |
| 210022 | Project ID: 210022 DEA: 06325514 EFIS: 0612000052 | 06-KIN-105,170-R8.9/R10.1 | LANDSCAPING AND PLANT ESTABLISHMENT. | KINGS COUNTY IN AND NEAR LEMOORE FROM ROUTE 41/198 SEPARATION TO 18 1/2 AVENUE | 03/12/2020 | 1 (02/20/2015) | Details CEM-3701 Report |
